1
|
1. Location of the Industrial Park: Located in the administrative boundary of Vinh Hao Commune, Tuy Phong District, Binh Thuan Province; The North: adjacent to the Project Land - Vinh Hai Residential Area; East: bordering National Highway 1A ; West: bordering Vinh Hao mineral water exploitation area ; South: bordering Vinh Hao mineral spring service area;
2. Project scale: Total project area is 150 ha.
|
2
|
3. Advantage:
3.1. By road: Located next to the intersection of the Trans-Vietnam Expressway (speed 120km/h) with NationalHighway 1A, from here it is very convenient to connectwithmajor economic centers such as: Ho Chi Minh City, Nha Trang City, …
3.2. By sea: 8 km from Vinh Tan international general port, the port has a Customs Branch to carry out customs clearance procedures at the port.
3.3. Railway: The industrial park is located near the North-South railway axis, 01 km from Vinh Hao Station, 30 km from Phan Rang Station, 90 km from Phan Thiet Station.
3.4. Air: TheAirportInternationalCam Ranh - 125 km; fromTan Son Nhat International Airport - TP. Ho Chi Minh City –285km; DistanceInternational AirportLong Thanh-250km(expected operationalphase 1in 2025); fromPhan Thiet Airport - 80 km(expected operational by 2023).
4. Land use term: until December 31, 2063.
|
3
|
Infrastructure of Tuy Phong Industrial Park
CATEGORIES
|
DESCRIPTION
|
Road in Industrial Park
|
The main road has a width of 35m, an internal road of 24-28m, with a load of H30, ensuring that containers and other vehicles of enterprises can easily and conveniently circulate and transport goods.
|
Power system
|
Source 110/22KV, Capacity 40 MW can increase capacity when needed.
|
Water supply system
|
Water plant: Industrial park water plant has a capacity of 7,500m 3 /day and night.
Main pipe system F 200mm – 300mm and branch pipe F 150mm – F 100mm
|
Fire protection system
|
Fire protection water poles are 150m apart, F 100mm
|
Drainage system
|
Rainwater is drained through a reinforced concrete circular sewer system, meeting the rainwater drainage requirements of factories and industrial zones.
|
Water treatment factory
|
Capacity 4,000 m 3 /day and night. Phase 1 is invested and built with a capacity of 2,000 m 3 /day and night.
- Secondary investor internally treats wastewater discharged to column B – standard QCVN 40: 2011/BTNMT
- The industrial park continues to treat wastewater to column A – standard QCVN 40: 2011/BTNMT
|
Telecommunications system
|
Fiber optic network, high speed internet, post and telecommunications services will be provided from VNPT Binh Thuan.
|
Parking lot
|
Scale 19,000m 2 .
|
Geological features of topography
|
Hard geology, favorable for construction, average soil strength reaches 2.5kg/cm 2
The terrain is relatively flat, the leveling slope is 0.5%, the terrain slope is 0.8%
|
|
4
|
6. Prioritize the projects in the following sectors: Manufacturing industries bi ế n industries serving agriculture, forestry and fisheries; Group of industries producing pharmaceuticals, cosmetics and medical equipment; Mechanical assembly industry group; Steel and aluminum rolling industry; Agriculture, forestry and seafood processing industry; Industry of garment, leather shoes; Group of industries producing building materials; Paper industry group; Group of industries producing household goods; Wood industry group; Group of electricity industry; Industry of rubber and plastic products; Preparation of grease and oils; Industry produces a number of other consumer goods .
|
5
|
7. For more information, please contact
National One Stop Services and Investments Organization
Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.
Please contact:
- Ms Hien Do – 0908 069 399 – hien.dt@nso.com.vn
- Mr Cuong Phan – 0913 855 528 – cuong.pd@nso.com.vn
- Ms. Truc Tran – 0396 296 580 – truc.tn@nso.com.vn
|