1
|
Name of economic zones, industrial zones, hi-tech parks
|
Tam Anh – Korea Industrial Park
|
2
|
Location
|
Tam Anh Bac Commune, Nui Thanh District, Quang Nam Province
|
3
|
Map
|
Quang Nam is located in the key economic development region of the Central region, to the north by Da Nang city, to the east by the East Sea with over 125 km of coastline, to the west by Kon Tum province and the Lao People's Democratic Republic. , the South borders Quang Ngai province. Especially, Chu Lai Open Economic Zone is located in the middle of Vietnam and is the center of ASEAN, about 1-hour flight from Hanoi and Ho Chi Minh City and is the center of the most dynamic economic regions in the region. East Asia such as: Singapore, Hong Kong, Shanghai, Shenzhen, Korea, Japan.
|
4
|
Scale, land area
|
4.1
|
Planned land area
|
Planning area:
+ Phase 1: 90ha
+ Phase 2: 103ha
|
4.2
|
Actual land area
|
|
+ Leased area
|
Actual area for immediate rent: 70ha
+ Rented: 10ha
|
|
+ Available area
|
+ Available: 60ha
|
4.3
|
Number of enterprises, projects on operating
|
|
+ Domestic enterprises
|
|
|
+ FDI enterprises
|
|
|
+ Career, major active field
|
|
5
|
Geological advantages
|
5.1
|
Traffic connection
|
+ Located on National Highway 1A
+ Adjacent to Da Nang - Quang Ngai Expressway
+ 11km from Tam Hiep - Chu Lai port
+ 21km from Chu Lai airport
+ 92km from Tien Sa - Da Nang port
+ 81km from Da Nang airport
|
5.2
|
Infrastructure
|
|
5.3
|
Other
|
• Industrial Park with 100% FDI capital - Korea
• Land rent is cheap compared to Northern and Southern areas
• Firm ground, not flooded.
• Tax incentives from Chu Lai OEZ
|
6
|
Operation term
|
To 2063
|
7
|
Technical infrastructure
|
7.1
|
Power supply system
|
Power supply system:22kV
|
7.2
|
Water supply and drainage system
|
Water supply system: 15,000m³/day and night
|
7.3
|
Wastewater, waste treatment system
|
Waste water and waste treatment system: 12,000m³
|
7.4
|
Telecommunication, internet
|
Telecommunications system, internet: High speed transmission line
|
7.5
|
Fire prevention and fighting
|
|
7.6
|
Investment situation, finishing infrastructure
|
+ Road: Located on National Highway 1A, adjacent to Da Nang - Quang Ngai Expressway
+ Railway:
+ Waterway (sea, river):
+ By air: 81km from Da Nang airport, 21km from Chu Lai airport.
There is enough electricity, water, internet, internal roads... ready to build the factory.
|
8
|
Human resources
|
8.1
|
Laborers in locality
|
|
8.2
|
Laborers from neighboring areas
|
|
8.3
|
Major training fields
|
|
9
|
Social infrastructure
|
9.1. Schools and training institutions:
9.2. Security:
9.3. Hospital:
9.4. Worker housing:
9.4. Other social infrastructure:
|
10
|
Support service
|
10.1. Logistics and transportation consulting: Yes
10.2. Finance - banking - insurance consulting: Yes
10.3. Consulting - auditing: Yes
10.4. Customs Consultant: Yes
10.5. Travel - travel - stay (hotel, restaurant): Yes
|
11
|
Investment attracting sectors
|
11.1
|
Preferential sectors:
|
Textile-Dyeing-Garment Industry
Fashion garment industry
Supporting industry, textile auxiliary
Production of building materials
Processing agro-forestry products
Electronic industry and household electrical products
Chemical and cosmetic production
Stationery production project
Packaging industry (paper, metal, plastic), high-grade packaging
Other professions
|
11.2
|
Other sectors:
|
|
12
|
Land rental, workshop and infrastructure use expenses
|
12.1
|
Land rental price
|
35 USD/m²
|
12.2
|
Workshop rental price
|
There is no factory rental service yet
|
12.3
|
Infrastructure use expense
|
0.04 USD/month/m²
|
12.4
|
Payment method
|
Payment methods:
• After signing the land lease minutes: 10%
• After receiving the Investment Certificate: 40%
• After signing the land lease contract: 40%
Land handover : 10%
|
13
|
Construction price
|
13.1
|
Office
|
|
13.2
|
Standard workshop
|
|
13.3
|
Other
|
|
14
|
Investment costs
|
14.1
|
Power price
|
+ For production: VND 1,611/kwh
+ For business - service: 2,629 VND/kwh
+ For daily activities: 1,678 VND/kwh
|
14.2
|
Water price
|
Water price:
+ For production: 11,000 VND/m3
+ For business - service: 11,000 VND/m3
+ For daily activities: 11,000 VND/m3
|
14.3
|
Gas and coal price
|
|
14.4
|
House, apartment rental price for foreigners
|
|
14.5
|
Labor cost
|
|
+ Management and Technical workers
|
+ Technical labor: 6,000,000 – 10,000,000 VND
+ Labor for management: 10,000,000 – 20,000,000 VND
|
|
+ Worker and unskilled worker
|
+ Minimum salary: 3,670,100 VND
+ Unskilled labor: 4,000,000 - 6,000,000 VND
|
|
+ Insurance
|
Social insurance : 32%
|
14.6
|
Transportation cost
|
|
14.7
|
(Wastewater) waste treatment expenses
|
0.55USD/m³/month
|
14.8
|
Environmental protection fees
|
|
14.9
|
Customs expense
|
|
14.10
|
Other expenses and fees
|
|
15
|
Contact
|
National One Stop Services and Investments Organization
Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.
Contact:
- Ms Hien Do – 0908 069 399 – hien.dt@nso.com.vn
- Mr Cuong Phan – 0913 855 528 – cuong.pd@nso.com.vn
|