Ham Kiem 2 Industrial Park

Aug 09, 2021

Ham Kiem II INDUSTRIAL PARK – BITA'S

Investor: Binh Tan Investment Joint Stock Company

Location: Ham Kiem commune, Ham Thuan Nam district, Binh Thuan province.

Area: 402ha

1

1. Construction site : Ham Kiem commune, Ham Thuan Nam district, Binh Thuan province, right next to National Highway 1A axis, section Phan Thiet to Ho Chi Minh City; 12 km from Phan Thiet city, far from the city. 187 km from Ho Chi Minh City, 7 km from Binh Thuan Station, 11 km from Phan Thiet Station.

 

2

2. Scale : 402 ha.

- Industrial land area for lease: 261 ha.

- Land area for rent: 33 ha (12.5% ​​occupancy rate)

- Area of ​​industrial land with completed infrastructure and ready for lease: 228 ha.

 

3

3. Technical infrastructure system : Has been built synchronously, ensuring the standards of a   Green-Clean-Beautiful-Modern Industrial Park.

- Internal roads: 2 main axes have a width of 44 m, the other roads are 24 m and 32 m wide, covered with asphalt concrete, designed to bear H30 load according to Vietnamese standards.

- Electricity: 110/22KV; total capacity 2x63MVA

- Water: Currently projects in industrial parks supplied with water by the water plant with a capacity of 18,000 Phan Thiet 3 / day; By 2020, Ham Kiem Industrial Park Water Plant (01 km away from the Industrial Park) with a capacity of 20,000m 3 /day and night will serve projects in the IZ.

- Contact information: 15,000-number telephone network connecting the telecommunications system of Binh Thuan province.

- Waste water treatment system: Waste water treatment plant with a capacity of 17,000 m 3 /day and night; in which phase 1: 2,500 m 3 /day and night has been put into operation. Enterprises treat to column B - standard QCVN 40:2011/BTNMT, Centralized wastewater treatment plant of industrial park treats wastewater to column A - standard QCVN 40:2011/BTNMT.

 

4

4. Advantage:

- Convenient transportation:

Road : Located next to National Highway 1A, 2 km from North-South Expressway, section Phan Thiet - Dau Giay.

+ Waterway: 12 km from Phan Thiet port; 110 km from Vinh Tan general port (Binh Thuan province); 120 km from Cai Mep - Thi Vai port (BR-VT).

Railway: 7 km from Binh Thuan station; 11 km from Phan Thiet station.

By air : 32 km from Phan Thiet airport (construction has started and is expected to come into operation in 2023).

- Residence: The project consists of 20 apartment blocks and 72 villas for professionals with utilities for the daily life of residents such as kindergartens, schools, fitness and sports centers , commercial centers, convenience stores, traditional markets, parks, etc. The project provides accommodation for 18,000 workers working in the industrial park and surrounding areas.

 

- Abundant local labor force, young and healthy, labor costs lower than other industrial zones.

- Land rent is lower than neighboring provinces.

- Hard ground should save construction costs for investors.

 

5

5. Investment incentives:

- Ham Kiem II Industrial Park is located in a difficult socio-economic area, investors are entitled to corporate income tax incentives according to Decree No. 218/2013/ND-CP of the Government.

- Free support on investment advice, legal procedures related to investment and business registration...

6. Prioritize projects in the following industries:

Spinning – textiles; processing canned food and beverage ; production of consumer goods, household goods, packaging of all kinds, leather shoes (not tanning) ; mechanical assembly, production of mechanical components; household wood processing, handicrafts; producing ceramic and ceramic tiles for interior decoration; assembling electronics, household appliances, computer components, communication and sensors; processing cosmetics and preparations ; liquefied petroleum gas (LPG) extraction; warehousing services ( transshipment and warehousing services ); fertilizer production, for organic fertilizers ( not using raw materials ); Producing livestock, poultry, shrimp and fish feed ( not producing fishmeal from raw materials ); pharmaceutical production; manufactures building materials, concrete and products from concrete, cement and plaster.

 

6

7. Land rent and expenses:

          - Land rental price: 38-45 USD/m 2 (price excluding VAT, one-time payment, depending on location);

          - Fee for using infrastructure: 0.3 USD/m 2 /year (price does not include VAT);

         - Waste water treatment fee: 0.3 USD / m 3 (price does not include VAT).

 

7

           8. Contact information :

 

National One Stop Services and Investments Organization

Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.

Please contact:

  1. Ms Hien Do – 0908 069 399 – hien.dt@nso.com.vn
  2. Mr Cuong Phan – 0913 855 528 – cuong.pd@nso.com.vn
  3. Ms. Truc Tran – 0396 296 580 – truc.tn@nso.com.vn

 

 

Tags