Tien Son Industrial Park

Jul 02, 2021

Tien Son Industrial Park - Bac Ninh

Investor: Viglacera Corporation Joint Stock Company - JSC

Address: Tu Son town, Bac Ninh province

Total area: 449ha

Overview of Tien Son-Bac Ninh Industrial Park 

Tien Son Industrial Park - Bac Ninh is a large-scale industrial park with 100% occupancy. This is an industrial park established under Decision No. 1129/QD-TTg dated December 18, 1998 of the Prime Minister with an area of ​​449ha in both phases, of which 30ha is urban land and total area is 449ha. The registered investment capital is up to 834.3 billion VND. Industry that Tien Son Industrial Park calls for investment such as: Electronics, Mechanics, Machine manufacturing, bricks, ceramics.

The project is divided into two phases: 

  • Phase 1: 1999-2049
  • Phase 2: 2006-2056

Categories

Detail

OVERVIEW:

Infrastructure investors

Joint Stock Company Viglacera Corporation - JSC

Place

Tu Son town, Bac Ninh province

Acreage

total area

449

Factory land area

 

Space available

Tree density >15%

The percentage of trees

 

Operating time

1999

Current Investor

126: Canon (Japan), ABB Corporation (Switzerland), THK Corporation (Japan)...; and domestic enterprises such as: Tran Hung Dao Mechanical Factory, Viet Ha Beer Company, Vinamilk Dairy Joint Stock Company...

Main job

electronics, mechanics, machine building

Occupancy

first

LOCATION & DISTANCE:

Road

Distance from Hanoi Capital: 15km From Samsung Bac Ninh: 15km

Air

To Noi Bai International airport: 35km; To Cat Bi - Hai Phong: 120km

Train

 

Seaport

Hai Phong port: 120km

INFRASTRUCTURE:

Geological

Sandy soil, K = 0.9

Internal traffic

Main road

Width: 37m, Number of lanes: 2 lanes

Side branch road

Width: 28m, Number of lanes: 2 lanes

Electricity supply

Voltage

Power line: 110/22KV

Power capacity

2x40MVA

Clean water

Wattage

 

Highest capacity

7,000m3/day

Waste water treatment system

Wattage

6,500m3/day

Internet and telecommunications

ADSL, Fireber & Telephone line

LEASING PRICE:

Land

Land rents

100 USD

Lease term

2056

Type/Grade

Level A

Payment methods

12 months

Deposit

0.05

Minimum area

1 ha

Workshop

3-4 USD

Management fee

Management fee

0.5 USD/m2

Payment methods

3 months/12 months

Electricity price

Peak

0.1 USD

Normal

0.05 USD

Idle

0.03 USD

Payment methods

Monthly

Supplier

EVN

Clean water price nước

Water price

0.4 USD/m3

Payment methods

Monthly

Water supplier

Charged by Gov. suppliers

Wastewater fee

Price

0.3 USD/m3

Payment methods

Monthly

Water quality before treatment

Level FUCK

Water quality after treatment

Level A

Contact:

National One Stop Services and Investments Organization

Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.

  1. Ms Hien Do – 0908 069 399 – hien.dt@nso.com.vn
  2. Mr Cuong Phan – 0913 855 528 – cuong.pd@nso.com.vn
  3. Ms. Truc Tran – 0396 296 580 – truc.tn@nso.com.vn

 

Tags