Quan Ngang Industrial Park

Sep 18, 2021

Quan Ngang Industrial Park - Quang Tri

  • Investor: 

Phase 1 and 2: Quang Tri Economic Zone Authority

Phase 3: LICOGI 13 JOINT STOCK COMPANY

  • Operating time : 2008
  • Address: Gio Quang commune, Gio Linh district, Quang Tri province
  • Total area: 318ha

- Phase I and Phase II: 201,39 hectares
- Phase III: 116,74 hectares.

INFRASTRUCTURE:

Location: Gio Linh district, Quang Tri province
Established: 2008
Scale: Total planned land for use: 318,13 hectares
- Phase I and Phase II: 201,39 hectares
- Phase III: 116,74 hectares.


Operational situation: there are 14 projects register for investment with the total invested capital of 3,030 trillion dong, the areas of land for industry that have been rented is 95,219 hectares. In which: 8 projects have come into operation; 6 projects have been supplied with land for use and  are in progress of construction;


The occupancy rate: 66.18%
Distances: 15 kilometers far from Cua Viet Port, 45 kilometers from My Thuy Port, 182 kilometers from Da Nang Port.
Infrastructures: have been completely constructed meeting the demand of  investors

Geological

Hard soil: 1.5-2.5kg/cm2

Internal traffic

Main road

Width: 31-44m, Number of lanes: 4-6 lanes

Side branch road

Width: 22.5-29m, Number of lanes: 2 lanes

Electricity supply

Voltage

Power line: 110KV and /22KV

Power capacity

Tri An Thermal Power Plant

Clean water

Wattage

15,000m3/day

Highest capacity

(Nuoc Gio Linh)

Waste water treatment system

Wattage

3,000m3/day

Internet and telecommunications

ADSL, Fireber & Telephone line

LEASING PRICE:

Soil

Land rents

30 USD

Lease term

50 years

Type/Grade

Level A

Payment methods

12 months

Deposit

ten%

Minimum area

1 ha

Workshop

$2

Management fee

Management fee

0.2USD/m2

Payment methods

Monthly

Electricity price

Peak

0.1 USD

Normal

0.05 USD

Idle

0.03 USD

Payment methods

Monthly

Supplier

EVN

Clean water price

Water price

0.4 USD/m3

Payment methods

Monthly

Water supplier

Charged by Gov. suppliers

Wastewater fee

Price

0.3 USD/m3

Payment methods

Monthly

Water quality before treatment

Level B

Water quality after treatment

Level A (QCVN 40:2011/BTNMT)

contact:

For more information, please contact

National One Stop Services and Investments Organization

Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.

Please contact:

  1. Ms Hien Do – 0908 069 399 – hien.dt@nso.com.vn
  2. Mr Cuong Phan – 0913 855 528 – cuong.pd@nso.com.vn
  3. Ms. Truc Tran – 0396 296 580 – truc.tn@nso.com.vn

 

Tags