Phan Thiet 2 Industrial Park

Aug 09, 2021

Phan Thiet 2 Industrial Park

Investor: Trung Nguyen Steel Co., Ltd

Location: Phong Nam commune, Phan Thiet city and Ham Liem commune, Ham Thuan Bac district - Binh Thuan province.

Area: 40.7ha

 

1

Construction site: Phong Nam commune, Phan Thiet city and Ham Liem commune, Ham Thuan Bac district - Binh Thuan province, adjacent to Phan Thiet Industrial Park phase 1, 200 km from Ho Chi Minh city, far from the city Nha Trang city is about 250 km, 150 km from Da Lat city.

 

2

2. Scale : 40.7 ha.

- Area of ​​industrial land for lease: 31 ha.

- Land area for rent: 23 ha (75% occupancy rate).

- Area of ​​industrial land with completed infrastructure and ready for lease: 8 ha ( there is a policy to relocate production facilities in residential areas to the industrial zone, so it should temporarily stop attracting secondary projects) .

Operating time: 2006

3

3. Technical infrastructure system: Basic technical infrastructure has been invested in such as roads, electricity supply, water supply, centralized wastewater treatment system...

4. Advantage: The location of the industrial park is located in the city. Phan Thiet should be very convenient in terms of traffic infrastructure, other social infrastructure systems such as housing for workers, markets, schools, hospitals, amusement parks and other services. ..

5. Investment incentives: Investors are entitled to preferential policies and support according to current regulations.

 

4

6. Prioritize projects in the following industries:

Equipment manufacturing and assembly industries in the electronics-informatics industry; manufacturing pharmaceutical products, medical instruments, medical products; c he now producing all kinds of packaging, plastic, composite material products; c evil mechanical industry, assembly movers, machine tools, production units, parts, accessories and components of bicycles, components parts manufacturing specialized vehicles and automobiles; c evil mechanical engineering, fabrication repair tools, machinery and equipment for agriculture and fishery industries; s eat products of furniture and furnishing; c manufacturing and assembling civil equipment; s An export water, purified bottled water; c processing milk and dairy products; x 's right printing establishments, copy the kind; manufacture of fire prevention and fighting equipment and products; d and implement projects of industrial laundry; c garment-knitting- leather-shoes industry; c beverage processing; c food processing; Warehouse.

 

5

7. Land rent and expenses:

          - Land rental price: 30,000 VND/m 2 /month (price exclusive of VAT, increasing every 5 years);

         - Fee for using infrastructure: 0.15 USD/m 2 /year (price excludes VAT);

         - Waste water treatment fee: 8,900 VND/m 3 (price excludes VAT).      
 

 

6

8. Contact information:

National One Stop Services and Investments Organization

Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.

Please contact:

  1. Ms Hien Do – 0908 069 399 – hien.dt@nso.com.vn
  2. Mr Cuong Phan – 0913 855 528 – cuong.pd@nso.com.vn
  3. Ms. Truc Tran – 0396 296 580 – truc.tn@nso.com.vn

 

 

 

Tags