1
|
Hai Yen Industrial Park is located in Hai Yen Ward, Mong Cai City. From the industrial park to the provinces, cities and major economic centers of the North of Vietnam and the South of China, it is conveniently connected with a modern and synchronous transportation system by road, rail, by sea and by air.
Hai Yen Industrial Park was built in 2005 with a total area of ββ182 hectares. It is the Industrial Park of Mong Cai border gate economic zone, Quang Ninh.
|
2
|
Climatic conditions:
Quang Ninh is located in the humid subtropical climate region typical for the northern provinces and has its own characteristics of a coastal mountainous province with a hot, humid summer with a lot of rain, a cold and dry winter, with little rain. Rain and hot and humid tropics are the most prevalent. Due to the influence of geographical location and topography, Quang Ninh is strongly influenced by the northeast monsoon and weak by the southwest monsoon compared to the northern provinces. The average temperature in the year is from 21 to 23oC. There is a difference between the mountainous and coastal areas
|
3
|
Priority fields:
Production of building materials, interior decoration; Production of consumer goods; Garment and embroidery industry for export; Mechanical industry, machine manufacturing; Manufacturing and assembling electronic goods and electrical equipment; Processing agricultural products and food; Warehouses, gathering of raw materials; Several other industries.
Time to put into operation: 2005
|
4
|
LOCATION
Distance to the nearest big city:: from City. Ha Long 170Km
Distance to provincial center: 06Km . from Mong Cai international border gate
Distance to nearest airport: 140Km from Van Don airport
Distance to nearest Railway Station:
Distance to the nearest river port: 30Km . from Hai Ha deep water
Distance to the nearest seaport : 20Km from Van Gia seaport
|
5
|
Transportation System
-Located on National Highway 18, connecting trade between Hanoi - Hai Phong - Quang Ninh (Vietnam) - Guangxi (China); located next to Hanoi - Hai Phong - Ha Long - Van Don - Mong Cai highway; - Internal traffic system: Occupying 13.5% of the total area of ββthe Industrial Park with two main lanes 33m wide, the ring road 21.25m wide.
|
6
|
THE INFRASTRUCTURE
electricity
110/22kv with 2x16MVA . capacity
Country
Water supply: 6,500 m3/day
Wastewater treatment
Capacity: 4,000 m3/day
Process rubbish
System of fire
Have
Communications
Full
Other information
|
7
|
AREA & STATUS
Total planned area
130.9 (ha)
Area available for rent
60 (ha)
Contact the industrial park directly
Smallest rental area
10000 (m2)
Occupancy
34.16%
|
8
|
COST
Land lease
USD/m2
Contact the industrial park directly
Rent warehouse
USD/m2
Contact the industrial park directly
Management fee
Contact the industrial park directly
Electricity price
According to the state unit price
Water price
According to the state unit price
Cost of wastewater treatment
Contact the industrial park directly
Solid waste treatment fee
Contact the industrial park directly
|
9
|
Corporate income tax incentives
- Corporate income tax incentives: 10% for a period of 15 years - Tax exemption for the first 4 years and 50% reduction For the next 9 years - Personal income tax is exempted from 50%
Import tax incentives
According to state regulations
VAT incentives
According to state regulations
Other offers
|