1
|
Name of economic zones, industrial zones, hi-tech parks
|
Linh Trung 3 Export Processing Zone
|
2
|
Location
|
An Tinh commune, Trang Bang district, Tay Ninh province. Bordering with Cu Chi district, City. Ho Chi Minh
|
3
|
Legal
|
|
4
|
Scale, land area
|
4.1
|
Planned land area
|
Actual area: 202.67 ha. The area with completed infrastructure can be rented: 32.41 ha,.
|
4.2
|
Actual land area
|
|
+ Rented out
|
105.813 ha
|
|
+ Available
|
|
4.3
|
Number of businesses and projects in operation
|
|
+ Domestic company
|
Number of businesses and projects in operation
: 76; total registered capital is 354.96 million USD
|
|
+ FDI enterprises
|
|
|
+ Main industries and fields of activity
|
|
5
|
Location advantages
|
5.1
|
Traffic connection
|
- 53 km from Tay Ninh city
- 43 km from HCMC
- 37 km from Tan Son Nhat Airport
- 48 km from Linh Trung 1
- 45 km from Linh Trung 2
- 28 km from Moc Bai International Board Gate
- Next to Cambodia
|
5.2
|
The infrastructure
|
The area's terrain is flat, the elevation above sea level is from 5.5 m ~ 7.5 m. The average slope is about 0.2%. The geological foundation of the building has a good load-bearing capacity, with an average of 1~1.5kg/cm2 . The main composition consists of the clay layer.
|
5.3
|
Others
|
|
6
|
Operating time
|
From 2003
|
7
|
Technical infrastructure
|
7.1
|
Electricity distribution system
|
The national grid system meets the standards of TCVN 1985 - 1994. Voltage level: 22/04KV (+5 - 10%). Power station capacity 110 KV:80 MVA
|
7.2
|
Water supply and drainage system
|
The water plant provides clean water that meets TC505/BYT standards and is capable of supplying 15,000 m3/day.
In the industrial park, there are 2 separate drainage systems, a rainwater drainage system and an industrial wastewater drainage system.
|
7.3
|
Wastewater and waste treatment systems
|
Waste is collected and transported to a centralized treatment area according to regulations. Wastewater is preliminarily treated at the factory to meet the standards of the Industrial Park before being discharged from the factories and will be treated centrally at the wastewater treatment plant of the area meeting the standards of TCVN 5945:2005 before being discharged. to the drainage system outside the area. The capacity of the wastewater treatment plant is 10,000 m3/day.
|
7.4
|
Telecommunications system, internet
|
Smooth communication 1,500 IDD telephone lines provided to enterprises in the area.
|
7.5
|
Fire prevention and fighting system
|
|
7.6
|
Status of investment, completion of infrastructure
|
Internal road with hot asphalt concrete and designed according to VN H18-H30 standards.
|
8
|
Human Resources
|
8.1
|
Local labor
|
|
8.2
|
Laborers from neighboring areas
|
|
8.3
|
Major training fields
|
|
9
|
Social infrastructure
|
Có khu nhà ở công nhân, nhà ở chuyên gia và cán bộ quản lý
|
10
|
Support service
|
|
11
|
Investment attracting sectors
|
11.1
|
Preferential sectors
|
|
11.2
|
Other sectors
|
|
12
|
Land rental, workshop and infrastructure use expenses
|
12.1
|
Land rental price
|
|
12.2
|
Factory rental price
|
|
12.3
|
Infrastructure usage fee
|
|
12.4
|
Payment methods
|
|
13
|
Construction price
|
13.1
|
Office
|
|
13.2
|
Standard factory
|
|
13.3
|
Other category
|
|
14
|
Investment cost
|
14.1
|
Electricity price
|
|
14.2
|
Water price
|
|
14.3
|
Gas prices and coal prices
|
|
14.4
|
Rental price of houses and apartments for foreigners
|
|
14.5
|
Labor cost
|
|
+ Labor management and engineering
|
|
|
+ Workers and unskilled workers
|
|
|
+ Insurrance
|
|
14.6
|
Transport costs
|
|
14.7
|
Cost of waste (water) treatment
|
|
14.8
|
Environmental protection fee
|
|
14.9
|
Customs fees
|
|
14.10
|
Other costs and fees
|
|
15
|
Contact
|
National One Stop Services and Investments Organization
Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.
- Ms Hien Do – 0908 069 399 –hien.dt@nso.com.vn
- Mr Cuong Phan – 0913 855 528 –cuong.pd@nso.com.vn
- Ms. Truc Tran – 0396 296 580 –truc.tn@nso.com.vn
|