Location: Phuoc Tan and Phu My Ward, Phu My Town, Ba Ria - Vung Tau Province
Total area: 620.6 ha
Duration: until 2055
PHU MY II Industrial Park
1. Information about the developer:
– Developer name: IDICO Corporation JSC
– Address: 151 Nguyen Dinh Chieu, Ward 6, District 3, Ho Chi Minh.
2. Information about the Industrial Park:
–Establishment Decision No: 1729/CP-CN dated November 18, 2004 of the Prime Minister; No. 2089/QD–UBND dated June 29, 2005 of the Provincial People's Committee.
– Decision approving industrial park planning:
+ Decision No. 1130/QD-BXD dated August 10, 2006 of the Ministry of Construction;
+ Decision No. 3720/QD-UBND dated December 28, 2018 of People's Committee of Ba Ria - Vung Tau Province;
USING LAND STRUCTURE
(according to Decision No. 3720/QD-UBND dated December 28, 2018)
No
|
Functional Planning
|
Size
(ha)
|
Percentage
(%)
|
1
|
Industrial Land
|
322,22
|
51,92%
|
2
|
Land for warehousing
|
66,71
|
10,75%
|
3
|
Land service Operation Center
|
15,8
|
2,50%
|
4
|
Green land and water surface
|
153,85
|
24,80%
|
|
Green Land
|
90,88
|
|
|
Water Surface
|
62,97
|
|
5
|
Land for traffic and ports
|
55,57
|
9,00%
|
|
Land for transports
|
37,7
|
–
|
|
Land for ports
|
17,8
|
–
|
6
|
Land for technical
|
6,45
|
1,00%
|
|
Total
|
620,60
|
100%
|
– Address: Phuoc Tan Ward and Phu My Ward, Phu My Town, Ba Ria - Vung Tau City
– Operating time: until June 29, 2055
– Total investment capital: 1,600,537 billion VND.
– Area of industrial land for lease: 388.93 hectares
- Infrastructure:
* Internal transportation system
+ Road 965 in the Southeast, passing through PM2 Industrial Park, length 2,065m, planning cross section is 75m;
+ Western inter-port road of PM2 Industrial Park, cross section 50m;
+ The main road D3 is 1,443.14m long, 63m cross section, 24m road for vehicles, 3m median;
+ The main road N6 is 1,410m long, 31m cross-section, 15m driving;
+ Branch road with 2 lanes, 8m wide.
* Water supply system:
+ Source: Toc Tien Water Plant, capacity 50,000m3/day; supply to the Factory fence;
+ Water price (price does not include VAT): 12,500 VND/m3
* Drainage system: Rainwater drainage system and separate wastewater drainage system along the roads in the Industrial Park.
* Communication system: Fully provided by service companies such as VNPT, FPT, Viettel, ensuring domestic and international communication by telephone, fax, mobile phone, fiber optic Internet …
* Natural gas: There is a natural gas supply system, which is planned and currently provided to investors in need.
– Centralized wastewater treatment plant:
+ The centralized wastewater treatment plant in the industrial park has been completed, receiving industrial wastewater from the factory fence.
+ Phase capacity 1:4,000 m3/day and night.
+ Waste water treatment fee (reference): 0.4 USD/m3
– Land for sublease: 304.94, occupancy rate: 77.24%
Land rental price includes:
*Fee for using the infrastructure: Equivalent to 90USD/m2/full term
- Payment in 2 times:
+ 1st time: 50% within 15 days from the date of signing the land sublease contract;
+ Second time: 50% within the first 15 days of the 13th month from the date of signing the Land Sublease Contract;
*Annual Management Fee: Equivalent to 0.50USD/m2/year.
* LAND RENT TO THE STATE: TEMPORARYLY 1,453 VND/M2/YEAR. THIS UNIT PRICE WILL BE ADJUSTED ANNUAL BY THE REGULATIONS OF THE COMMITTEE.
– POWER SUPPLY:
* Source: From the National grid managed by Tan Thanh Electricity / Electricity of Ba Ria - Vung Tau, supplied to the factory fence.
* Electricity price of 22kV (excluding VAT) (According to State regulations):
+ Normal hours (04:00-9:30; 11:30-17:00; 20:00-22:00): 1,555VND/kWh
+ Peak hours (9:30-113:30; 17:00-20:00): 2,871VND/kWh
+ Off-peak hours (22:00 – 04:00): 1,007VND/kWh
3. Advantages of connecting to the external transport system:
* Road distance:
+ National Highway 51: 1.5Km
+ Expressway Ho Chi Minh City - Long Thanh - Dau Giay : 30 Km
+ Vung Tau city: 40 Km
+ Ho Chi Minh City: 60-70 Km
+ Bien Hoa City: 50-55 Km
*About the arrival port:
+ Thi Vai port (ships of 80,000 tons docked): 01 Km
+ PTSC port (60,000 ton ships docked): 02 Km
+ Phu My port (ships 72,000 tons docked): 02 Km
+ Vung Tau Port: 35 Km
*About the arrival airport:
+ Tan Son Nhat Airport: 70 Km
+ Long Thanh Airport (future): 35 Km
* Distance to railway station:
+ Saigon Station: 70 Km
+ Bien Hoa Station: 55 Km
4. Industries attracting investment:
+ Consumer goods processing industry: Food and seafood; Textile and garment industry; Manufacture of footwear, high-grade leather products (without tanning); Paper industry (no pulp production); Processing agricultural and forestry products; Plastic industry, glass ceramic industry.
+ Cosmetics and petrochemicals: Cosmetics and household appliances industry; Petrochemical (no oil refining industry, only manufacturing industry from products of oil refining industries);
+ Mechanical assembly industry;
+ Mechanical repair industry;
+ Metallurgy, rolling mill, products after rolling steel, metal.
+ Electronics and information technology: Producing industrial and specialized electronic equipment; manufactures components, components, accessories, electronic materials and civil electrical products.
+ Biotechnology
+ Construction materials industry;
+ Manufacture of medical equipment and instruments;
+ Medicines for humans and animals;
- Producing all kinds of fibers, producing plastic beads;
- Producing all kinds of rubber tires;
- Producing stationery tools, supplies and equipment (excluding industries related to printing ink; manufacturing interior decoration products)
- Mechanical engineering group; Manufacture of molds, metal structures, prefabricated factory structures; Mechanical engineering, mechanical products, equipment, tools; Manufacture of automobiles and auto parts (excluding plating)
- Manufacture of cables and electrical equipment; Manufacture and assembly of electronic and telecommunications equipment.
– Producing CO2 Gas, liquefied petroleum gas, industrial gas, medical gas; Production and preparation of lubricants; Depot;
– Mixing and bagging fertilizers (not produced from raw materials, no waste water);
- Power production;
– Logistics;
– Environmental industry and energy saving (no solid waste treatment)…
Contact:
- Ms Hien Do – 0908 069 399 –hien.dt@nso.com.vn
- Mr Cuong Phan – 0913 855 528 –cuong.pd@nso.com.vn