Phuoc Dong Industrial Park

Jul 21, 2021

Phuoc Dong Industrial Park

Investor: Saigon Investment Joint Stock Company VGR

Location: Phuoc Dong commune, Go Dau district, Tay Ninh province

Area: 3285 ha

1

Name of economic zones, industrial zones, hi-tech parks

Phuoc Dong Industrial Park

2

Location

DT 782, Phuoc Dong commune, Go Dau district, Tay Ninh province

3

Legal

 

4

Scale, land area

4.1

Planned land area

Planned land area: 2,190.6ha

+ Phuoc Dong A IP: 1,015 ha

+ Phuoc Dong B IP: 1,175 ha

+ Urban-service-commercial center: 1,037 ha
+ Thanh Phuoc Seaport: 48 ha
+ Industrial land: 1,417.96 ha, included:
Technical factory land: 746.95 ha
General factory land: 670.64 ha
  • + Internal roads: 259.35 ha
+ Warehouse land: 106.14 ha
+ Infrastructure land: 32.39 ha
+ Administrative area: 60.31 ha
+ Green land: 324.38 ha

4.2

Actual land area

 

+ Leased area

238.31 ha

 

+ Availble area

 

4.3

Number of enterprises, projects on operating

 

+ Domestic enterprises

11 investment projects, total registered capital is 956.22 million USD. Currently, the investment attraction situation is positive because roads 782 and 784 are being expanded.

 

+ FDI enterprises

 

 

+ Career, major active field

 

5

Geological advantages

5.1

Traffic connection

+ 55 km from HCMC

+ 50 km from Saigon Seaport

+ 45 km from Tan Son Nhat Airport

+ 22 km from Moc Bai International border gate

+ 80 km Xa Mat International border gate

+ 32 km from Tay Ninh city

5.2

Infrastructure

 

5.3

Others

 

6

Operation term

From 2008 to 2058

7

Technical infrastructure

7.1

Power supply system

  • Using electricity from Go Dau station, Trang Bang
  • Powered from 6 sources
  • • 4 power stations in 110/22kV area with total capacity of 500 MVA
  • o Station 1: Capacity 2 x 63 MVA
  • o Station 2: Capacity 2 x 63 MVA + 40 MVA
  • o Station 3: Capacity 2 x 63 MVA
  • o Station 4: Capacity 2 x 40 MVA
  • • 2 110/22kV stations outside the area: Thanh Duc and Trang Bang
  • o Thanh Duc Station: Capacity 40 MVA
  • o Trang Bang Station: Capacity 2 x 40 MVA

7.2

Water supply and drainage system

  • Built a water supply plant with a capacity of 10,000 m3/day and night (phase I).
  • Tap water from Tay Ninh province water plant, capacity 120,000m3/day.
  • High ground area, not flooded.
  • Convenient main drainage to Ba Tuoi stream and Cau Duc stream.

7.3

Wastewater, waste treatment system

Capacity 90,000 m3/day and night

· Ensure to meet QCVN 40: 2011/BTNMT grade A standard before being discharged.

· Modern waste treatment center

7.4

Telecommunication, internet

Wired and wireless telephone networks

7.5

Fire prevention and fighting

 

7.6

Investment situation, finishing infrastructure

  • The main road is 60m wide, 6 lanes.
  • Internal road 18-29m, 2-4 lanes.
  • The sidewalk has green trees to create a landscape.
  • Road: The East has the Saigon River. Adjacent to roads: road 782, road 784, road 789 and connect to National Highway 22 through road 782. The planned area has good infrastructure connectivity with the city highway. Ho Chi Minh City - Moc Bai and Ho Chi Minh road are under construction.

8

Human resources

8.1

Laborers in locality

 

8.2

Laborers from neighboring areas

 

8.3

Major training fields

 

9

Social infrastructure

Housing for workers: Within the planning area of ​​2,190 hectares, the area between the industrial park has an urban-service area of ​​650 hectares and a 72-ha resettlement area

10

Support service

 

11

Investment attracting sectors

11.1

Preferential sectors

 

11.2

Other sectors

 

12

Land rental, workshop and infrastructure use expenses

12.1

Land rental price
32 – 35 USD/m2/year

12.2

Factory rental price
USD 2.8/m2/month, min 5 years, advance 6 months

12.3

Infrastructure usage fee
0.36 USD/m2/year

12.4

Payment methods

Stage 1: 30% of the contract value

+ within 10 working days from signing the Land Lease Agreement, pay 10% of the contract value

+ within 10 working days from the receipt of the Investment Certificate, pay 10% of the contract value

+ within 10 working days from signing the land lease contract, pay 10% of the contract value

Stage 2: 70% of the contract value, depending on the method as follows

+ One-time payment: within 20 working days after the two parties sign the land lease contract

+ Payment in installments: lasts for 7 years, 10% payment per year with 8% interest rate

+ Pay annually until the end of the land lease term, with an interest rate of 8%

13

Construction price

13.1

Office
 

13.2

Standard factory
 

13.3

Other category
 

14

Investment cost

14.1

Electricity price
 

14.2

Water price
 

14.3

Gas prices and coal prices
 

14.4

Rental price of houses and apartments for foreigners
 

14.5

Labor cost

 

+ Labor management and engineering

 

 

+ Workers and unskilled workers
 

 

+ Insurrance
 

14.6

Transport costs
 

14.7

Cost of waste (water) treatment
 

14.8

Environmental protection fee
 

14.9

Customs fees
On-site customs, ICD port in the area
• An international standard urban area serving the needs of accommodation and entertainment of foreign experts, investors and employees.

14.10

Other costs and fees
 

15

Contact

National One Stop Services and Investments Organization

Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.

  1. Ms Hien Do – 0908 069 399 –hien.dt@nso.com.vn
  2. Mr Cuong Phan – 0913 855 528 –cuong.pd@nso.com.vn
  3. Ms. Truc Tran – 0396 296 580 –truc.tn@nso.com.vn

 

Tags