1
|
Name of economic zones, industrial zones, hi-tech parks
|
Phuoc Dong Industrial Park
|
2
|
Location
|
DT 782, Phuoc Dong commune, Go Dau district, Tay Ninh province
|
3
|
Legal
|
|
4
|
Scale, land area
|
4.1
|
Planned land area
|
Planned land area: 2,190.6ha
+ Phuoc Dong A IP: 1,015 ha
+ Phuoc Dong B IP: 1,175 ha
+ Urban-service-commercial center: 1,037 ha
+ Thanh Phuoc Seaport: 48 ha
+ Industrial land: 1,417.96 ha, included:
Technical factory land: 746.95 ha
General factory land: 670.64 ha
- + Internal roads: 259.35 ha
+ Warehouse land: 106.14 ha
+ Infrastructure land: 32.39 ha
+ Administrative area: 60.31 ha
+ Green land: 324.38 ha
|
4.2
|
Actual land area
|
|
+ Leased area
|
238.31 ha
|
|
+ Availble area
|
|
4.3
|
Number of enterprises, projects on operating
|
|
+ Domestic enterprises
|
11 investment projects, total registered capital is 956.22 million USD. Currently, the investment attraction situation is positive because roads 782 and 784 are being expanded.
|
|
+ FDI enterprises
|
|
|
+ Career, major active field
|
|
5
|
Geological advantages
|
5.1
|
Traffic connection
|
+ 55 km from HCMC
+ 50 km from Saigon Seaport
+ 45 km from Tan Son Nhat Airport
+ 22 km from Moc Bai International border gate
+ 80 km Xa Mat International border gate
+ 32 km from Tay Ninh city
|
5.2
|
Infrastructure
|
|
5.3
|
Others
|
|
6
|
Operation term
|
From 2008 to 2058
|
7
|
Technical infrastructure
|
7.1
|
Power supply system
|
- Using electricity from Go Dau station, Trang Bang
- Powered from 6 sources
- • 4 power stations in 110/22kV area with total capacity of 500 MVA
- o Station 1: Capacity 2 x 63 MVA
- o Station 2: Capacity 2 x 63 MVA + 40 MVA
- o Station 3: Capacity 2 x 63 MVA
- o Station 4: Capacity 2 x 40 MVA
- • 2 110/22kV stations outside the area: Thanh Duc and Trang Bang
- o Thanh Duc Station: Capacity 40 MVA
- o Trang Bang Station: Capacity 2 x 40 MVA
|
7.2
|
Water supply and drainage system
|
- Built a water supply plant with a capacity of 10,000 m3/day and night (phase I).
- Tap water from Tay Ninh province water plant, capacity 120,000m3/day.
- High ground area, not flooded.
- Convenient main drainage to Ba Tuoi stream and Cau Duc stream.
|
7.3
|
Wastewater, waste treatment system
|
Capacity 90,000 m3/day and night
· Ensure to meet QCVN 40: 2011/BTNMT grade A standard before being discharged.
· Modern waste treatment center
|
7.4
|
Telecommunication, internet
|
Wired and wireless telephone networks
|
7.5
|
Fire prevention and fighting
|
|
7.6
|
Investment situation, finishing infrastructure
|
- The main road is 60m wide, 6 lanes.
- Internal road 18-29m, 2-4 lanes.
- The sidewalk has green trees to create a landscape.
- Road: The East has the Saigon River. Adjacent to roads: road 782, road 784, road 789 and connect to National Highway 22 through road 782. The planned area has good infrastructure connectivity with the city highway. Ho Chi Minh City - Moc Bai and Ho Chi Minh road are under construction.
|
8
|
Human resources
|
8.1
|
Laborers in locality
|
|
8.2
|
Laborers from neighboring areas
|
|
8.3
|
Major training fields
|
|
9
|
Social infrastructure
|
Housing for workers: Within the planning area of 2,190 hectares, the area between the industrial park has an urban-service area of 650 hectares and a 72-ha resettlement area
|
10
|
Support service
|
|
11
|
Investment attracting sectors
|
11.1
|
Preferential sectors
|
|
11.2
|
Other sectors
|
|
12
|
Land rental, workshop and infrastructure use expenses
|
12.1
|
Land rental price
|
32 – 35 USD/m2/year
|
12.2
|
Factory rental price
|
USD 2.8/m2/month, min 5 years, advance 6 months
|
12.3
|
Infrastructure usage fee
|
0.36 USD/m2/year
|
12.4
|
Payment methods
|
Stage 1: 30% of the contract value
+ within 10 working days from signing the Land Lease Agreement, pay 10% of the contract value
+ within 10 working days from the receipt of the Investment Certificate, pay 10% of the contract value
+ within 10 working days from signing the land lease contract, pay 10% of the contract value
Stage 2: 70% of the contract value, depending on the method as follows
+ One-time payment: within 20 working days after the two parties sign the land lease contract
+ Payment in installments: lasts for 7 years, 10% payment per year with 8% interest rate
+ Pay annually until the end of the land lease term, with an interest rate of 8%
|
13
|
Construction price
|
13.1
|
Office
|
|
13.2
|
Standard factory
|
|
13.3
|
Other category
|
|
14
|
Investment cost
|
14.1
|
Electricity price
|
|
14.2
|
Water price
|
|
14.3
|
Gas prices and coal prices
|
|
14.4
|
Rental price of houses and apartments for foreigners
|
|
14.5
|
Labor cost
|
|
+ Labor management and engineering
|
|
|
+ Workers and unskilled workers
|
|
|
+ Insurrance
|
|
14.6
|
Transport costs
|
|
14.7
|
Cost of waste (water) treatment
|
|
14.8
|
Environmental protection fee
|
|
14.9
|
Customs fees
|
On-site customs, ICD port in the area
• An international standard urban area serving the needs of accommodation and entertainment of foreign experts, investors and employees.
|
14.10
|
Other costs and fees
|
|
15
|
Contact
|
National One Stop Services and Investments Organization
Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.
- Ms Hien Do – 0908 069 399 –hien.dt@nso.com.vn
- Mr Cuong Phan – 0913 855 528 –cuong.pd@nso.com.vn
- Ms. Truc Tran – 0396 296 580 –truc.tn@nso.com.vn
|