Protrade Industrial Park

Oct 27, 2021

PROTRADE INTERNATIONAL INDUSTRIAL PARK

 

1

Economic zone, Industrial Park, High Tech Park

PROTRADE INTERNATIONAL INDUSTRIAL PARK

2

Location

An Tây commune, Bến Cát district, Bình Dương province

3

Map

Key transport infrastructure

• Vinaconex River Port - Existing port but not yet put into operation;

• An Tay River Port, which will be deployed and put into operation in 2024;

• Ring Road No. 4 of Ho Chi Minh City, the arterial road connecting the southern provinces of Vietnam, is expected to open the whole route in 2021;

• 20km from Thu Dau Mot city, Binh Duong province;

• An Tay Industrial Park - Service - Urban Project includes residential and commercial areas, logistics and transportation areas in the industrial park.

4

Scale, land area

4.1

Planning area

335,24 ha

4.2

Actual land area

 

+ Occupied

 

 

+ Available

32ha

4.3

Number of businesses, projects are operating

 

+ Domestic business

 

 

+ FDI business

 

 

+ Main operating industries

  • Electrical and electronic;
  • Health care products, pharmaceuticals and food (not processed fresh seafood);
  • Precision mechanics;
  • Industrial and auto parts;
  • Supporting industry;
  • Light and clean industry (do not accept projects of weaving, dyeing, paper processing);
  • New construction materials (do not accept projects for the production of traditional building materials such as brick burning, concrete casting, etc.)

5

Advantage of location

5.1

Transpotation connection

PITP Industrial Park owns a strategic location, adjacent to important traffic routes. Mentioned as:

- 2km to Rach Bap port.

- 5km to gold belt 04, connecting southern provinces.

- 16km to My Phuoc - Tan Van highway, connecting Binh Duong and Ho Chi Minh City.

-  18km to the city. Thu Dau Mot, the administrative center of Binh Duong province.

- 41km to the center of Ho Chi Minh City and Tan Son Nhat airport.

- 57km to Cat Lai port.

5.2

Infrastructure

 

5.3

Others

 

6

Land use term

2057

7

Technical Insfrastructure

7.1

Electricial System

Provided by Binh Duong Power Company with a capacity of 22KV - 53MW and another station is in the process of connecting to the industrial park with a capacity of 110KV.

7.2

Water supply and drainage system

Provided by Binh Duong Environmental Water Supply and Sewerage Company with a current capacity of 2,500m3 /day and night and always ensures adequate supply of clean water for businesses in PITP.

7.3

Wastewater and waste treatment systems

The current wastewater treatment system of Module 1 is operating with a treatment capacity of over 2,500m3 /day. Module 2 is expected to be built in 2019 and the next modules will be built according to the expected investment schedule with a treatment capacity of up to 10,000m3/day in the near future.
 

7.4

Fire protection and fighting system

 

7.5

Status of investment, completion of infrastructure

 

7.6

Fire protection and fighting system

 

8

Human Resources

8.1

Local labor

 

8.2

Labor in the vicinity

 

8.3

Training for main occupations

 

9

Social Infrastructure

 

10

Additional Services

 

11

Attracted investment fields

11.1

Priority areas

  •  Electrical and electronic;
  • Health care products, pharmaceuticals and food (not processed fresh seafood);
  • Precision mechanics;
  • Industrial and auto parts;
  • Supporting industry;
  • Light and clean industry (do not accept projects of weaving, dyeing, paper processing);
  • New construction materials (do not accept projects for the production of traditional building materials such as brick burning, concrete casting, etc.)

11.2

Other fields

 

12

Land for lease, factory and infrastructure use fee

12.1

Rental of land for lease

145-150 USD/sqm

12.2

Rental of factory for lease

RBF:4.5-5.5USD/sqm/month

12.3

Infrastructure usage fee

 

12.4

Payment methods

 

13

Construction Costs

13.1

Office

 

13.2

Standard factory

 

13.3

Other items

 

14

Investment Expeneses

14.1

Electricity price

 

14.2

Water price

Current water price: 12,500 VND (equivalent to 0.54 USD) /m3.

14.3

Gas and coal price

 

14.4

Apartment and department rental price for foreigners

 

14.5

Labor cost:

 

+ Labor management and engineering

 

 

+ Workers and unskilled workers

 

 

+ Insurance

 

14.6

Transportation costs

 

14.7

Cost of waste (water) treatment

Waste water treatment fee: 8,400 VND (equivalent to 0.37 USD) /m3.

14.8

Environmental protection fee

 

14.9

Customs fees

 

14.10

Other costs and fees

 

15

Contact point

  1. Ms Hien Do – 0908 069 399 –hien.dt@nso.com.vn
  2. Mr Cuong Phan – 0913 855 528 –cuong.pd@nso.com.vn