1
|
Name of economic zones, industrial zones, hi-tech parks
|
Nhon Hoi B – HONG YEUNG Industrial Park
|
2
|
Location
|
Nhon Hoi, Quy Nhon city, Binh Dinh province
|
3
|
Map
|
|
4
|
Scale, land area
|
4.1
|
Planned land area
|
Planning area: 447 ha
|
4.2
|
Actual land area
|
|
+ Leased area
|
Actual area: 330.23 hectares
Leasing: 32.3 ha
|
|
+ Available area
|
297.93 ha
|
4.3
|
Number of enterprises, projects on operating
|
|
+ Domestic enterprises
|
|
|
+ FDI enterprises
|
|
|
+ Career, major active field
|
|
5
|
Geological advantages
|
5.1
|
Traffic connection
|
Located on the traffic axis of the East-West Corridor in the southernmost part of the provinces in the "central key economic region", it is the gateway to the East Sea of the South Central region, the Central Highlands and countries in the Mekong Delta Mekong;
adjacent to Nhon Hoi seaport, about 7 km from Quy Nhon city center (class I), about 10 km if going around by road to Quy Nhon seaport; 15 km from Dieu Chi Railway Station and no more than 30 km from Phu Cat Airport
|
5.2
|
Infrastructure
|
4.3. Usage allocation:
+ Industrial land: 330.23 ha
+ Green land: 46.4 ha
+ Internal road: 65.74 ha
+ Other: 4.63 ha
4.4. Functional areas: N, L, M include manufacturing and manufacturing electrical equipment, civil electronics, industrial electronics; Manufacturing, manufacturing and assembling auto and motorcycle parts; Mechanical engineering; Export packaging, footwear, garment for export; Processing agricultural, forestry and aquatic products, food; consumer goods, satellite household industrial goods; Mechanical; building materials, chemicals; several other industries.
|
5.3
|
Other
|
In Binh Dinh province, there are 04 industrial parks established and operating, of which 02 industrial parks have been filled; Four other industrial parks have been approved by the Prime Minister for development planning until 2020. All industrial parks will be multi-dimensionally linked, forming satellites of Nhon Hoi Economic Zone with Nhon Hoi Industrial Park as the county. industrial production developer.
- Locations in areas with extremely difficult socio-economic conditions should apply the highest investment policies of the central and local governments.
- Abundant local human resources, Binh Dinh is also a locality that provides many skilled and capable workers for industrial zones in the southern provinces.
|
6
|
Operation term
|
4/2057
|
7
|
Technical infrastructure
|
7.1
|
Power supply system
|
- National grid: 110KV line from 220/110KV Phu Tai station.
- 110/22KV transformer station with capacity of 2x63MVA.
|
7.2
|
Water supply and drainage system
|
Booster pumping station with a capacity of 14,000 m3/day.
Phase 2: 64,000 m3/day and night
|
7.3
|
Wastewater, waste treatment system
|
Waste water and waste treatment system: Planning to build 7 wastewater treatment zones of functional areas. Currently, the construction of a wastewater treatment plant has been completed with a capacity of 17,391 m3/day.
|
7.4
|
Telecommunication, internet
|
Telecommunications system, internet: All kinds of services, ready to serve upon request.
|
7.5
|
Fire prevention and fighting
|
Fire prevention and fighting system: Fire protection system is installed along the roads in the industrial park.
|
7.6
|
Investment situation, finishing infrastructure
|
7.7. Transport connection to the area:
+ By road: about 10km from National Highway 1A
+ Railway: about 15km from Dieu Tri station
+ Waterway (sea, river): about 10km . from Quy Nhon seaport
+ By air: about 30km from Phu Cat airport
7.8. Status of investment and improvement of infrastructure: Currently, the technical infrastructure of industrial zones in the EZ has basically been fully invested, ensuring conditions for secondary investors to operate.
|
8
|
Human resources
|
8.1
|
Laborers in locality
|
Local labor: 12,224 people
On college:
+ Universities and colleges: 1,114 people
+ Intermediate, vocational training: 3,687 people
Technical workers:
+ Unskilled labor: 7,354 people
|
8.2
|
Laborers from neighboring areas
|
|
8.3
|
Major training fields
|
|
9
|
Social infrastructure
|
9.1. Schools, training institutions: 02 universities and 04 colleges of multi-disciplinary training and many vocational secondary schools, vocational training centers....
9.2. Security: guaranteed
9.3. Hospitals: there are 10 hospitals with many specialties in Quy Nhon city.
9.4. Worker housing: not yet implemented
|
10
|
Support service
|
10.1. Logistics and transportation: major shipping agents are present in Quy Nhon, there are over 420 enterprises operating in this field.
10.2. Finance - banking - insurance: there are more than 22 bank branches and insurance companies operating in Quy Nhon and Binh Dinh province
10.3. Consulting - auditing: there are many organizations providing consulting and auditing services.
10.4. Customs: - Quy Nhon Border Gate Customs Branch;
- Nhon Hoi border gate Customs Branch (operates when the port is completed), Customs Branch outside the border gate in Nhon Hoi.
10.5. Tourism - travel - accommodation (hotels, restaurants): there are 04 4-star standard hotels and resorts, 1 3-star hotel and 52 1-star hotels with a total of 2,653 rooms and many motels operating on province area.
|
11
|
Investment attracting sectors
|
11.1
|
Preferential sectors:
|
- Projects in high-tech fields that meet the provisions of Clause 2, Article 5 of the Regulation on high-tech zones promulgated together with the Government's Decree No. 99/2003/ND-CP dated August 28, 2003.
- Large-scale investment projects, which are important for the development of industries, fields or socio-economic development of the province and the region, with a value of 100 million USD or more; Employing 2,000 or more workers; Have a direct export turnover of 100 million USD/year or more
|
11.2
|
Other sectors:
|
|
12
|
Land rental, workshop and infrastructure use expenses
|
12.1
|
Land rental price
|
35USD/m2
|
12.2
|
Workshop rental price
|
Factory rent: Prefabricated house, area 15,000 m2 (5,000 m2/unit).
|
12.3
|
Infrastructure use expense
|
Fee for using infrastructure: unit price 0.3 USD/m2/year
|
12.4
|
Payment method
|
Payment method: there are many payment methods: one-time payment for the whole land lease period; 50% first payment, remaining 50% in the next 5 years.
|
13
|
Construction price
|
13.1
|
Office
|
|
13.2
|
Standard workshop
|
|
13.3
|
Other
|
|
14
|
Investment costs
|
14.1
|
Power price
|
Electricity price: average 1.508,85 VND/kwh, according to the provisions of Circular No. 19/2013/TT-BCT dated 31/7/2013.
|
14.2
|
Water price
|
Water price: average 8,400 VND/m3
|
14.3
|
Gas and coal price
|
|
14.4
|
House, apartment rental price for foreigners
|
|
14.5
|
Labor cost
|
|
+ Management and Technical workers
|
|
|
+ Worker and unskilled worker
|
Labor cost: average salary 2.69 million VND/person/month
|
|
+ Insurance
|
|
14.6
|
Transportation cost
|
|
14.7
|
(Wastewater) waste treatment expenses
|
Cost of waste (water) treatment: 5,000 (VND/m3)
|
14.8
|
Environmental protection fees
|
|
14.9
|
Customs expense
|
|
14.10
|
Other expenses and fees
|
|
15
|
Contact
|
National One Stop Services and Investments Organization
Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.
Contact:
- Ms Hien Do – 0908 069 399 – hien.dt@nso.com.vn
- Mr Cuong Phan – 0913 855 528 – cuong.pd@nso.com.vn
|