Texhong Hai Ha Industrial Park

Oct 29, 2021

TEXHONG HAI HA IP

Investor: Texhong Vietnam Industrial Park Co., Ltd

Location: Hai Ha district, Quang Ninh Province.

Area:  660 hectares

1

General information

- Location: Located within the administrative boundaries of 05 communes: Quang Dien, Quang Phong, Phu Hai, Quang Trung and Cai Chien in Hai Ha district.

- Area: 660 hectares

- Characteristics: It is a multi-industry developed industrial park, including heavy and light industries such as thermoelectricity, mechanical engineering, textile and garment auxiliary...; As a port area, warehouse and general seaport services; As an industrial area and seaport developed with flexibility, synchronous investment, convenient and safe for investors, in harmony with neighboring urban areas.

Leasing term: 2014-2064

Rental fee: 50-65USD/m2

2

Location and regional relations:

- Distance from Hanoi center: About 250 km; About 120 km from Ha Long city center, Quang Ninh province; About 30 km from Mong Cai international border gate and Bac Phong Sinh border gate

- Road: Close to National Highway 18, connecting trade between Hanoi - Quang Ninh (Vietnam) - Guangxi (China): Close to Van Don - Mong Cai highway (expected to be completed) in 2020)

- Seaport: About 70km from Fangcheng port (Guangxi - China); to build Hai Ha general port with a capacity of 30 - 45 million tons/year, for ships with a tonnage of 80,000 DWT to dock.

- Airport: About 270 km from Noi Bai airport (Hanoi); About 45 km from Van Don International Airport (Quang Ninh).

- Railway: About 132 km from Ha Long station (Ha Long city).

 

3

- Internal traffic:

The main axis routes in the industrial park have a scale of 42m; The largest inter-regional roads are 32m

Fee: 0.31USD/m2/year

4

- Power source:

The first phase will use power from the province's existing 220KV and 110KV power grids; the next stage is to build Hai Ha Thermal Power Plant with a capacity of 2,100 MW to directly supply electricity to the industrial park and provide steam for textile production. Building 05 intermediate 110KV substations to directly supply factories in the industrial zone.

 

5

- Water source:

In the first stage, water from Ha Coi river and Tai Chi river will be used by dam method; long-term use of water from Ho Trang Vinh and Ho Tai Chi; to build raw water supply pipelines or channels from the above sources to the IZ. Build 02 water plants to supply water for the entire industrial park, with a total capacity of about 200,000 m3/day.

 

 

6

- Drainage system, wastewater and waste treatment system:

 

Separate rainwater drainage system with wastewater drainage system, operating with self-flowing mode; Planning for 02 reservoirs to regulate rainwater, Khe La stream in the current state to be adjusted to create drainage corridors. Arrange 06 wastewater treatment stations for concentrated industrial zones with a total long-term capacity of 90,000 m3/day; 

Fee: 0.5USD/m3

 

7

Arrange 04 points for gathering, transshipment and exchange of solid waste, with the size of each gathering point about 5,000 m2.

 

8

- Communication:

Installing 01 satellite station with a capacity of 30,000 numbers

9

National One Stop Services and Investments Organization

Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.

Contact:

  1. Ms Hien Do – 0908 069 399 – hien.dt@nso.com.vn
  2. Mr Cuong Phan – 0913 855 528 – cuong.pd@nso.com.vn