Nam Tan Uyen Industrial Park

Oct 27, 2021

Location: Khanh Binh Ward, Tan Uyen District, Binh Duong Province

Total area:  331,97 ha.

Land usage duration: from Oct 24, 2005 to Oct 24, 2054 (50 years)

 

NAM TÂN UYÊN INDUSTRIAL PARK

1

Economic zone, Industrial Park, High Tech Park

NAM TÂN UYÊN  INDUSTRIAL PARK

 

2

Location

Hemlet 4, Khánh Bình commune, Tân Uyên district, Bình Dương province

3

Map

Tan Uyen district is located in the east of Binh Duong province, in the center of the Southern Key Economic Region, within a radius of about 30km from the center of Ho Chi Minh City. This is an area that is currently developing large industrial, urban and service zones, creating a vibrant area, attracting investment and labor from other places.

4

Scale, land area

4.1

Planning area

Nam Tan Uyen Industrial Park with a total area of 331.97 ha.

Inside:

- Land for construction of export and import enterprises:   228.98 ha

- Land for operation and service center       :  12.36 ha

- Land for key works:   3.43 ha

- Land for green trees (isolated trees)         :  33.31 ha

- Land for traffic :  53.89 ha

4.2

Actual land area

 

+ Occupied

184.8 ha; Reaching occupancy rate:   90.47%

 

+ Available

 

4.3

Number of businesses, projects are operating

 

+ Domestic business

 

 

+ FDI business

 

 

+ Main operating industries

 

5

Advantage of location

5.1

Transpotation connection

Located on the traffic road DT 746 and DT 747B with a cross section of 38 meters for 06 lanes to go to big cities.; Cat Lai Port: 30 km; Song Than ICD Port: 16 km; Thanh Phuoc river port: 06 km; About 32 km from Tan Son Nhat airport; About 10km from National Highway 13; About 28 km from Ho Chi Minh City; Binh Duong New City: 06 Km

5.2

Infrastructure

-  Technical infrastructure:  Complete traffic infrastructure, closed traffic network with harmoniously designed roads to create beauty for the industrial park. The road surface is covered with hot asphalt concrete with a width of 14-35m, standard load H30. Complete infrastructure for electricity, water, communication. There are facilities for workers' houses, banks

5.3

Others

The average height of the land: 38m above sea level.

-No earthquakes or impacts of natural disasters such as storms or floods.

- Average annual humidity: 84%

-Average annual temperature: 27.30C

-Average annual rainfall: 1,864 mm

- Soil compaction: 1.6 ~ 2 kg/cm2

6

Land use term

50 years from 24/10/2005 to 24/10/2054

7

Technical Insfrastructure

7.1

Electricial System

Power system with 110/220KV - 2x40 MVA (6 main lines + 2 backup lines)

7.2

Water supply and drainage system

Clean water plant with a capacity of 33,000 cubic meters/day and night.

7.3

Wastewater and waste treatment systems

Centralized wastewater treatment plant:  Total design capacity 8,000 m3/day. Currently, the wastewater treatment plant has put into operation module 1 with a capacity of 2,000 m3 /day and night

7.4

Telecommunications system, internet

Telecommunication Center located in Nam Tan Uyen Industrial Park, 2600 connection ports with high speed ADSL transmission system

7.5

Fire protection and fighting system

 

7.6

Status of investment, completion of infrastructure

Complete, flat ground.

8

Human Resources

8.1

Local labor

 

8.2

Labor in the vicinity

 

8.3

Training for main occupations

 

9

Social Infrastructure

 

10

Additional Services

 

11

Attracted investment fields

11.1

Priority areas

+ Mechanical project group: metallurgy, production of tools, details, equipment

to replace; manufacturing equipment and machinery for agricultural and industrial production; manufacturing automobiles of all kinds and motorcycles of all kinds; processing and assembling specialized machinery and equipment; casting, rolling and drawing metal;

+ Project group processing food, food, beverage: processing vegetables, tubers, fruits, cereals and agricultural products; processing dairy products, cattle and poultry; seafood processing; catering industry; confectionery of all kinds; fast food of all kinds, brewing, soft drinks, soft drinks of all kinds and pure drinking water;

+ Project group for the production of building materials: concrete structures, sewer pipes, permeable wicks for foundation treatment; tunnel kiln bricks of all kinds; granite, granite, pigment;

+ Project group on pharmaceuticals and cosmetics: cosmetic production; manufacture of drugs for humans and livestock (including traditional and modern medicines); production and processing of biological products;

+ Project group on textile (non-dyed) and garment: production of garments, leather (non-tanned), imitation leather, production of textile products (non-dyed);

+ Group of other projects: assembly of electronic products, printing, packaging and related services; production of handicrafts, wood processing and wood products; manufacture of metal structures, tanks, tanks and boilers; production of household and high-grade plastic and aluminum products; manufacture of paper goods and packaging from used pulp or paper; production of technological goods; production of children's toys; supporting services for the operation of the industrial park such as office leasing, banking, post office, telecommunications, warehousing (including cold storage), warehousing services, transportation, delivery, food supply products, transportation, industrial hygiene, collection and transportation of solid waste and hazardous waste to a place for thorough treatment outside the industrial park.

11.2

Others

 

12

Land for lease, factory and infrastructure use fee

12.1

Rental of land for lease

160USD/sqm

12.2

Rental of factory for lease

BRF: 3.5USD/sqm/month

12.3

Infrastructure usage fee

0,6 USD/sqm/year ( Exclusive  VAT).

 

12.4

Payment methods

 

13

Construction Costs

13.1

Office

 

13.2

Standard factory

 

13.3

Other items

 

14

Investment Expeneses

14.1

Electricity price

Power system with 110/220KV - 2x40 MVA (6 main lines + 2 backup lines)

14.2

Water price

Other expenses such as electricity, domestic water, telephone, internet... calculated according to the state price bracket.

14.3

Gas and coal price

 

14.4

Apartment and department rental price for foreigners

 

14.5

Labor cost:

 

+ Labor management and engineering

 

 

+ Workers and unskilled workers

The average salary for each subject in turn is:

- Workers: 4-5 million/month.

Office staff: 6-7 million/month.

- Management: 9 - 10 million/month.

-Engineers and technicians: 8 - 9 million/month.

 

+ Insurance

 

14.6

Transportation costs

 

14.7

Cost of waste (water) treatment

0.25 USD/m3

14.8

Environmental protection fee

 

14.9

Customs fees

 

14.10

Other costs and fees

 

15

Contact

  1. Ms Hien Do – 0908 069 399 –hien.dt@nso.com.vn
  2. Mr Cuong Phan – 0913 855 528 –cuong.pd@nso.com.vn