1
|
Economic zone, Industrial Park, High Tech Park
|
MỸ PHƯỚC 4 INDUSTRIAL PARK
(THỚI HÒA INDUSTRIAL PARK)
|
2
|
Location
|
Thới Hòa commune, Bến Cát district, Bình Dương district
|
3
|
Legal
|
Thoi Hoa Industrial Park – Binh Duong Province
- Establishment Decision: No. 1717/CP-CN dated November 17, 2004 of the Prime Minister on the policy of building industrial zones in Binh Duong province;
- Decision approving detailed planning of industrial zones: No. 2203/BXD-KTQH dated October 27, 2005 of the Ministry of Construction on agreement on detailed planning of Thoi Hoa industrial zone, Binh Duong province; No. 4600/UBND-KTTH dated 12/10/2007 on adjustment of detailed planning of Thoi Hoa Industrial Park, Ben Cat district.
|
4
|
Scale, land area
|
4.1
|
Planning area
|
202,4ha
|
4.2
|
Actual area
|
|
+ Occupied
|
100%
|
|
+ Available
|
|
4.3
|
Number of businesses, projects are operating
|
|
+ Domestic business
|
|
|
+ FDI business
|
|
|
+ Main operating industries
|
|
5
|
Advantage of location
|
5.1
|
Transpotation connection
|
Distance to the nearest Big City::40 km from Ho Chi Minh City
Distance to Provincial Center: 04 km
Distance to nearest airport: 41 km from Tan Son Nhat airport
Distance to the nearest railway station: 40 km from Saigon station
Distance to the nearest river port: 30 km from Dong Nai port
Distance to the nearest seaport: 42 km from Saigon port
|
5.2
|
Infrastructure
|
Main shaft system: Up to industrial zone standards - Internal traffic system: 25-62m wide; has 04 lanes with a tonnage of 40 -60 tons.
|
5.3
|
Others
|
Climatic conditions: The climate in Binh Duong as well as the climate of the Southeast region: hot sun and rain, high humidity. The climate is tropical monsoon, divided into two distinct seasons: dry season and rainy season. The rainy season usually starts from May and lasts until the end of October. In the first months of the rainy season, heavy showers often appear, and then stop completely. The average annual temperature in Binh Duong ranges from 26oC to 27oC. The highest temperature sometimes reaches 39.3oC and the lowest from 16oC-17oC (night).
|
6
|
Land use term
|
2009-2059
|
7
|
Technical Insfrastructure
|
7.1
|
Electricial System
|
110V/22kv; 500MAV . substation
|
7.2
|
Water supply and drainage system
|
The pipe system from Ø 27 to Ø 800 forms a closed water supply loop in the whole area, leading directly to each plant to ensure adequate water supply pressure and flow with a water supply capacity of about 80,000 m3/day and night. .
|
7.3
|
Wastewater and waste treatment systems
|
The centralized wastewater treatment plant has a capacity of 16,000 m3 /day and night, ensuring to receive and treat it up to the standards of TCVN 5945:2005, column A before being discharged into the river.
|
7.4
|
Telecommunications system, internet
|
Full
|
7.5
|
Fire protection and fighting system
|
Completed
|
7.6
|
Status of investment, completion of infrastructure
|
Main shaft system: Up to industrial zone standards - Internal traffic system: 25-62m wide; has 04 lanes with a tonnage of 40 -60 tons.
|
8
|
Human Resources
|
8.1
|
Local labors
|
|
8.2
|
Labor in the vicinity
|
|
8.3
|
Training for main occupations
|
|
9
|
Social Infrastructure
|
|
10
|
Additional Services
|
|
11
|
Attracted investment fields
|
11.1
|
Priority areas
|
Garment industry (non-woven dyeing), leather and footwear (non-tanning), packaging paper processing (no pulp production); - Electrical industry, electronics, electrical machinery, machine manufacturing, mechanical engineering, machine repair, construction mechanics, equipment and spare parts; - Industry of building materials, ceramics, household furniture, metal and plastic, household tools, office equipment; - Processing industries of plant, forestry and aquatic products.
|
11.2
|
Others
|
|
12
|
Land for lease, factory and infrastructure use fee
|
12.1
|
Rental of land for lease
|
100-110USD/sqm
|
12.2
|
Rental of factory for lease
|
3,5 – 5,2USD/sqm/month
|
12.3
|
Infrastructure usage fee
|
|
12.4
|
Payment methods
|
|
13
|
Construction price
|
13.1
|
Office
|
|
13.2
|
Standard factory
|
|
13.3
|
Other items
|
|
14
|
Investment Expeneses
|
14.1
|
Electricity price
|
|
14.2
|
Water price
|
|
14.3
|
Gas and coal price
|
|
14.4
|
Apartment and department rental price for foreigners
|
|
14.5
|
Labor cost:
|
|
+ Labor management and engineering
|
|
|
+ Workers and unskilled workers
|
|
|
+ Insurance
|
|
14.6
|
Transportation costs
|
|
14.7
|
Cost of waste (water) treatment
|
|
14.8
|
Environmental protection fee
|
|
14.9
|
Customs fees
|
|
14.10
|
Other costs and fees
|
|
15
|
Contact |
- Ms Hien Do – 0908 069 399 –hien.dt@nso.com.vn
- Mr Cuong Phan – 0913 855 528 –cuong.pd@nso.com.vn
|