Quang Vinh Industrial Park

Oct 29, 2021

Quang Vinh IP

State management agency: Management Board of Thua Thien Hue Economic and Industrial zones

Location:Quang Vinh commune, Quang Dien district, Thua Thien Hue province

Area: 150ha

1

Name of economic zones, industrial zones, hi-tech parks

Quang Vinh IP

2

Location

Quang Vinh commune, Quang Dien district, Thua Thien Hue province

3

Map

 

4

Scale, land area

4.1

Planned land area

150ha

4.2

Actual land area

 

+ Leased area

 

 

+ Availble area

 

4.3

Number of enterprises, projects on operating

 

+ Domestic enterprises

0

 

+ FDI enterprises

 

 

+ Career, major active field

 

5

Geological advantages

5.1

Traffic connection

Quang Vinh Industrial Park is located about 5km from National Highway 1A, about 20km from Thuan An seaport, 35km from Phu Bai International Airport, 75km from Chan May port. In Quang Dien district, a lagoon district, there are 3,535 ,73 ha of water surface of Tam Giang lagoon and 439.9 ha of water surface of rivers and lakes, favorable for aquaculture and fishing.

 

There are two sides adjacent to the road: Adjacent to the flood avoidance road connecting with Provincial Road 9 - about 9km from Phong Dien Industrial Park; adjacent to the road of the WB project with Provincial Road 11A. About 20km from Dien Loc specialized seaport, 20km from Van Xa station, 20km from Thuan An seaport, 30km from Phu Bai international airport, 75km from Chan May port.

5.2

Infrastructure

 

5.3

Other

 

6

Operation term

50 years

7

Technical infrastructure

7.1

Power supply system

: Currently there is a 400 kvA/22/0.

7.2

Water supply and drainage system

Production water is taken from Pho Lai River, about 2.5km away from the Industrial Park with a capacity of 10,000 m3/day-night.

7.3

Wastewater, waste treatment system

 

There is no centralized wastewater treatment plant.

7.4

Telecommunication, internet

The information systems of VNPT, EVN Telecom and Viettel Telecom have been widely covered, ready to meet the needs of investors.

 

7.5

Fire prevention and fighting

 

7.6

Investment situation, finishing infrastructure

Internal traffic: Main road of the industrial zone, road width 35m; internal road of industrial park, road width: 15.5m

7.7. Transport connection to the area:

    + Roads and railways: There is a planned road to the IZ connecting from Provincial Road 11B, 1.5 km long; 26m wide. Quang Vinh Industrial Park is about 5 km from National Highway 1A

      + Waterway (sea, river): 75 km from Chan May deep-water port, 20 km from Thuan An port

      + By air: 35 km from Phu Bai international airport

7.8. Status of investment and improvement of infrastructure: There are no investors to build and trade IP infrastructure.

8

Human resources

8.1

Laborers in locality

Local labor:

    + Population of the province: 1.2 million people

    + Number of people in working age: 895,000 people

    + Rate of trained workers: 65%

8.2

Laborers from neighboring areas

Workers in the neighboring areas: From Ha Tinh, Quang Binh, Quang Tri, Da Nang provinces

8.3

Major training fields

Medicine, education, garment, technical workers, electricity, machine, information technology, ...

9

Social infrastructure

9.1. Schools, training institutions: In Thua Thien Hue province, there are 09 universities and 01 institute; 05 colleges; 01 secondary school and many other vocational training institutions.

9.2. Security: Police headquarters are arranged according to commune-level administrative units. It is located near the industrial park.

9.3. Hospital: 3 km from the industrial park, there is Quang Dien Hospital.

9.4. Housing for workers: There is a plan on land to build housing for workers, with an area of ​​13 hectares.

9.5. Other social infrastructure:

10

Support service

10.1. Logistics and transportation: Transportation and logistics services meet the needs of investors.

10.2. Finance - banking - insurance: Branches of major banks are located near the industrial park, including: Vietcombank, Vietinbank, BIDV, Agribank, Sacombank, etc.

10.3. Consulting - auditing:

10.4. Customs: The customs clearance place is 25 km from the industrial park.

10.5. Travel - travel - accommodation (hotels, restaurants):

11

Investment attracting sectors

11.1

Preferential sectors:

+ Projects on infrastructure of industrial zone

+ Projects on industrial production: seafood and agricultural processing products; dyeing-sewing-textile industry; textile industry, agricultural and fishery tools production.

11.2

Other sectors:

garment

12

Land rental, workshop and infrastructure use expenses

12.1

Land rental price

12.1. Land rental price for investment in industrial park infrastructure: about 0.018 USD/m2/year

12.2. Land rental price for production and business: about 0.026 USD/m2/year

12.2

Workshop rental price

 

12.3

Infrastructure use expense

 

12.4

Payment method

 

13

Construction price

13.1

Office

 

13.2

Standard workshop

 

13.3

Other

 

14

Investment costs

14.1

Power price

. Electricity price:

+ For production: VND 914 - 2,908 / kwh

+ For trade- services provision: VND 1,538 - 4,004 / kwh

+ For daily activities: VND 1,678 - 2,927/ kwh

14.2

Water price

Water price:

+ For production: VND 11,081/ m3

+ For trade- services provision: VND 15,610/ m3

+ For daily activities: VND 9,489/ m3

14.3

Gas and coal price

Gas price and coal price:

+ Gas price: VND 300,000 - 450,000 (depending on the time)

+ Coal price: USD 74.1 / ton (depending on the time)

14.4

House, apartment rental price for foreigners

Houses and apartments for rent (for foreigners): VND 4 - 8 million

14.5

Labor cost

 

+ Management and Technical workers

+ Technical workers pay rate: VND 6,000,000 - 8,000,000/ month

+ Manager pay rate: VND 8,000,000 - 20,000,000 / month

 

+ Worker and unskilled worker

+ Minimum wage: VND 3,430,000/ month

+ Unskilled labor: VND 4,000,000 - 6,000,000/ month

 

+ Insurance

+ Overtime pay rate: VND 2,000,000 - 5,000,000 / month

+ Social insurance, health insurance: 21.5% of salary (paid by enterprises)

14.6

Transportation cost

VND 6,257 / m3

14.7

(Wastewater) waste treatment expenses

VND 2,000 - 8,000 / m3 / ton

14.8

Environmental protection fees

 

14.9

Customs expense

 

14.10

Other expenses and fees

 

15

Contact

National One Stop Services and Investments Organization

Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.

Contact:

  1. Ms Hien Do – 0908 069 399 – hien.dt@nso.com.vn
  2. Mr Cuong Phan – 0913 855 528 – cuong.pd@nso.com.vn