Phu Bai Industrial Park

Oct 29, 2021

Phu Bai IP

Investor: Industrial Zone Infrastructure Development and Investment Limited Company

Location: Huong Thuy Town, Thua Thien Hue Province

Area: 819ha

 

1

Name of economic zones, industrial zones, hi-tech parks

Phu Bai IP

2

Location

Huong Thuy Town, Thua Thien Hue Province

3

Map

 

4

Scale, land area

4.1

Planned land area

Phase 1&2: 196,75 ha          

Phase 3: 49,17 ha

Phase 4: 515,3 ha

4.2

Actual land area

 

+ Leased area

142,5 ha

 

+ Availble area

279,4ha

4.3

Number of enterprises, projects on operating

 

+ Domestic enterprises

Domestic businesses: 48, total registered capital: VND 6,044 billion

 

+ FDI enterprises

FDI businesses: 14, total registered capital: VND 5,507 billion

 

+ Career, major active field

 

5

Geological advantages

5.1

Traffic connection

+ 15 km from the center of Hue City

+ Next to Phu Bai International Airport

+ Along the National Highway 1A and North-South National Raiway

+ 40 km south of Chan May seaport and 20km north of Thuan An seaport.

5.2

Infrastructure

 

5.3

Other

 

6

Operation term

50 years (1998-2048)

7

Technical infrastructure

7.1

Power supply system

 

7.2

Water supply and drainage system

15,000 m3/day and night

7.3

Wastewater, waste treatment system

6,500 m3/ day and night

7.4

Telecommunication, internet

The telephone system, television, the Internet, etc. has been widely covered and uses underground cables.

 

7.5

Fire prevention and fighting

There is 01 fire protection police station in the industrial park with 3 fire engines and 4 fire hydrants

7.6

Investment situation, finishing infrastructure

Internal traffic: Main road, road width 31m- 54m; internal roads and collection roads, road width: 19.5m

Transport connection to the area:

             + Road and railway: Phu Bai Industrial Park is located along National Highway 1A and North-South railway

+ Waterway (sea, river): 40 km south of Chan May deep-water port

+ By air: Located next to Phu Bai international airport

 

 The technical infrastructure of the industrial park has been completed.

8

Human resources

8.1

Laborers in locality

Local labors: 15.697

            + Post graduate: 111

+ Graduate: 1.811

            + Labor with intermediate and vocational qualifications : 3.870

+ Technical worker: 6.766

+ Unskilled labor: 3.139

+ Rate of trained labors: 80%

8.2

Laborers from neighboring areas

Labors in surrounding areas:

 - Phu Loc District: 66.227

 - Phu Vang District: 77.497

-  Nam Dong District: 13.733

 - Huong Thuy Town: 46.869

8.3

Major training fields

engineering - technology

9

Social infrastructure

 

10

Support service

 

11

Investment attracting sectors

11.1

Preferential sectors:

+ Projects on technical infrastructure of industrial zone (stage 4, phase 2 - area: 427.8 ha).

+ Projects on industrial production: hi-tech engineering, IT, clean industry, supporting industry, automobile and motorcycle assembly, beverage, ...

11.2

Other sectors:

 

12

Land rental, workshop and infrastructure use expenses

12.1

Land rental price

28USD/m2

12.2

Workshop rental price

 

12.3

Infrastructure use expense

0.19 USD/m2/năm

12.4

Payment method

 

13

Construction price

13.1

Office

 

13.2

Standard workshop

 

13.3

Other

 

14

Investment costs

14.1

Power price

+ For production: VND 914 – 2,908 /kWh

+ For trade- services provision: VND 1,538 – 4,004/kWh

+ For daily activities: VND 1,678 – 2,927/kWh

14.2

Water price

+ For production provision: VND 11,081/m3

+ For trade- services provision: VND 15,610/m3

+ For daily activities: VND 9,489/m3

14.3

Gas and coal price

+ Gas Price: VND 300.000 – 450.000 (depending on the time)

+ Coal Price: USD 74,1/ton (depending on the time)

14.4

House, apartment rental price for foreigners

VND 4,000,000 – 8,000,000/month

14.5

Labor cost

 

+ Management and Technical workers

+Technical workers pay rate:  VND 6,000,000-8,000,000/person/month

+ Manager pay rate:  VND 8,000,000-20,000,000/person/month

 

+ Worker and unskilled worker

+ Minimum wage: VND 3,430,000 /person/month

+ Unskilled workers pay rate: VND 4,000,000 – 6,000,000/person/month

 

+ Insurance

+ Overtime pay rate: VND 2,000,000-5,000,000/person/month

+ Social insurance and Health insurance: 21.5% of salary (paid by enterprises)

14.6

Transportation cost

 

14.7

(Wastewater) waste treatment expenses

Wastewater treatment cost: VND 6,257 /m3

14.8

Environmental protection fees

Environment protection fee: VND 2,000 – 8,000/m3/ton

14.9

Customs expense

 

14.10

Other expenses and fees

 

15

Contact

 

  1. Ms Hien Do – 0908 069 399 – hien.dt@nso.com.vn
  2. Mr Cuong Phan – 0913 855 528 – cuong.pd@nso.com.vn