Rach Bap - An Dien Industrial Park

Oct 27, 2021

- Location: An Dien Ward, Ben Cat District, Binh Duong Province.

- Total area: 638.6ha

- Duration: until 2055

RẠCH BẮP INDUSTRIAL PARK

1

Economic zone, Industrial Park, High Tech Park

RẠCH BẮP INDUSTRIAL PARK

2

Location

An Điền commune, Bến Cát district, Bình Dương province

3

Map

Location Rach Bap Industrial Park is located in the center of Ben Cat town, Binh Duong, located in an area with abundant raw materials in the Southeast region and only a short distance from Ho Chi Minh City. Ho Chi Minh City, Tan Son Nhat International Airport, Saigon port 55 km. In addition, the industrial park is located near the Saigon river branch, connecting with river ports: Vinaconex port - Ba Lua port - Saigon port, very convenient for goods transportation and trade.

4

Scale, land area

4.1

Planning area

278,60ha expanded up to 638,6ha

STRUCTURE OF LAND USE

 

No.

 

Land intended for

 

Area (ha)


1

Sublease land

189,53


2

 

Ancillary works (including management offices, commercial centre, product display, transformer station, fire prevention and fighting facilities, bank, post-office

5,02


3

Wastewater treatment plant

3,23


4

Water supply plant

1,41


5

Temporary rubbish dump

1,62


6

 

Internal roads

39,40


7

Greenery

38,39


8

Total

278,60

 

 

4.2

Actual land area

 

+ Occupied

100%

 

+ Available

 

4.3

Number of businesses, projects are operating

 

+ Domestic business

 

 

+ FDI business

 

 

+ Main operating industries

 

5

Advantage of location

5.1

Transpotation connection

  • Distance to nearest big city:: distance to city. Ho Chi Minh City 55km
  • Distance to Provincial Center:  distance to City. Thu Dau Mot 20km
  • Distance to nearest airport: 48.8km from Tan Son Nhat airport
  • Distance to the nearest railway station: 55km from Saigon station
  • Distance to nearest river port: 3km from Vinaconex port
  • Distance to nearest seaport:  distance from city. Ho Chi Minh City 55km

5.2

Infrastructure

Technical infrastructure: fully meet the needs of investors: internal traffic, electricity, water supply, wastewater treatment, telecommunications

5.3

Others

 

6

Land use term

2055

7

Technical Insfrastructure

7.1

Electricial System

Electricity

Medium voltage line 22KV , Capacity:70MVA

7.2

Water supply and drainage system

Water

Water volume (m3/day): 7,000 m3

7.3

Wastewater and waste treatment systems

Centralized wastewater treatment plant: Total capacity 6,000 m3/dayngày

7.4

Telecommunications system, internet

Communications

Internet: ADSL underground cable system, fiber optic cable provided by Binh Duong Post Office

7.5

Fire protection and fighting system

Fire Prevention and Fighting Team in the Industrial Park

7.6

Status of investment, completion of infrastructure

 

8

Human Resources

8.1

Local labor

 

8.2

Labor in the vicinity

 

8.3

Training for main occupations

 

9

Social Infrastructure

 

10

Additional Services

 

11

Attracted investment fields

11.1

Priority Areas

  • Agro-forestry product processing industry, especially products from rubber latex;
  • Garment industries;
  • Industries producing export fine art wood, office furniture, especially from rubber wood;
  • Light industries such as children's toys, textiles (without dyeing), leather and footwear  (without tanning),
  • Warehousing and transportation services;
  • Electrical and electronic industries, manufacturing machinery, equipment and spare parts for industrial and household electrical appliances;
  • Mechanical engineering industries, machinery repair, construction mechanics;
  • Plastic and metal products (without plating), household tools.

11.2

Other fields

 

12

Land for lease, factory and infrastructure use fee

12.1

Rental of land for lease

70-85 USD/sqm

12.2

Rental of factory for lease

RBF: 3.5- 4.5USD/sqm/month

12.3

Infrastructure usage fee

 

12.4

Payment methods

Land rent and annual maintenance: payment in 2 installments a year; Phase 1 is on June 15th and phase 2 is on December 15th every year.

13

Construction Costs

13.1

Office

 

13.2

Standard factory

 

13.3

Other items

 

14

Investment Expeneses

14.1

Electricity price

 

14.2

Water price

Price of water supply:  Pay monthly, on the 10th of the following month, in December, payment will be made on December 31st.

14.3

Gas and coal price

 

14.4

Apartment and department rental price for foreigners

 

14.5

Labor cost:

 

+ Labor management and engineering

 

 

+ Workers and unskilled workers

 

 

+ Insurance

 

14.6

Transportation costs

 

14.7

Cost of waste (water) treatment

Waste water treatment fee:  Wastewater volume is calculated as 80% of the amount of clean water used in the same period, paid monthly, on the 10th of the next month, especially in December, will be paid on December 31.

14.8

Environmental protection fee

 

14.9

Customs fees

 

14.10

Other costs and fees

 

15

Contact point

  1. Ms Hien Do – 0908 069 399 –hien.dt@nso.com.vn
  2. Mr Cuong Phan – 0913 855 528 –cuong.pd@nso.com.vn

 

Tags