Phuc Yen Industrial Park

Jul 14, 2021

Phuc Yen Industrial Park - Vinh Phuc

  • Investor: Phuc Ha Industrial Park Investment, Business and Infrastructure Development Joint Stock Company
  • Address: Phuc Yen Town, Vinh Phuc
  • Total area: 150ha

LOCATION & DISTANCE:

Road

Located close to the snow on the Hanoi - Lao Cai highway, the center of Hanoi capital: 35km

Air

Noi Bai International Airport: 9 km

Train

Railway Station: 3km

Seaport

Cai Lan Port (Quang Ninh): 151km

INFRASTRUCTURE:

Geological

Hard soil: 1.5-2.5kg/cm2

Internal traffic

Main road

Width: 31m, Number of lanes: 4 lanes

Side branch road

Width: 15m, Number of lanes: 2 lanes

Electricity supply

Voltage

110/35/22 KV

Power capacity

80 MVA

Clean water

Wattage

 

Highest capacity

20000m3/day and night

Waste water treatment system

Wattage

10000m3/day and night

Internet and telecommunications

ADSL, Fireber & Telephone line

LEASING PRICE:

Land

Land rents

120-130USD

Lease term

 2003-2053

Type/Grade

Level A

Payment methods

12 months

Deposit

0.05

Minimum area

1 ha

Workshop

4 USD

Management fee

Management fee

0.35 USD/m2

Payment methods

3 months/12 months

Electricity price

Peak

0.1 USD

Normal

0.05 USD

Idle

0.03 USD

Payment methods

Monthly

Supplier

EVN

Clean water price nước

Water price

0.4 USD/m3

Payment methods

Monthly

Water supplier

Charged by Gov. suppliers

Wastewater fee

Price

$0.28/m3

Payment methods

Monthly

Water quality before treatment

Level B

Water quality after treatment

Level A

Priority fields

Electronic industry; exact mechanics; spare parts; automobile and motorcycle manufacturing industry; high-tech industry

Contact

National One Stop Services and Investments Organization

Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.

  1. Ms Hien Do – 0908 069 399 – hien.dt@nso.com.vn
  2. Mr Cuong Phan – 0913 855 528 – cuong.pd@nso.com.vn
  3. Ms. Truc Tran – 0396 296 580 – truc.tn@nso.com.vn

 

 

Tags