Infrastructure of VSIP Quang Ngai Industrial Park
- The central road axis in the Industrial Park is planned to be up to 56m wide for 4 to 6 lanes; the main roads in the Industrial Park are 23m wide with 2 lanes; The lighting system is set up along the roads
- Power system: taken from the national grid system through 110KV and 22KV power grid, brought to 63MVA substation in the area, and brought to each substation of factories and industrial parks.
- Clean water system: The industrial park is built with a system of clean water supply plants with a designed capacity of 45,000m3/day (phase 1 is 5,000m3/day).
- Waste water treatment: Industrial Park Invested in building a wastewater treatment station that meets the standards of the Ministry of Natural Resources and Environment with a design capacity of 60,000m3/day (phase 1 capacity is 6,000m3/day)
- Fire fighting system: fire prevention and fighting system meets national standards, fire hydrants are arranged along the road of the Industrial Park (about 100-120m/pillar) to ensure fire prevention in case of emergency. try
- Communication system: A modern communication system provides a full range of post and telecommunications services. With a switchboard with up to 1,200 contact numbers
|