Du Long Industrial Park

Aug 27, 2021

Du Long Industrial Park 

Investor: Hoa Sen - Du Long Industrial Park Infrastructure Investment Joint Stock Company.

Location: Loi Hai and Bac Phong commune, Thuan Bac district, Ninh Thuan Province.

Operation time: 2018

Area: Total area 407.28 hectares

 

1

Du Long Industrial Park was approved by the Prime Minister for construction in Document No. 256/TTg-CN dated March 14, 2005 and was established by the Chairman of Ninh Thuan Provincial People's Committee in Decision No. 3848/ QD-UBND dated 30/6/2008.
 

2

1. Geographical location

Du Long Industrial Park is located in the delta of Ninh Thuan province, located at Km 1540+598 on National Highway 1, in the territory of 2 communes Loi Hai and Bac Phong, Thuan Bac district; 30 km from Cam Ranh Port, Khanh Hoa province; far from the city. Phan Rang - Thap Cham 20 km. The North borders the residential area of ​​Loi Hai commune, the South borders the Ba Thap residential area of ​​Tan Hai commune, the East borders National Highway 1, the West borders the North-South railway... for circulation and operation of the industrial park.

2. Investor: Hoa Sen - Du Long Industrial Park Infrastructure Investment Joint Stock Company.

 

3

3. Area size

Total area 407.28 hectares

4. Nature and planning of industries calling for investment

Du Long Industrial Park is an industrial park that focuses on prioritizing industries that have little impact on the environment. Mainly arrange electronic assembly plants, informatics, high-tech industries; assembling cars and motorbikes; mechanical industry manufacturing agricultural and industrial machines; construction material industry, agro-forestry-fishery processing industry; production of consumer goods.

 

4

5. Investment advantage

5.1. Traffic advantage

Convenient road traffic because the industrial park is located adjacent to National Highway 1A. The industrial park also has a great advantage in water and air traffic when it is only 30 km from Cam Ranh port and airport.

In addition, the industrial park is very close to major urban centers: far from the city. Phan Rang - Thap Cham, Ninh Thuan province: 20 km, far from the city. Nha Trang, Khanh Hoa province: 60 km, near Thap Cham tourist area, Vinh Hy Bay, Binh Son - Ninh Chu ...

5.2. Human Resources

- Labor force: The province's population is 590,467 people, of which the population of working age is 343.7 thousand people, accounting for 58.6% of the province's population; the rate of trained workers is about 52.8%. With the above abundant labor source, it will meet the labor demand for investment projects in the industrial park.

- Vocational training and training: In the province, there are Pedagogical Colleges, Vocational Colleges, Political Schools, Water Resources University and vocational and vocational schools; Every year thousands of students graduate.

 

5

5.3.Infrastructure

- Electricity:

The power source is taken from DK - 110 KV running in parallel with NH1. 110 KV electricity will be supplied by the power sector to the 110/22 KV transformer station in the fence of the industrial park.

- Country:

+ Water source: Ensure water supply according to the needs of investment projects.

+ Waste water treatment: Waste water will be treated locally to meet the standards at the factories and then transferred to a treatment station with a capacity of 16,300 m 3 /day.

- Telecommunication: 

Switchboard with 3,280 subscribers, connected to the national information network and ADSL system serving factories.

 

6

Land rental price for secondary investment projects in industrial zones:

- Land rental price: 25 USD/m2/whole term

- Payment method: Agreement with Infrastructure Investor.

- Factory rental: 2USD/m2

- Reference price: About 100 - 300USD/person/month

7

For more information, please contact

National One Stop Services and Investments Organization

Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.

Please contact:

  1. Ms Hien Do – 0908 069 399 – hien.dt@nso.com.vn
  2. Mr Cuong Phan – 0913 855 528 – cuong.pd@nso.com.vn
  3. Ms. Truc Tran – 0396 296 580 – truc.tn@nso.com.vn

    

 

 

Tags