Yen Phong 2, 2C Industrial Park
VSIP Bac Ninh Co., Ltd (VSIP BACNINH)
Kinh Bac Urban Development Corporation (KBC)
- Address: Tam Giang, Yen Phong, Bac Ninh
- Total area: 1,000ha
Yen Phong 2 Industrial Park and Urban Area was established under the Prime Minister's Decision No. 856 /TTg-CN dated June 28, 2007 with a total planning area of 1,200 ha, of which the area of the Industrial Park - for production area is 1,000 ha, urban area is 200 ha.
Categories
|
Detail
|
OVERVIEW:
|
Infrastructure investors
|
VSIP Bac Ninh Co., Ltd (VSIP BACNINH)
Kinh Bac Urban Development Corporation (KBC)
|
Place
|
Yen Phong, Bac Ninh
|
Acreage
|
total area
|
1,000ha
|
Factory land area
|
|
Space available
|
Tree density >15%
|
The percentage of trees
|
|
Operating time
|
50 years
|
Current Investor
|
|
Main job
|
Electronic, Machine
|
Occupancy
|
0%
|
LOCATION & DISTANCE:
|
Road
|
Distance from Hanoi capital: 38km
|
Air
|
To Noi Bai International airport: 15km
|
Train
|
|
Seaport
|
Hai Phong port: 145km
|
INFRASTRUCTURE:
|
Geological
|
Hard soil: 1.5-2.5kg/cm2
|
Internal traffic
|
Main road
|
Width: 32m, Number of lanes: 4 lanes
|
Side branch road
|
Width: 23m, Number of lanes: 2 lanes
|
Electricity supply
|
Voltage
|
Power line: 110/22KV
|
Power capacity
|
40MVA
|
Clean water
|
Wattage
|
TCKCN-VN: 40m3/ha/day
|
Highest capacity
|
6000m3/day
|
Waste water treatment system
|
Wattage
|
6000m3/day
|
Internet and telecommunications
|
ADSL, Fireber & Telephone line
|
LEASING PRICE:
|
Land
|
Land rents
|
105 USD
|
Lease term
|
2057
|
Type/Grade
|
Level A
|
Payment methods
|
12 months
|
Deposit
|
0.05
|
Minimum area
|
1 ha
|
Workshop
|
3-4USD
|
Management fee
|
Management fee
|
0.5 USD/m2
|
Payment methods
|
3 months/12 months
|
Electricity price
|
Peak
|
0.1 USD
|
Normal
|
0.05 USD
|
Idle
|
0.03 USD
|
Payment methods
|
Monthly
|
Supplier
|
EVN
|
Clean water price nước
|
Water price
|
0.4 USD/m3
|
Payment methods
|
Monthly
|
Water supplier
|
Charged by Gov. suppliers
|
Wastewater fee
|
Price
|
0.3 USD/m3
|
Payment methods
|
Monthly
|
Water quality before treatment
|
Level B
|
Water quality after treatment
|
Level A
|
Contact:
|
National One Stop Services and Investments Organization
Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.
- Ms Hien Do – 0908 069 399 – hien.dt@nso.com.vn
- Mr Cuong Phan – 0913 855 528 – cuong.pd@nso.com.vn
- Ms. Truc Tran – 0396 296 580 – truc.tn@nso.com.vn
|