Lien Chieu Industrial Park

Oct 29, 2021

Lien Chieu IP

Investor: Saigon - Da Nang Investment Joint Stock Company

Location: Hoa Hiep Ward, Lien Chieu District, City. Danang

Area:289.35 ha

1

Name of economic zones, industrial zones, hi-tech parks

LIEN CHIEU IP

2

Location

Hoa Hiep Ward, Lien Chieu District, Danang

3

Legal

Decision No. 344/QD-TTg dated April 18, 1998 of the Prime Minister

4

Scale, land area

4.1

Planned land area

289.35 ha

4.2

Actual land area

 

+ Leased area

108,42 ha

 

+ Availble area

97,71 ha

4.3

Number of enterprises, projects on operating

 

+ Domestic enterprises

    No. of projects:26

   Registered capital: 5.973,3 billion VNĐ

 

+ FDI enterprises

No. of projects:5 - Registered capital: 73,4 million USD

 

+ Career, major active field

 

5

Geological advantages

5.1

Traffic connection

As one of the major and important industrial zones of Da Nang city, it is located near Hai Van Tunnel, which is convenient for transporting goods. Lien Chieu Industrial Park is located on National Highway 1A, 500m from the bypass of Da Nang City and Hai Van Tunnel. These are important traffic roads, connecting major economic centers of Vietnam such as Hanoi, going to the Central - Central Highlands, and going to Ho Chi Minh City, which are very convenient for the transportation of import and export goods. .

+ 20 km from Tien Sa seaport

+ 10 km from Danang International Airport

+ Located on the North – South transportation axis (both railway and road)

+ Located on East – West Economic Corridor 

5.2

Infrastructure

 

5.3

Other

 

6

Operation term

Until December 12th, 2046

7

Technical infrastructure

7.1

Power supply system

- Power supplied by the electricity substation 110/22KV with the capacity of 80MVA from national power grid.

- The wire system is installed along the internal roads in the IZ.

7.2

Water supply and drainage system

- Water is supplied by the water plant with the capacity of 5,000 m3/ day.

- The internal pipeline system is installed along the internal roads in the IZ, providing sufficient water to the project sites.

- The sewage system is constructed along the internal roads in the IZ, ensuring the timely collection of rainwater from the factory campus to discharge into rivers, and sea.

7.3

Wastewater, waste treatment system

- The wastewater treatment station is constructed with the capacity of 5,000 m3/ day.

- Wastewater from production and daily activities are collected and preliminarily treated at the factory. After the process, if the treated wastewater reaches B level’s criteria or lower pursuant to QCVN24/BTNMT, it will be discharged. Otherwise, it will be transferred to the central wastewater treatment station to be treated further before being discharged.

- The waste and garbage are collected and treated by the urban environment company.

7.4

Telecommunication, internet

The telephone line and cable system have been installed by service providers in the IZ, ensuring to meet investors’ demand. 

7.5

Fire prevention and fighting

The system is well-equipped

7.6

Investment situation, finishing infrastructure

The IZ’s infrastructure has been completed

8

Human resources

8.1

Laborers in locality

The labors mainly come from the universities, colleges and vocational training centers in Danang.

8.2

Laborers from neighboring areas

Quang Nam, Thua Thien – Hue, Quang Ngai…

8.3

Major training fields

Mechanical-electronics; mechanics, chemical techniques; environmental technology, electrical engineering; ICT; electronics and telecommunication; Construction; automation;  economics and business; pharmacy; nursing; clinical practice; community healthcare; foreign languages...

9

Social infrastructure

Universities, vocational facilities: 06

- University of Danang

+ Danang University of Technology

+ Danang University of Education

+ Danang University of Foreign Language

+ Danang University of Economics

- Duy Tan University

- Dong A University

- Danang University of Architecture

- Danang University of Physical Education and Sports

- Danang University of Medical and Pharmacy Technology

Colleges: 14

Professional secondary schools: 7

Vocational Training Centers: 59

10

Support service

Logistics and transportation:

- Sea shipping companies such as Wanhai, Maersk, Mitsui…

- International express mail services such as DHL, TNT…

- Domestic and international freight forwarders such as Logistem…

Finance - Banking - Insurance:

- Commercial banks in all economic sectors

- 4 big joint-venture banks: Vinasiam Bank, VID Public Bank, Indovina Bank, Viet

- Domestic and international financial organizations

- Insurance agencies: Bao Viet, Bao Minh, AIA, Manulife Prudential…

Consulting - Auditing: Independent auditing companies: AAC.

Customs: The head office is next to the IZ, assisting investors with customs procedures to import and export goods

Tourism - Transportation - Accommodation (hotels, restaurants): Plenty of resources

11

Investment attracting sectors

11.1

Preferential sectors:

Manufacturing of electric – electronic equipment and components; mechanical precision products;  automotive assembly; supporting industries

11.2

Other sectors:

Garments, food products, new technology construction materials

12

Land rental, workshop and infrastructure use expenses

12.1

Land rental price

85 USD/m2/project life until 2046

12.2

Workshop rental price

3 USD/m2/month

12.3

Infrastructure use expense

0.4 USD/m2/year

12.4

Payment method

- One-off payment for land rental

- Quarterly payment for production facility rental

- Annual payment for infrastructure usage fee

13

Construction price

13.1

Office

 

13.2

Standard workshop

 

13.3

Other

 

14

Investment costs

14.1

Power price

Pursuant to Decision No. 4887/2014/QD- BCT dated 29/5/2014, the power cost for industrial zones (VAT excluded): File attachment

14.2

Water price

+ For production provision: VND 8,100/m3

+ For trade- services provision: VND 12,200/m3

14.3

Gas and coal price

 

14.4

House, apartment rental price for foreigners

 

14.5

Labor cost

 

+ Management and Technical workers

negotiable 

 

+ Worker and unskilled worker

Minimum wage: VND 2,500,000 /person/month 

 

+ Insurance

Pursuant to the law

14.6

Transportation cost

 

14.7

(Wastewater) waste treatment expenses

Pursuant to Decision No. 8836/QD-UBND dated October 26th, 2012 regulating the unit price of wastewater treatment at Lien Chieu IZ as follows:

+ COD ≤ 200mg/l - unit price: VND 3,630 /m3

+ 200mg/l ≤ COD ≤ 1,000mg/l – unit price: VND 6,900 /m3

+ 1,000mg/l ≤ COD ≤ 2,000mg/l – unit price: VND 12,000 /m3

+ COD ≥ 2,000mg/l - unit price: VND 18,000 / m3

Note: The above-mentioned price includes environment protection fee, and VAT.

14.8

Environmental protection fees

VND 630 /m3, which is included in the wastewater treatment unit price

14.9

Customs expense

 

14.10

Other expenses and fees

 

15

Contact

National One Stop Services and Investments Organization

Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.

Contact:

  1. Ms Hien Do – 0908 069 399 – hien.dt@nso.com.vn
  2. Mr Cuong Phan – 0913 855 528 – cuong.pd@nso.com.vn