LOCATION & DISTANCE:
|
Road
|
45km from the center of Hanoi capital
|
Air
|
15 km from Noi Bai International Airport
|
Train
|
2 km from railway station
|
Seaport
|
160 km from Cai Lan deep-water port (Quang Ninh)
|
INFRASTRUCTURE:
|
Geological
|
Hard soil: 1.5-2.5kg/cm2
|
Internal traffic
|
Main road
|
Width: 31m, Number of lanes: 4 lanes
|
Side branch road
|
Width: 15m, Number of lanes: 2 lanes
|
Electricity supply
|
Voltage
|
110/35/22 KV
|
Power capacity
|
126 MVA
|
Clean water
|
Wattage
|
|
Highest capacity
|
20000m3/day and night
|
Waste water treatment system
|
Wattage
|
10000m3/day and night
|
Internet and telecommunications
|
ADSL, Fireber & Telephone line
|
LEASING PRICE:
|
Land
|
Land rents
|
100-110 USD
|
Lease term
|
2059
|
Type/Grade
|
Level A
|
Payment methods
|
12 months
|
Deposit
|
0.05
|
Minimum area
|
1 ha
|
Workshop
|
4 USD
|
Management fee
|
Management fee
|
0.35 USD/m2
|
Payment methods
|
3 months/12 months
|
Electricity price
|
Peak
|
0.1 USD
|
Normal
|
0.05 USD
|
Idle
|
0.03 USD
|
Payment methods
|
Monthly
|
Supplier
|
EVN
|
Clean water price nước
|
Water price
|
0.4 USD/m3
|
Payment methods
|
Monthly
|
Water supplier
|
Charged by Gov. suppliers
|
Wastewater fee
|
Price
|
$0.28/m3
|
Payment methods
|
Monthly
|
Water quality before treatment
|
Level B
|
Water quality after treatment
|
Level A
|
Fields
|
Manufacture of machinery and equipment, services for transporting, repairing and building new containers, mechanical engineering, electrical equipment, production of metal or non-metallic molds, production of large lifting equipment, manufacturing metalworking machine tools
|
Contact:
|
National One Stop Services and Investments Organization
Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.
- Ms Hien Do – 0908 069 399 – hien.dt@nso.com.vn
- Mr Cuong Phan – 0913 855 528 – cuong.pd@nso.com.vn
- Ms. Truc Tran – 0396 296 580 – truc.tn@nso.com.vn
|