Van Ninh Industrial Park

Aug 16, 2021

VAN NINH INDUSTRIAL PARK

• Investor: Van Phong Economic Zone Management Board

• Consultant: VINACONEX Construction Consulting Joint Stock Company

• Location: Van Ninh industrial park in Van Thang commune, Van Ninh district, Khanh Hoa province

• Area: 153.17ha

1

• Area: With an area of 153.17 ha, designed synchronously and modernly with a large internal traffic system, large green area, electricity, water supply and drainage in Van Ninh industrial park in accordance with national standards. Flexible land plots, suitable for many types of factories

• Term: 50 years (since 2004)

• Land legal:Red book

 

• Industrial park orientation: Van Ninh is oriented to be a multi-industry industrial park using modern high technology in accordance with international standards and being environmentally friendly, expected to attract industries such as:

Mechanical assembly, production of spare parts, electronic components

Consumer production, handicrafts

Textile industry

Food processing and agricultural products and some other industries

 

2

Location:

 

515km from Ho Chi Minh City

520 km from Tan Son Nhat airport, 50 km from Tuy Hoa airport

Van Phong Port 30km

3

 

Infrastructure & facilities:

 

Landscape: More than 12% of the total area of ​​the industrial park is planted with trees along the roads and other areas

Lawns and public green areas are planted to improve the industrial environment

Projects to build factories and other buildings must be approved by management

 

Land condition: Average leveling height 9m/ Soil quality: hard leveled

Internal traffic system: reasonably designed to ensure smooth traffic throughout the industrial park. The system is designed as follows:

+ The main roads in the industrial park are 32 m wide - 4 lanes

+ Branch roads in the industrial park are 23 m wide - 2 lanes

All internal roads are designed and constructed in strict compliance with national regulations, and finished with Asphalt asphalt. The internal roads are also equipped with a complete, aesthetic high-pressure lighting system

 

Power supply system: The power supply to the industrial park is taken from 110/35/22KV substation. High voltage electricity network is provided along the internal traffic in the industrial park.

 

Water supply system: Clean water is supplied with a capacity of 30,000 m3 per day from the clean water plant. Water is supplied to the factory fence by an international standard water supply pipe system.

 

Waste water and waste treatment system: Waste water is collected to the industrial park's wastewater treatment plant to meet water standard A (QCVN 40:2011/BTNMT) before being discharged to the general system of the industrial park. The wastewater plant was built with a treatment capacity of 2,900m3/day – night

 

Waste is contracted by factories in the industrial park to classify, collect and transport garbage out of the industrial park to avoid causing environmental pollution.

Exhaust gases of factories are installed with national standard filtration systems before being discharged into the natural environment

 

Communication system: the industrial park is installed with an underground communication cable system and is provided to the fence of the factory by an international standard cable system.

 

Through the connection system between the communication center of the industrial park through the post and telecommunications network, all communication needs are guaranteed and are capable of providing all necessary services such as: Private switchboard , international telephone, teleconference, leased line, high speed internet, email, etc.

 

Fire prevention and fighting system: the industrial park is installed with a warning, prevention and fire fighting system in strict compliance with national regulations.

 

Fire hydrants are installed at the internal traffic hubs, and at all factories to ensure effective protection of the whole area from fire and explosion incidents.

 

Finance: The system of banks such as Vietinbank, Vietcombank, Sacombank, Agribank, BIDV, techcombank has branches around the industrial park.

 

Customs: All customs formalities are done at Customs

4

 

Management fee:

Industrial park management fee: 1USD/m2/year. This fee is paid annually in the first month of the year

Electricity fee: 0.1 USD during peak hours/ 0.05 USD during normal hours/ 0.03 USD during off-peak hours

Clean water usage fee: 0.40 USD/m3. The amount of clean water used is calculated according to the reading on the water meter

Waste water & solid waste treatment fee: $0.28/m3. Pre-treatment quality requirement is grade B after treatment is grade A

 

Rental price: according to the policy of the Management Board of Van Phong Economic Zone

5

 

For more information, please contact

National One Stop Services and Investments Organization

Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.

Please contact:

  1. Ms Hien Do – 0908 069 399 – hien.dt@nso.com.vn
  2. Mr Cuong Phan – 0913 855 528 – cuong.pd@nso.com.vn
  3. Ms. Truc Tran – 0396 296 580 – truc.tn@nso.com.vn

 

 

Tags