Phu My 2 Industrial Park

Oct 29, 2021

Location: Phuoc Tan and Phu My Ward, Phu My Town, Ba Ria - Vung Tau Province

Total area: 620.6 ha

Duration: until 2055

PHU MY II Industrial Park

 

1. Information about the developer:

– Developer name: IDICO Corporation JSC

– Address: 151 Nguyen Dinh Chieu, Ward 6, District 3, Ho Chi Minh.

2. Information about the Industrial Park:

–Establishment Decision No: 1729/CP-CN dated November 18, 2004 of the Prime Minister; No. 2089/QD–UBND dated June 29, 2005 of the Provincial People's Committee.

– Decision approving industrial park planning:

+ Decision No. 1130/QD-BXD dated August 10, 2006 of the Ministry of Construction;

+ Decision No. 3720/QD-UBND dated December 28, 2018 of People's Committee of Ba Ria - Vung Tau Province;

USING LAND STRUCTURE

(according to Decision No. 3720/QD-UBND dated December 28, 2018)

No

Functional Planning 

Size 
(ha) 

Percentage
(%) 

Industrial Land 

322,22 

51,92% 

Land for warehousing 

66,71 

10,75% 

Land service Operation Center 

15,8 

2,50% 

Green land and water surface

153,85 

24,80% 

  

Green Land 

90,88 

  

  

Water Surface

62,97 

  

Land for traffic and ports

55,57 

9,00% 

  

Land for transports

37,7 

 

  

Land for ports 

17,8 

 

Land for technical

6,45 

1,00% 

  

Total

   620,60   

100% 

– Address: Phuoc Tan Ward and Phu My Ward, Phu My Town, Ba Ria - Vung Tau City

– Operating time: until June 29, 2055

– Total investment capital: 1,600,537 billion VND.

– Area of ​​industrial land for lease: 388.93 hectares

- Infrastructure:

* Internal transportation system

+ Road 965 in the Southeast, passing through PM2 Industrial Park, length 2,065m, planning cross section is 75m;

+ Western inter-port road of PM2 Industrial Park, cross section 50m;

+ The main road D3 is 1,443.14m long, 63m cross section, 24m road for vehicles, 3m median;

+ The main road N6 is 1,410m long, 31m cross-section, 15m driving;

+ Branch road with 2 lanes, 8m wide.

* Water supply system:

+ Source: Toc Tien Water Plant, capacity 50,000m3/day; supply to the Factory fence;

+ Water price (price does not include VAT): 12,500 VND/m3

* Drainage system: Rainwater drainage system and separate wastewater drainage system along the roads in the Industrial Park.

* Communication system: Fully provided by service companies such as VNPT, FPT, Viettel, ensuring domestic and international communication by telephone, fax, mobile phone, fiber optic Internet …

* Natural gas: There is a natural gas supply system, which is planned and currently provided to investors in need.

– Centralized wastewater treatment plant:

+ The centralized wastewater treatment plant in the industrial park has been completed, receiving industrial wastewater from the factory fence.

+ Phase capacity 1:4,000 m3/day and night.

+ Waste water treatment fee (reference): 0.4 USD/m3

– Land for sublease: 304.94, occupancy rate: 77.24%

Land rental price includes:

*Fee for using the infrastructure: Equivalent to 90USD/m2/full term

- Payment in 2 times:

+ 1st time: 50% within 15 days from the date of signing the land sublease contract;

+ Second time: 50% within the first 15 days of the 13th month from the date of signing the Land Sublease Contract;

*Annual Management Fee: Equivalent to 0.50USD/m2/year.

* LAND RENT TO THE STATE: TEMPORARYLY 1,453 VND/M2/YEAR. THIS UNIT PRICE WILL BE ADJUSTED ANNUAL BY THE REGULATIONS OF THE COMMITTEE.

– POWER SUPPLY:

* Source: From the National grid managed by Tan Thanh Electricity / Electricity of Ba Ria - Vung Tau, supplied to the factory fence.

* Electricity price of 22kV (excluding VAT) (According to State regulations):

+ Normal hours (04:00-9:30; 11:30-17:00; 20:00-22:00): 1,555VND/kWh

+ Peak hours (9:30-113:30; 17:00-20:00): 2,871VND/kWh

+ Off-peak hours (22:00 – 04:00): 1,007VND/kWh

3. Advantages of connecting to the external transport system:

* Road distance:

+ National Highway 51: 1.5Km

+ Expressway Ho Chi Minh City - Long Thanh - Dau Giay : 30 Km

+ Vung Tau city: 40 Km

+ Ho Chi Minh City: 60-70 Km

+ Bien Hoa City: 50-55 Km

*About the arrival port:

+ Thi Vai port (ships of 80,000 tons docked): 01 Km

+ PTSC port (60,000 ton ships docked): 02 Km

+ Phu My port (ships 72,000 tons docked): 02 Km

+ Vung Tau Port: 35 Km

*About the arrival airport:

+ Tan Son Nhat Airport: 70 Km

+ Long Thanh Airport (future): 35 Km

* Distance to railway station:

+ Saigon Station: 70 Km

+ Bien Hoa Station: 55 Km

4. Industries attracting investment:

+ Consumer goods processing industry: Food and seafood; Textile and garment industry; Manufacture of footwear, high-grade leather products (without tanning); Paper industry (no pulp production); Processing agricultural and forestry products; Plastic industry, glass ceramic industry.

+ Cosmetics and petrochemicals: Cosmetics and household appliances industry; Petrochemical (no oil refining industry, only manufacturing industry from products of oil refining industries);

+ Mechanical assembly industry;

+ Mechanical repair industry;

+ Metallurgy, rolling mill, products after rolling steel, metal.

+ Electronics and information technology: Producing industrial and specialized electronic equipment; manufactures components, components, accessories, electronic materials and civil electrical products.

+ Biotechnology

+ Construction materials industry;

+ Manufacture of medical equipment and instruments;

+ Medicines for humans and animals;

- Producing all kinds of fibers, producing plastic beads;

- Producing all kinds of rubber tires;

- Producing stationery tools, supplies and equipment (excluding industries related to printing ink; manufacturing interior decoration products)

- Mechanical engineering group; Manufacture of molds, metal structures, prefabricated factory structures; Mechanical engineering, mechanical products, equipment, tools; Manufacture of automobiles and auto parts (excluding plating)

- Manufacture of cables and electrical equipment; Manufacture and assembly of electronic and telecommunications equipment.

– Producing CO2 Gas, liquefied petroleum gas, industrial gas, medical gas; Production and preparation of lubricants; Depot;

– Mixing and bagging fertilizers (not produced from raw materials, no waste water);

- Power production;

– Logistics;

– Environmental industry and energy saving (no solid waste treatment)…

Contact: 

  1. Ms Hien Do – 0908 069 399 –hien.dt@nso.com.vn
  2. Mr Cuong Phan – 0913 855 528 –cuong.pd@nso.com.vn