INTRODUCE ABOUT PHU MY 3 INDUSTRIAL PARK - BA RIA - VUNG TAU PROVINCE

Jun 23, 2022

INTRODUCE ABOUT PHU MY 3 INDUSTRIAL PARK - BA RIA - VUNG TAU PROVINCE
- Address: located in Phuoc Hoa Ward, Phu My town, Ba Ria - Vung Tau province.
- Investor: Thanh Binh Phu My Joint Stock Company - 100% Vietnamese private capital.
- Time of land use: 2077.
- Total investment capital: 6.03 trillion VND
- Total area: 1,046 hectares
- Geographical location: Phu My 3 Industrial Park has a convenient location, connecting with National Highway 1A, National Highway 51, Expressway Ho Chi Minh City - Long Thanh - Dau Giay, Expressway Ben Luc - Long Thanh, Expressway Ho Chi Minh City - Bien Hoa, far from centers and ports, convenient for import and export traffic and freight.
• By road: 60 km from Ho Chi Minh city center, 15km from Vung Tau city.
• Aviation: 68km from Tan Son Nhat airport, 30km from Long Thanh international airport
• Railway: 68km from Saigon station, 60km from Bien Hoa station
• By sea: 2km from Cai Mep port, 62km from Saigon port, 27km Vung Tau port. 
- Sectors attracting investment: Heavy industry (Petrochemical, chemical, basic materials, metallurgy,...); Multi-industry (Supporting industry, Electronics, and electrical appliances, textiles, medical equipment, consumer goods, Plating, Automotive, high technology, pharmaceutical,...); Port and logistics services; Other convenient services
- Infrastructure in the IP:
• Traffic system: Main axis system (how many meters wide, how many lanes): About 44m wide, 2 lanes. Internal traffic system (how many meters wide, how many lanes): About 30m wide, 2 lanes.
• Electricity: The power supply system is self-invested by Phu My 3, developed and connected from the 110kV substation of EVN to reduce voltage to 22kV and distribute to the fence of the customer's factory by a modern underground cable system with a total capacity of 4x63MVA.
• Water: Water volume (m3/day): 90,000 m3 – 100,000 m3
• Wastewater treatment system: Factory standard: grade A, (QCVN24:2011/BTNMT); operates 24 hours a day 365 days. Maximum treatment capacity (m3/day): - Phase 1: 9,000 m3/day - night - Phase 2: 45,000 m3/day - night Current wastewater treatment capacity (m3/day): 9,000 m3 /day - night
• Firefighting system: The Industrial Park has built and installed a system of fire hydrants along the internal road with a distance of 50m. There will be a fire hydrant. Besides, the grassroots fire protection team has 25 members who are always on duty in the area.
• Communication: The telecommunications system is invested in and built by the industrial park with a modern underground cable line to the fence of the customer's factory. Internet services: Signing contracts with 2 network operators, VNPT and Viettel.
- Investment incentives: 2 years of tax exemption and 50% tax reduction for the next 4 years as prescribed in Decree No. 2 ND-CP of the Government.

Tags