Phung Hiep Industrial Park

Jul 12, 2021

PHUNG HIEP INDUSTRIAL PARK

Investor: SIMCO Song Da Company (SDA)

Location: To Hieu, Thang Loi, Nghiem Xuyen, Dung Tien communes of Thuong Tin district. 

Area: 401.06 ha

1

Target:

Completing synchronous and modern infrastructure, on that basis, attracting domestic and foreign secondary investors to invest in production in the Industrial Park, creating many products for the society, increasing income for the budget while creating many jobs for laborers, contributing to the socio-economic development of Hanoi city in general and of Thuong Tin district in particular;

 

2

Location:

Thuong Tin district, Hanoi, the location is next to the old National Highway 1A, National Highway 1A Phap Van - Cau Re, 22 Km from the center of Hanoi.

Scale:

Phase I: 174.88 ha; Phase II: 266.18 ha. Total area 401.06 ha.

 

3

Distance from Hanoi Center: 29 km

Noi Bai International Airport: 58 km

Distance from Hai Phong port: 144 km

 

4

Industrial park orientation: Phung Hiep is oriented to be a multi-industry industrial park using modern high technology in accordance with international standards and being environmentally friendly, expected to attract industries such as:

Mechanical assembly, production of spare parts, electronic components

Consumer production, handicrafts

Textile industry

Food processing and agricultural products and some other industries

 

5

Human resources : In terms of labor force, Hanoi has more than 8 million people, of which the population of working age accounts for 60%. In urban areas, there are more than 3 million people; the rural area is about 1.5 million people. In addition, the percentage of trained workers in Hanoi is estimated at 70%.

 

6

Infrastructure & facilities:

Landscape: More than 12% of the total area of ​​the industrial park is planted with trees along the roads and other areas

Lawns and public green areas are planted to improve the industrial environment

Projects to build factories and other buildings must be approved by management

Land condition: Average leveling height 9m/ Soil quality: hard leveled

Internal traffic system: reasonably designed to ensure smooth traffic throughout the industrial park. The system is designed as follows:

+ The main roads in the industrial park are 36 m wide - 6 lanes

+ Branch roads in the industrial park are 26 m wide - 2 lanes

Power supply system: The power supply to the industrial park is taken from 110/35/22KV substation. High voltage electricity network is provided along the internal traffic in the industrial park.

Water supply system: Clean water is supplied with a capacity of 14,000 m3 per day from the Hanoi clean water plant. Water is supplied to the plant fence by an international standard water supply pipe system.

Waste water and waste treatment system: Waste water is collected to the wastewater plant of the industrial park to meet water standard A (QCVN 40:2011/BTNMT) before being discharged to the general system of the industrial park. The wastewater plant was built with a treatment capacity of 3,000m3/day - night

Waste is contracted by factories in the industrial park to classify, collect and transport garbage out of the industrial park to avoid causing environmental pollution.

Exhaust gases of factories are installed with national standard filtration systems before being discharged into the natural environment

Communication system: the industrial park is installed with an underground communication cable system and is provided to the fence of the factory by an international standard cable system.

Through the connection system between the communication center of the industrial park through the post and telecommunications network, all communication needs are guaranteed and are capable of providing all necessary services such as: Private switchboard, international phone, teleconference, leased line, high speed internet, email, etc.

Fire prevention and fighting system: the industrial park is installed with a warning, prevention and firefighting system in strict compliance with national regulations.

 

7

Industrial park management fee : 1USD/m2/year. This fee is paid annually in the first month of the year

Electricity usage fee : according to EVN

Fee for using clean water : According to current regulations of People's Committee

Waste water & solid waste treatment fee : According to current regulations People's Committee & Industrial Park Management Board ban

Price : 120-150USD/m2

RBF: 4USD/m2/month

 

8

National One Stop Services and Investments Organization

Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.

  1. Ms Hien Do – 0908 069 399 – hien.dt@nso.com.vn
  2. Mr Cuong Phan – 0913 855 528 – cuong.pd@nso.com.vn
  3. Ms. Truc Tran – 0396 296 580 – truc.tn@nso.com.vn

 

 

Tags