3. Investment advantage
3.1. Traffic advantage : is planned to be closed and continuous, connecting with the outside traffic system by directly connecting with provincial road 704 and with National Highway 1, all internal roads are arranged to access the road. each plot of land, each functional area. There is a road width from 21.5 m to 33 m, the road surface is 7.5 m wide and the sidewalk is 3 m wide.
3.2. Human Resources
- Labor force: The province's population is 590,467 people, of which the population of working age is 343.7 thousand people, accounting for 58.2% of the province's population; the rate of trained workers is about 58.2%. With the above abundant labor source, it will meet the labor demand for investment projects in the industrial park.
- Vocational training and training: In the province, there are pedagogical colleges, vocational colleges, political schools, irrigation universities and vocational and vocational schools; Every year thousands of students graduate.
3.3. The infrastructure
- Power supply system: Including electrodynamics and domestic electricity, lighting. The power supply is from the 110/22 KV Thap Cham substation stably serving the demand for electricity, ensuring a safe distance from other works and in line with the general planning of the whole area.
- Water supply system: The water supply for the entire industrial park is taken from Phan Rang water plant, the main pipeline runs along National Highway 1 with a total calculated flow rate of Qtb = 48.8 l/s. The water supply station in the industrial cluster has a capacity of 2000m 3 /day-night, including a 1000 m 3 tank , the main structure of the tank is reinforced concrete. Level 2 pumping station has a capacity of 228 m 3 /h. In addition, on the roads, there are also fire hydrants with a distance of 120 - 150m.
- Rainwater drainage system: Extraneous rainwater is collected into the open channel system made of masonry, rain water in the project area is collected to the drainage ditch with reinforced concrete cover, direction to the west. Bau ditch.
- Wastewater drainage system: The round-mouth reinforced concrete pipe is located at the factory, diameter D = 300 - 400 mm.
- Wastewater treatment station : The treatment station has a capacity of 1,400 m 3 /day-night. Production and daily-life wastewater is treated locally, discharged to the wastewater drainage system and brought to the treatment station. The quality of wastewater after treatment and before discharge must meet the standards of type A.
|