1
|
Name of economic zones, industrial zones, hi-tech parks
|
HOA CAM INDUSTRIAL PARK
|
2
|
Location
|
Hoa Tho Tay Ward, Cam Le District, Da Nang City
|
3
|
Legal
|
Decision 1107/QD-TTg and documents of the Prime Minister.
|
4
|
Scale, land area
|
4.1
|
Planned land area
|
149.84 ha
|
4.2
|
Actual land area
|
|
+ Leased area
|
107.07ha
Occupied area:94.93 ha
|
|
+ Availble area
|
12.14 ha
Occupancy rate: 88.66%
|
4.3
|
Number of enterprises, projects on operating
|
|
+ Domestic enterprises
|
No. of projects:53
Registered capital:1,142.8 billion VNĐ
|
|
+ FDI enterprises
|
No. of projects:11 - Registered capital:78.05 million USD
|
|
+ Career, major active field
|
- Mechanical assembly, electronics
- Food processing industry;
- Construction materials; hi-end interior decoration
|
5
|
Geological advantages
|
5.1
|
Traffic connection
|
Hoa Cam IZ is located in the southwest of Danang city, in Cam Le district, next to 14B street. The IZ is situated 08 km from the city center, 15 km from Tien Sa port, 05 km from Danang International Airport, 07 km from Danang Railway Station, and 01 km from 1A National Highway. Especially, the Danang – Quang Ngai Expressway passes Hoa Cam IZ, and the cross section of the road is 60m.
|
5.2
|
Infrastructure
|
|
5.3
|
Other
|
|
6
|
Operation term
|
Until August 8th, 2054
|
7
|
Technical infrastructure
|
7.1
|
Power supply system
|
- Power supply: from Cau Do Substation (next to the eastern fence of the IZ)
- The medium-voltage power supply system and the substations have been constructed
- Lighting system: from the medium-voltage line in the IZ
|
7.2
|
Water supply and drainage system
|
- Water supply: from Cau Do Water Plant using the D300 pipeline along Hoa Tho Tay – Hoa Nhon Street. The internal pipeline system in the IZ is D100 – D200.
- Drainage system: in the IZ, the rainwater drainage system is made of concretes, and reinforced-steel concrete, and discharges into Cam Le River.
|
7.3
|
Wastewater, waste treatment system
|
Wastewater collection system: using HDPE pipe with the diameter of D160 – D400 to transport water to the waste water treatment plant. After the process to reach A level, the water is discharge into Cam Le River.
|
7.4
|
Telecommunication, internet
|
The system is well-equipped and meets the demand of the investors.
|
7.5
|
Fire prevention and fighting
|
There are 26 fire hydrants on the pavement along the internal roads in the IZ. The distance between the fire hydrants is 120m – 150m, and the fire hydrant’s diameter is D 200mm.
|
7.6
|
Investment situation, finishing infrastructure
|
|
8
|
Human resources
|
8.1
|
Laborers in locality
|
The human resource mainly comes from:
+ Danang University
+ Duy Tan University
+ Danang University of Physical Education and Sports
+ Danang University of Architecture
+ College of Transportation No. 2
+ College of Economics and Planning No. 2
+ College of Food Industry
+ More than 50 other vocational training centers
|
8.2
|
Laborers from neighboring areas
|
Quang Nam, Quang Ngai, Hue, Quang Binh
|
8.3
|
Major training fields
|
|
9
|
Social infrastructure
|
Security: Hoa Tho Tay Ward police station, Cam Le District police station
Hospitals: Cam Le General Hospital
Worker’s accommodation: under construction
|
10
|
Support service
|
Logistics and transportation: Vinafco Danang Company, Viconship, Vinatrans, Danatrans…
|
11
|
Investment attracting sectors
|
11.1
|
Preferential sectors:
|
Hoa Cam IZ was founded pursuant to Decision No. 2459/QD-UB dated April 25th, 2013 of the Chairman of Danang People’s Committee. This is a clean IZ focusing on attracting projects that are environmentally friendly and use advanced technologies.
Preferential sectors:
- Mechanical assembly, electronics
- Food processing industry; construction materials; hi-end interior decoration;
|
11.2
|
Other sectors:
|
Other industries (plastic, beauty product, packaging…).
|
12
|
Land rental, workshop and infrastructure use expenses
|
12.1
|
Land rental price
|
891,000 VNĐ/ m2/project life until 2054
|
12.2
|
Workshop rental price
|
No
|
12.3
|
Infrastructure use expense
|
13,000 VNĐ /m2/year
|
12.4
|
Payment method
|
One – time payment for the entire leasing period (08/8/2045)
|
13
|
Construction price
|
13.1
|
Office
|
|
13.2
|
Standard workshop
|
|
13.3
|
Other
|
|
14
|
Investment costs
|
14.1
|
Power price
|
Pursuant to Decision No. 4887/2014/QD- BCT dated 29/5/2014, the power cost for industrial zones (VAT excluded): File attachment
|
14.2
|
Water price
|
(pursuant to Decision No. 46/2010/QD-UBND dated December 20th, 2012) (VAT included)
+ For production provision: VND 8,100/
+ For trade- services provision: VND 12,200/
|
14.3
|
Gas and coal price
|
Pursuant to the People’s Committee’s regulations
|
14.4
|
House, apartment rental price for foreigners
|
|
14.5
|
Labor cost
|
|
+ Management and Technical workers
|
negotiable
|
|
+ Worker and unskilled worker
|
negotiable
|
|
+ Insurance
|
Pursuant to the law
|
14.6
|
Transportation cost
|
|
14.7
|
(Wastewater) waste treatment expenses
|
Pursuant to Legal document No. 4933/QD-UBND dated July 16th, 2013 regulating the unit price of collecting and treating 1m3 of wastewater at Hoa Cam IZ
|
14.8
|
Environmental protection fees
|
Pursuant to the People’s Committee’s regulations
|
14.9
|
Customs expense
|
|
14.10
|
Other expenses and fees
|
|
15
|
Contact
|
National One Stop Services and Investments Organization
Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.
Contact:
- Ms Hien Do – 0908 069 399 – hien.dt@nso.com.vn
- Mr Cuong Phan – 0913 855 528 – cuong.pd@nso.com.vn
|