My Xuan B1 - Tien Hung Industrial Park

Oct 29, 2021

My Xuan Industrial Park B1- Tien Hung

1. Information about the developer

• Investor's name: Tien Hung Trading-Manufacturing Co., Ltd

• Address: 150-152 Ngo Quyen, Ward 5, District 10, HCMC

2. Information about the industrial park

• Establishment Decision: No. 1479/QD.UBND dated May 18, 2006 of the People's Committee of Ba Ria Vung Tau province on the establishment of My Xuan B1-Tien Hung Industrial Park.

• Decision approving industrial park planning:

+ Decision No. 1118/QD-BXD dated August 9, 2006 of the Ministry of Construction; Decision No. 2533/QD-UBND dated September 30, 2019 of the People's Committee of Ba Ria Vung Tau province

USING LAND STRUCTURE

No

Lan Type

  

Size 
(ha) 


(%) 

Land for factories 

138,21 

69,11 

Land for logistics

5,18 

2,59 

Land for construction of operating and service facilities

4,14 

2,07 

Land Green and water surface

24,29 

12,15 

Land for transportation 

25,96 

12,98 

Land for technical infrastructure 

2,22 

1.11 

  

Total

200 

100 

• Address of the industrial zone: My Xuan Industrial Park B1 – Tien Hung, My Xuan Ward, Phu My Town, Ba Ria - Vung Tau Province, Vietnam.

• Operating time of the industrial park:

Working time: morning from 7:30 a.m. to 11:30 p.m. from 1 p.m. to 5 p.m

Working days of the week: from Monday to Friday

• Total investment capital: 390 billion VND

• Infrastructure:

• Power system

To ensure the power supply for the whole Industrial Park, a 110/22KV transformer station has been built in the zone with a capacity of 2x64MVA. This 110KV station receives electricity from the national grid through 110KV lines from Phu My power plant, ensuring 24/24 hour power supply for production activities in the industrial park.

Water supply system

The water source for the Industrial Park is Phu My water factory, which ensures 24/24 hour water supply for production activities in the Industrial Park.

Waste water treatment system

The wastewater system is located in the South of the Industrial Park, the wastewater in the Industrial Park is treated by microbiological methods according to a process in accordance with the prescribed standards, including 2 parts: a separate system in each factory and the collection system outside the factory leads to the gathering area for the second cleaning.

Rainwater drainage system

Rainwater drainage system of the Industrial Park is designed separately from industrial discharge water and discharged directly into streams in the area.

Communication systems

The communication system provided for the Industrial Park is connected to the telecommunications network of Ba Ria - Vung Tau Post Office, ensuring convenient and easy domestic and foreign communication including: telephone, Fax, Internet, data transmission…

Internal road system

• The roads in the Industrial Park are built with hot asphalt concrete structure to support the vehicle load H30.

• The main road in the Industrial Park has a width of 37m with a road surface width of 15m, a separation of 2m in the middle, and a sidewalk of 10m on each side, ensuring that vehicles with a load of over 60 tons can easily transport goods.

• Internal roads with a width of 19.5m have a width of 7.5m, sidewalks on each side are 6m wide.

The sidewalk part includes a 1.5 - 2m wide walkway, with light posts, green strips to create a landscape for the Industrial Park, below are technical systems.

• Centralized wastewater treatment plant: The capacity of phase 1 is 1,500m3/day.night, the quality of treated water reaches Column B according to QCVN 40:2011/BTNMT.

+ The capacity of phase 2 is 1,500m3/day.night.

• Service and service works: In the industrial park, there are two service zones planned with an area of ​​about 03 ha.

• Land for sublease: 93.65 ha, occupancy rate: 68%

• Rental price in 2020: 100-110 USD/m2 lease term until 18/05/2056

• Industrial park management fee: 0.5USD/m2/year

• Waste water treatment fee: 0.35USD/m3(Type A) and 0.4USD/m3(Type B)

• Other fees : no

• Electricity price: according to the tariff of EVN

• Price of water supply in 2020: 12,500 VND/m3

3. Advantages of connecting to the external transport system:

Road:

• To Ho Chi Minh 70 Km

• To Vung Tau 40 Km

• Railway: In addition, in the future, there will be a train system from Ho Chi Minh City. Ho Chi Minh - Bien Hoa - Vung Tau go parallel to National Highway 51.

Airline:

• About 70 Km from Tan Son Nhat International Airport

• About 20 Km from Long Thanh International Airport

Waterway:

• 08Km from Phu My port (allowing ships with a tonnage of 80,000 tons to pair ports)

• 05 Km from Thi Vai port (allowing ships with a tonnage of 54,000 tons to pair ports)

• 07 Km from Go Dau port (allowing ships with a tonnage of 20,000 tons)

• Cai Mep International Port 10Km (allowing ships with a tonnage of 80,000 tons)

With a convenient location in terms of road, rail, air and waterway traffic, My Xuan B1-Tien Hung Industrial Park is located in a very convenient location (with low transportation costs) for investors when transporting goods to other places.

4. Industries attracting investment:

Mechanical manufacturing, repair and assembly industry

Agricultural and forestry product processing industry

Light industry: Leather shoes, garment, stationery, plastic...

Electronics and refrigeration assembly industry

Construction material industry

And some other light industry. . .

5. Contact:

  1. Ms Hien Do – 0908 069 399 –hien.dt@nso.com.vn
  2. Mr Cuong Phan – 0913 855 528 –cuong.pd@nso.com.vn