1
|
Economic zone, Industrial Park, High Tech Park
|
RẠCH BẮP INDUSTRIAL PARK
|
2
|
Location
|
An Điền commune, Bến Cát district, Bình Dương province
|
3
|
Map
|
Location Rach Bap Industrial Park is located in the center of Ben Cat town, Binh Duong, located in an area with abundant raw materials in the Southeast region and only a short distance from Ho Chi Minh City. Ho Chi Minh City, Tan Son Nhat International Airport, Saigon port 55 km. In addition, the industrial park is located near the Saigon river branch, connecting with river ports: Vinaconex port - Ba Lua port - Saigon port, very convenient for goods transportation and trade.
|
4
|
Scale, land area
|
4.1
|
Planning area
|
278,60ha expanded up to 638,6ha
STRUCTURE OF LAND USE
No.
|
Land intended for
|
Area (ha)
|
1
|
Sublease land
|
189,53
|
2
|
Ancillary works (including management offices, commercial centre, product display, transformer station, fire prevention and fighting facilities, bank, post-office
|
5,02
|
3
|
Wastewater treatment plant
|
3,23
|
4
|
Water supply plant
|
1,41
|
5
|
Temporary rubbish dump
|
1,62
|
6
|
Internal roads
|
39,40
|
7
|
Greenery
|
38,39
|
8
|
Total
|
278,60
|
|
4.2
|
Actual land area
|
|
+ Occupied
|
100%
|
|
+ Available
|
|
4.3
|
Number of businesses, projects are operating
|
|
+ Domestic business
|
|
|
+ FDI business
|
|
|
+ Main operating industries
|
|
5
|
Advantage of location
|
5.1
|
Transpotation connection
|
- Distance to nearest big city:: distance to city. Ho Chi Minh City 55km
- Distance to Provincial Center: distance to City. Thu Dau Mot 20km
- Distance to nearest airport: 48.8km from Tan Son Nhat airport
- Distance to the nearest railway station: 55km from Saigon station
- Distance to nearest river port: 3km from Vinaconex port
- Distance to nearest seaport: distance from city. Ho Chi Minh City 55km
|
5.2
|
Infrastructure
|
Technical infrastructure: fully meet the needs of investors: internal traffic, electricity, water supply, wastewater treatment, telecommunications
|
5.3
|
Others
|
|
6
|
Land use term
|
2055
|
7
|
Technical Insfrastructure
|
7.1
|
Electricial System
|
Electricity
Medium voltage line 22KV , Capacity:70MVA
|
7.2
|
Water supply and drainage system
|
Water
Water volume (m3/day): 7,000 m3
|
7.3
|
Wastewater and waste treatment systems
|
Centralized wastewater treatment plant: Total capacity 6,000 m3/dayngày
|
7.4
|
Telecommunications system, internet
|
Communications
Internet: ADSL underground cable system, fiber optic cable provided by Binh Duong Post Office
|
7.5
|
Fire protection and fighting system
|
Fire Prevention and Fighting Team in the Industrial Park
|
7.6
|
Status of investment, completion of infrastructure
|
|
8
|
Human Resources
|
8.1
|
Local labor
|
|
8.2
|
Labor in the vicinity
|
|
8.3
|
Training for main occupations
|
|
9
|
Social Infrastructure
|
|
10
|
Additional Services
|
|
11
|
Attracted investment fields
|
11.1
|
Priority Areas
|
- Agro-forestry product processing industry, especially products from rubber latex;
- Garment industries;
- Industries producing export fine art wood, office furniture, especially from rubber wood;
- Light industries such as children's toys, textiles (without dyeing), leather and footwear (without tanning),
- Warehousing and transportation services;
- Electrical and electronic industries, manufacturing machinery, equipment and spare parts for industrial and household electrical appliances;
- Mechanical engineering industries, machinery repair, construction mechanics;
- Plastic and metal products (without plating), household tools.
|
11.2
|
Other fields
|
|
12
|
Land for lease, factory and infrastructure use fee
|
12.1
|
Rental of land for lease
|
70-85 USD/sqm
|
12.2
|
Rental of factory for lease
|
RBF: 3.5- 4.5USD/sqm/month
|
12.3
|
Infrastructure usage fee
|
|
12.4
|
Payment methods
|
Land rent and annual maintenance: payment in 2 installments a year; Phase 1 is on June 15th and phase 2 is on December 15th every year.
|
13
|
Construction Costs
|
13.1
|
Office
|
|
13.2
|
Standard factory
|
|
13.3
|
Other items
|
|
14
|
Investment Expeneses
|
14.1
|
Electricity price
|
|
14.2
|
Water price
|
Price of water supply: Pay monthly, on the 10th of the following month, in December, payment will be made on December 31st.
|
14.3
|
Gas and coal price
|
|
14.4
|
Apartment and department rental price for foreigners
|
|
14.5
|
Labor cost:
|
|
+ Labor management and engineering
|
|
|
+ Workers and unskilled workers
|
|
|
+ Insurance
|
|
14.6
|
Transportation costs
|
|
14.7
|
Cost of waste (water) treatment
|
Waste water treatment fee: Wastewater volume is calculated as 80% of the amount of clean water used in the same period, paid monthly, on the 10th of the next month, especially in December, will be paid on December 31.
|
14.8
|
Environmental protection fee
|
|
14.9
|
Customs fees
|
|
14.10
|
Other costs and fees
|
|
15
|
Contact point
|
- Ms Hien Do – 0908 069 399 –hien.dt@nso.com.vn
- Mr Cuong Phan – 0913 855 528 –cuong.pd@nso.com.vn
|