1
|
Name of economic zones, industrial zones, hi-tech parks
|
Nomura Industrial Park
|
2
|
Location
|
An Duong District, Hai Phong City, Vietnam
|
3
|
Introduction
|
Nomura Industrial Park - Hai Phong was established on December 23, 1994. This is an industrial park with the earliest investment capital in the North, with modern and synchronously invested technical infrastructure, geographical location and traffic. favorable communication
|
4
|
Scale, land area
|
4.1
|
Planned land area
|
153ha
|
4.2
|
Actual land area
|
|
+ Leased area
|
100%
|
|
+ Available area
|
0
|
4.3
|
Number of enterprises, projects on operating
|
|
+ Domestic enterprises
|
|
|
+ FDI enterprises
|
|
|
+ Career, major active field
|
|
5
|
Geological advantages
|
5.1
|
Traffic connection
|
City center: 13km
National Highway 5: 0 km
Hai Phong Railway Station: 15km
Cat Bi International Airport: 20km
Hai Phong Port: 15km
|
5.2
|
Infrastructure
|
Transportation system
The internal road system is 20m wide, 30m wide to meet the requirements of moving large tonnage vehicles
System of northern contours and charges
|
5.3
|
Other
|
|
6
|
Operation term
|
1994-2044
|
7
|
Technical infrastructure
|
7.1
|
Power supply system
|
has an independent power plant with a capacity of 50MW with stable voltage quality in the industrial park
from Vat Cach
|
7.2
|
Water supply and drainage system
|
water plant with a capacity of 13,500m3/day
|
7.3
|
Wastewater, waste treatment system
|
Wastewater treatment: The wastewater treatment plant by microbiological method has a capacity of 10,800m3/day.
|
7.4
|
Telecommunication, internet
|
According to industrial park standards
Post office (2,000-digit switchboard) - Direct payment to Hai Phong Post Office -Installation cost (one-time payment): VND 1,000,000 - Monthly subscription: VND 27,000 (Above price does not include tax)
|
7.5
|
Fire prevention and fighting
|
The fire protection system is designed synchronously, in the industrial park, there is a system of air-conditioning lakes and irrigation ditches surrounding it, so it is very convenient for fire protection work
|
7.6
|
Investment situation, finishing infrastructure
|
Completed all items
|
8
|
Human resources
|
8.1
|
Laborers in locality
|
25,000 people
|
8.2
|
Laborers from neighboring areas
|
|
8.3
|
Major training fields
|
|
9
|
Social infrastructure
|
Has a standard factory ready for rent, industrial park customs, bank, private medical station.
|
10
|
Support service
|
Supporting infrastructure systems such as information technology, telecommunications, services, banks, medical stations, etc. have been built specifically to serve the industrial park.
This is also the first industrial park in Hai Phong to apply the "one-stop" administrative model in place, demonstrating the close connection between the Hai Phong Economic Zones Management Board (HEZA) and investors. Accordingly, HEZA will directly manage, appraise and issue investment certificates to enterprises wishing to invest in industrial zones.
|
11
|
Investment attracting sectors
|
11.1
|
Preferential sectors:
|
high technology, electronic industry
|
11.2
|
Other sectors:
|
high technology, machine building, precision mechanics, auto parts, electronic equipment
|
12
|
Land rental, workshop and infrastructure use expenses
|
12.1
|
Land rental price
|
100 USD/m2
|
12.2
|
Workshop rental price
|
5-7USD/m2/month
|
12.3
|
Infrastructure use expense
|
0.4USD/m2/year
|
12.4
|
Payment method
|
According to the regulations in the Industrial Park
|
13
|
Construction price
|
13.1
|
Office
|
|
13.2
|
Standard workshop
|
|
13.3
|
Other
|
|
14
|
Investment costs
|
14.1
|
Power price
|
Power supply: independent power plant with capacity of 50 MW 380 V: 0.12 USD/Kwh (Customers consuming more than 100,000 Kwh/month are charged $0.10/Kwh at night from 10pm to 4am next day) (Prices above do not include tax)
|
14.2
|
Water price
|
Water Supply with a capacity of 13,500 m3/day Price is: $0.28/m3 (The above price does not include tax)
|
14.3
|
Gas and coal price
|
|
14.4
|
House, apartment rental price for foreigners
|
According to the price bracket specified in the IP
|
14.5
|
Labor cost
|
|
+ Management and Technical workers
|
|
|
+ Worker and unskilled worker
|
|
|
+ Insurance
|
|
14.6
|
Transportation cost
|
|
14.7
|
(Wastewater) waste treatment expenses
|
|
14.8
|
Environmental protection fees
|
|
14.9
|
Customs expense
|
|
14.10
|
Other expenses and fees
|
|
15
|
Contact
|
National One Stop Services and Investments Organization
Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.
Contact:
- Ms Hien Do – 0908 069 399 – hien.dt@nso.com.vn
- Mr Cuong Phan – 0913 855 528 – cuong.pd@nso.com.vn
|