TAN ĐONG HIEP B INDUSTRIAL PARK
|
2
|
Location
|
Tân Đông Hiệp commune, Tân Bình and Đông Hòa, Dĩ An city, Bình Dương province
|
3
|
Legal
|
Establishment Decision: No. 327/TTg, dated May 2nd, 2002 of the Prime Minister for Binh Duong Import Export Import Export Company to transfer area B with an area of 164.12 ha to Tu Hai Co., Ltd. construction investment and infrastructure business
Decision approving detailed planning of industrial zones: No. 1298/QD-KTQH dated July 4, 2005 of the Ministry of Construction on adjustment of detailed planning of Tan Dong Hiep B Industrial Park, Binh Duong province. According to this decision, the master plan is adjusted to reduce 1.2 hectares of technical infrastructure land.
|
4
|
Quy mô, diện tích đất
|
4.1
|
Planning area
|
164,12ha
|
4.2
|
Actual land area
|
|
+ Occupied
|
100%
|
|
+ Available
|
|
4.3
|
Number of businesses, projects are operating
|
|
+ Domestic business
|
|
|
+ FDI business
|
|
|
+ Main operating industries
|
|
5
|
Advantage of location
|
5.1
|
Transpotation connection
|
Transpotation connection Distance to the nearest big city:: 18 km from Ho Chi Minh City
Distance to Provincial Center: To City. Thu Dau Mot 10 km
Distance to nearest airport: 19km from Tan Son Nhat airport
Distance to nearest railway station: 2.5 km from Song Than station ga
Distance to the nearest river port: 30km from Ben Nghe Port
Distance to the nearest seaport: To the city. Thu Dau Mot 10 km
|
5.2
|
Cơ sở hạ tầng
|
|
5.3
|
Khác
|
Điều kiện khí hậu: Khí hậu ở Bình Dương cũng như khí hậu của khu vực miền Đông Nam bộ: nắng nóng và mưa nhiều, độ ẩm khá cao. Khí hậu nhiệt đới gió mùa, chia thành hai mùa rõ rệt: mùa khô và mùa mưa. Mùa mưa thường bắt đầu từ tháng 5 kéo dài đến cuối tháng 10 dương lịch. Vào những tháng đầu mùa mưa, thường xuất hiện những cơn mưa rào lớn, rồi sau đó dứt hẳn. Nhiệt độ trung bình hàng năm ở Bình Dương từ 26oC-27oC. Nhiệt độ cao nhất có lúc lên tới 39,3oC và thấp nhất từ 16oC-17oC (ban đêm).
|
6
|
Land use term
|
2001 - 2051
|
7
|
Technical Insfrastructure
|
7.1
|
Electricial System
|
According to the supplier. 110/22kv
|
7.2
|
Water supply and drainage system
|
According to the supplier. Capacity 20,000 m3/day
|
7.3
|
Wastewater and waste treatment systems
|
Decision approving the EIA report: No. 114/QD-BTNMT dated January 28, 2003 of the Ministry of Natural Resources and Environment
Centralized wastewater treatment plant: 5,000 m3/day.
|
7.4
|
Telecommunications system, internet
|
According to the supplier
|
7.5
|
Fire protection and fighting system
|
Completed
|
7.6
|
Status of investment, completion of infrastructure
|
Complete technical infrastructure
Main shaft system: 31m wide - Internal traffic system: Asphalt concrete with load H30
|
8
|
Human Resources
|
8.1
|
Local labor
|
|
8.2
|
Labor in the vicinity
|
|
8.3
|
Training for main occupations
|
|
9
|
Social Infrastructure
|
|
10
|
Additional Services
|
|
11
|
Attracted investment fields
|
11.1
|
Priority Areas
|
Electrical industry, machinery and auxiliary equipment manufacturing
industrial and household electrical spare parts;
- Electronics, informatics, telecommunications industry;
- Light industry: children's toys, imitation jewelry, sewing, footwear, ceramic products, glass, crystal;
- Storage
- Processing consumer goods and exporting (food, instant noodles);
- Mechanical processing industries such as manufacturing and assembling watches, optical devices and instruments;
- Mechanical engineering industry, manufacturing and repairing machinery, construction mechanics;
- Industry producing fine art wood for export, office equipment, hotels, interior decoration;
- Plastic products, metal, household tools.
|
11.2
|
Other fields
|
|
12
|
Land for lease, factory and infrastructure use fee
|
12.1
|
Rental of land for lease
|
180-200USD/sqm
|
12.2
|
Rental of factory for lease
|
4.5-5.5USD/sqm/month
|
12.3
|
Infrastructure usage fee
|
|
12.4
|
Payment methods
|
|
13
|
Construction Costs
|
13.1
|
Office
|
|
13.2
|
Standard factory
|
|
13.3
|
Other items
|
|
14
|
Investment Expeneses
|
14.1
|
Electricity price
|
|
14.2
|
Water price
|
|
14.3
|
Gas and coal price
|
|
14.4
|
Apartment and department rental price for foreigners
|
|
14.5
|
Labor cost:
|
|
+ Labor management and engineering
|
|
|
+ Workers and unskilled workers
|
|
|
+ Insurance
|
|
14.6
|
Transportation costs
|
|
14.7
|
Cost of waste (water) treatment
|
|
14.8
|
Environmental protection fee
|
|
14.9
|
Customs fees
|
|
14.10
|
Other costs and fees
|
|
15
|
Contacting point
|
- Ms Hien Do – 0908 069 399 –hien.dt@nso.com.vn
- Mr Cuong Phan – 0913 855 528 –cuong.pd@nso.com.vn
|