Thang Long 3 Industrial Park

Jul 14, 2021

Thang Long Industrial Park III - Vinh Phuc

  • Investor: Sumitomo Corporation (Japan)
  • Operation period : 2018 - 2068
  • Address: Thien Ke Commune, Binh Xuyen District, Vinh Phuc Province
  • Total area: 213ha

LOCATION & DISTANCE:

Road

How to City Hanoi 45 km

Air

20 km from Noi Bai airport

Train

Yes

Seaport

160 km from Cai Lan Port

INFRASTRUCTURE:

Geological

Hard soil: 1.5-2.5kg/cm2

Internal traffic

Main road

Width: 31m, Number of lanes: 4 lanes

Side branch road

Width: 17m, Number of lanes: 2 lanes

Electricity supply

Voltage

110/35/22 KV

Power capacity

126 MVA

Clean water

Wattage

 

Highest capacity

20,000m3/day

Waste water treatment system

Wattage

10,000m3/day

Internet and telecommunications

ADSL, Fireber & Telephone line

LEASING PRICE:

Land

Land rents

100 USD

Lease term

2068

Type/Grade

Level A

Payment methods

12 months

Deposit

$10,000

Minimum area

1 ha

Workshop

4 USD

Management fee

Management fee

0.45 USD/m2

Payment methods

3 months/12 months

Electricity price

Peak

0.1 USD

Normal

0.05 USD

Idle

0.03 USD

Payment methods

Monthly

Supplier

EVN

Clean water price nước

Water price

0.4 USD/m3

Payment methods

Monthly

Water supplier

Charged by Gov. suppliers

Wastewater fee

Price

$0.28/m3

Payment methods

Monthly

Water quality before treatment

Level FUCK

Water quality after treatment

Level A

Fields

Manufacture of engines; supporting industries; manufacturing auto parts, motorcycles; manufactures electronic accessories.

Contact:

 

National One Stop Services and Investments Organization

Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.

  1. Ms Hien Do – 0908 069 399 – hien.dt@nso.com.vn
  2. Mr Cuong Phan – 0913 855 528 – cuong.pd@nso.com.vn
  3. Ms. Truc Tran – 0396 296 580 – truc.tn@nso.com.vn

 

Tags