1
|
Economic zone, Industrial Park, High Tech Park
|
PROTRADE INTERNATIONAL INDUSTRIAL PARK
|
2
|
Location
|
An Tây commune, Bến Cát district, Bình Dương province
|
3
|
Map
|
Key transport infrastructure
• Vinaconex River Port - Existing port but not yet put into operation;
• An Tay River Port, which will be deployed and put into operation in 2024;
• Ring Road No. 4 of Ho Chi Minh City, the arterial road connecting the southern provinces of Vietnam, is expected to open the whole route in 2021;
• 20km from Thu Dau Mot city, Binh Duong province;
• An Tay Industrial Park - Service - Urban Project includes residential and commercial areas, logistics and transportation areas in the industrial park.
|
4
|
Scale, land area
|
4.1
|
Planning area
|
335,24 ha
|
4.2
|
Actual land area
|
|
+ Occupied
|
|
|
+ Available
|
32ha
|
4.3
|
Number of businesses, projects are operating
|
|
+ Domestic business
|
|
|
+ FDI business
|
|
|
+ Main operating industries
|
- Electrical and electronic;
- Health care products, pharmaceuticals and food (not processed fresh seafood);
- Precision mechanics;
- Industrial and auto parts;
- Supporting industry;
- Light and clean industry (do not accept projects of weaving, dyeing, paper processing);
- New construction materials (do not accept projects for the production of traditional building materials such as brick burning, concrete casting, etc.)
|
5
|
Advantage of location
|
5.1
|
Transpotation connection
|
PITP Industrial Park owns a strategic location, adjacent to important traffic routes. Mentioned as:
- 2km to Rach Bap port.
- 5km to gold belt 04, connecting southern provinces.
- 16km to My Phuoc - Tan Van highway, connecting Binh Duong and Ho Chi Minh City.
- 18km to the city. Thu Dau Mot, the administrative center of Binh Duong province.
- 41km to the center of Ho Chi Minh City and Tan Son Nhat airport.
- 57km to Cat Lai port.
|
5.2
|
Infrastructure
|
|
5.3
|
Others
|
|
6
|
Land use term
|
2057
|
7
|
Technical Insfrastructure
|
7.1
|
Electricial System
|
Provided by Binh Duong Power Company with a capacity of 22KV - 53MW and another station is in the process of connecting to the industrial park with a capacity of 110KV.
|
7.2
|
Water supply and drainage system
|
Provided by Binh Duong Environmental Water Supply and Sewerage Company with a current capacity of 2,500m3 /day and night and always ensures adequate supply of clean water for businesses in PITP.
|
7.3
|
Wastewater and waste treatment systems
|
The current wastewater treatment system of Module 1 is operating with a treatment capacity of over 2,500m3 /day. Module 2 is expected to be built in 2019 and the next modules will be built according to the expected investment schedule with a treatment capacity of up to 10,000m3/day in the near future.
|
7.4
|
Fire protection and fighting system
|
|
7.5
|
Status of investment, completion of infrastructure
|
|
7.6
|
Fire protection and fighting system
|
|
8
|
Human Resources
|
8.1
|
Local labor
|
|
8.2
|
Labor in the vicinity
|
|
8.3
|
Training for main occupations
|
|
9
|
Social Infrastructure
|
|
10
|
Additional Services
|
|
11
|
Attracted investment fields
|
11.1
|
Priority areas
|
- Electrical and electronic;
- Health care products, pharmaceuticals and food (not processed fresh seafood);
- Precision mechanics;
- Industrial and auto parts;
- Supporting industry;
- Light and clean industry (do not accept projects of weaving, dyeing, paper processing);
- New construction materials (do not accept projects for the production of traditional building materials such as brick burning, concrete casting, etc.)
|
11.2
|
Other fields
|
|
12
|
Land for lease, factory and infrastructure use fee
|
12.1
|
Rental of land for lease
|
145-150 USD/sqm
|
12.2
|
Rental of factory for lease
|
RBF:4.5-5.5USD/sqm/month
|
12.3
|
Infrastructure usage fee
|
|
12.4
|
Payment methods
|
|
13
|
Construction Costs
|
13.1
|
Office
|
|
13.2
|
Standard factory
|
|
13.3
|
Other items
|
|
14
|
Investment Expeneses
|
14.1
|
Electricity price
|
|
14.2
|
Water price
|
Current water price: 12,500 VND (equivalent to 0.54 USD) /m3.
|
14.3
|
Gas and coal price
|
|
14.4
|
Apartment and department rental price for foreigners
|
|
14.5
|
Labor cost:
|
|
+ Labor management and engineering
|
|
|
+ Workers and unskilled workers
|
|
|
+ Insurance
|
|
14.6
|
Transportation costs
|
|
14.7
|
Cost of waste (water) treatment
|
Waste water treatment fee: 8,400 VND (equivalent to 0.37 USD) /m3.
|
14.8
|
Environmental protection fee
|
|
14.9
|
Customs fees
|
|
14.10
|
Other costs and fees
|
|
15
|
Contact point
|
- Ms Hien Do – 0908 069 399 –hien.dt@nso.com.vn
- Mr Cuong Phan – 0913 855 528 –cuong.pd@nso.com.vn
|