My Phuoc 4 Industrial Park

Oct 27, 2021

Location: Thoi Hoa Ward, Tan Uyen District, Binh Duong Province

Total area: 202.4 ha

MỸ PHƯỚC 4 INDUSTRIAL PARK (THỚI HÒA INDUSTRIAL PARK)

1

Economic zone, Industrial Park, High Tech Park

 MỸ PHƯỚC 4 INDUSTRIAL PARK

(THỚI HÒA INDUSTRIAL PARK)

 

2

Location

Thới Hòa commune,  Bến Cát district,  Bình Dương district

3

Legal

Thoi Hoa Industrial Park – Binh Duong Province

- Establishment Decision: No. 1717/CP-CN dated November 17, 2004 of the Prime Minister on the policy of building industrial zones in Binh Duong province;

- Decision approving detailed planning of industrial zones: No. 2203/BXD-KTQH dated October 27, 2005 of the Ministry of Construction on agreement on detailed planning of Thoi Hoa industrial zone, Binh Duong province; No. 4600/UBND-KTTH dated 12/10/2007 on adjustment of detailed planning of Thoi Hoa Industrial Park, Ben Cat district. 

 

4

Scale, land area

4.1

Planning area

202,4ha

4.2

 Actual area

 

+ Occupied

100%

 

+ Available

 

4.3

Number of businesses, projects are operating

 

+ Domestic business

 

 

+ FDI business

 

 

+ Main operating industries

 

5

Advantage of location

5.1

Transpotation connection

Distance to the nearest Big City::40 km from Ho Chi Minh City

Distance to Provincial Center: 04 km

Distance to nearest airport:  41 km from Tan Son Nhat airport

Distance to the nearest railway station: 40 km from Saigon station

Distance to the nearest river port: 30 km from Dong Nai port

Distance to the nearest seaport: 42 km from Saigon port

5.2

Infrastructure

Main shaft system: Up to industrial zone standards - Internal traffic system: 25-62m wide; has 04 lanes with a tonnage of 40 -60 tons.

5.3

Others

Climatic conditions: The climate in Binh Duong as well as the climate of the Southeast region: hot sun and rain, high humidity. The climate is tropical monsoon, divided into two distinct seasons: dry season and rainy season. The rainy season usually starts from May and lasts until the end of October. In the first months of the rainy season, heavy showers often appear, and then stop completely. The average annual temperature in Binh Duong ranges from 26oC to 27oC. The highest temperature sometimes reaches 39.3oC and the lowest from 16oC-17oC (night).

6

Land use term

2009-2059

7

Technical Insfrastructure

7.1

Electricial System

110V/22kv; 500MAV . substation

7.2

Water supply and drainage system

The pipe system from Ø 27 to Ø 800 forms a closed water supply loop in the whole area, leading directly to each plant to ensure adequate water supply pressure and flow with a water supply capacity of about 80,000 m3/day and night. .

7.3

Wastewater and waste treatment systems

The centralized wastewater treatment plant has a capacity of 16,000 m3 /day and night, ensuring to receive and treat it up to the standards of TCVN 5945:2005, column A before being discharged into the river.

7.4

Telecommunications system, internet

Full

7.5

Fire protection and fighting system

Completed

7.6

Status of investment, completion of infrastructure

Main shaft system: Up to industrial zone standards - Internal traffic system: 25-62m wide; has 04 lanes with a tonnage of 40 -60 tons.

8

Human Resources

8.1

Local labors

 

8.2

Labor in the vicinity

 

8.3

Training for main occupations

 

9

Social Infrastructure

 

10

Additional Services

 

11

Attracted investment fields

11.1

Priority areas

Garment industry (non-woven dyeing), leather and footwear (non-tanning), packaging paper processing (no pulp production); - Electrical industry, electronics, electrical machinery, machine manufacturing, mechanical engineering, machine repair, construction mechanics, equipment and spare parts; - Industry of building materials, ceramics, household furniture, metal and plastic, household tools, office equipment; - Processing industries of plant, forestry and aquatic products.

11.2

Others

 

12

Land for lease, factory and infrastructure use fee

12.1

Rental of land for lease

100-110USD/sqm

12.2

Rental of factory for lease

3,5 – 5,2USD/sqm/month

12.3

Infrastructure usage fee

 

12.4

Payment methods

 

13

Construction price

13.1

Office

 

13.2

Standard factory

 

13.3

Other items

 

14

Investment Expeneses

14.1

Electricity price

 

14.2

Water price

 

14.3

Gas and coal price

 

14.4

Apartment and department rental price for foreigners

 

14.5

Labor cost:

 

+ Labor management and engineering

 

 

+ Workers and unskilled workers

 

 

+ Insurance

 

14.6

Transportation costs

 

14.7

Cost of waste (water) treatment

 

14.8

Environmental protection fee

 

14.9

Customs fees

 

14.10

Other costs and fees

 

15

Contact
  1. Ms Hien Do – 0908 069 399 –hien.dt@nso.com.vn
  2. Mr Cuong Phan – 0913 855 528 –cuong.pd@nso.com.vn

 

Tags