Infrastructure investment company:
|
Tin Nghia Corporation Joint Stock Company
|
Location:
|
Hiep Phuoc Commune; Long Tho, Nhon Trach district, Dong Nai.
|
Total size:
|
697.49 hectares
(Phase 1: 337 ha, Phase 2: 360.49 ha)
|
% Rented Land
|
Phase 1: 100%, Phase 2: 85,07%
|
Transportation infrastructure:
|
built internal roads and water supply and drainage systems.
|
Power supply infrastructure:
|
from the national grid and from the Formosa Thermal Power Plant.
|
Water supply infrastructure:
|
from Nhon Trach Underground Water Plant (capacity 10,000 m3/day).
|
Communication infrastructure:
|
Convenient at home and abroad.
|
Wastewater treatment infrastructure:
|
Wastewater treatment plant with a capacity of 5,000 m3/day (in phase 1) and 2000 m3/day (in phase 2).
|
Industry attracting investment:
|
- Shoes; Skin; Weaving; Garment;
- Electricity; Electronic; Mechanical; Building materials;
- Process the wood; Paper, Paper Packaging; Ceramics; Glass; Plastic product;
- Food; Fodder; Medicine; Spice; Cosmetics; Products from natural and synthetic rubber.
|
Contact |
- Ms Hien Do – 0908 069 399 –hien.dt@nso.com.vn
- Mr Cuong Phan – 0913 855 528 –cuong.pd@nso.com.vn
|