Phu Thai Nam Tai Industrial Park

Oct 29, 2021

PHU THAI NAM TAI INDUSTRIAL PARK

Investor: Nam Tai International Co., Ltd

Location: Kim Thanh district, Hai Duong province 

Area:  56.7ha

Founded year

2011

Infrastructure investor

New World Fashion Gruop PLC (United Kingdom)

Economic organizations

Nam Tai International Co., Ltd

local points

- Phu Thai town, Kim Thanh district, Hai Duong province (Western subdivision)

- Kim Luong Commune, Kim Thanh District, Hai Duong Province (Eastern Division)

Acreage

- Natural land area: 56.7ha

- Industrial land for lease: 41.6ha

- Industrial land area for lease: 41.1ha

- Fill rate: 98.8%

Industry attracting investment according to the plan

- Western subdivision: Building factories and warehouses to develop textile technology industry (No washing and dyeing); Industry producing goods for the textile and garment industry; Electronic assembly industry; Warehousing services; Light industry types ensure the requirements of environmental protection.

- Eastern subdivision: Textile and garment industry (not dyeing), Factories producing goods for the textile industry; Electronic assembly technology, furniture, warehousing and services, advanced technology light industries, ensuring environmental protection requirements.

Geographical location

- 75 km from Noi Bai International Airport

- 83 km from Hanoi center

- 22 km from Hai Phong port and Hai Phong airport

- 58 km from Quang Ninh deep-water port

 

INFRASTRUCTURE:

Geological

Hard soil: 1.5-2.5kg/cm2

Internal traffic

Main road

Width: 22m & 35m, Number of lanes: 4 lanes

Side branch road

Width: 15m & 22m, Number of lanes: 4 lanes

Electricity supply

Voltage

Power line: 22KV

Power capacity

40MW

Clean water

Wattage

4,500 m3/day

Highest capacity

15,000m3/day

Waste water treatment system

Wattage

2,000m3/day

Internet and telecommunications

ADSL, Fireber & Telephone line

LEASING PRICE:

Land

Land rents

85 USD

Lease term

2067

Type/Grade

Level A

Payment methods

1 time per year

Deposit

5%

Minimum area

N/A

Workshop

$4

Management fee

Management fee

0.2 USD/m2

Payment methods

3 months

Electricity price

Peak

0.1 USD

Normal

0.05 USD

Idle

0.03 USD

Payment methods

Monthly

Supplier

EVN

Clean water price nước

Water price

0.3 USD/m3

Payment methods

Monthly

Water supplier

Charged by Gov. suppliers

Wastewater fee

Price

$0.28/m3

Payment methods

Monthly

Water quality before treatment

Level B

Water quality after treatment

Level A (QCVN 40:2011/BTNMT)

 

 

National One Stop Services and Investments Organization

Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.

Contact:

  1. Ms Hien Do – 0908 069 399 – hien.dt@nso.com.vn
  2. Mr Cuong Phan – 0913 855 528 – cuong.pd@nso.com.vn