Dong Mai Industrial Park

Oct 29, 2021

DONG MAI INDUSTRIAL PARK

Investor: Viglacera Infrastructure Investment and Development Company

Location: Dong Mai ward, Quang Yen town, Quang Ninh province

Area:  167.86 hectares

1

General information

 

- Location: Dong Mai ward, Quang Yen town, Quang Ninh province.

- Infrastructure investor: Viglacera Infrastructure Investment and Development Company

- Area: 167.86 hectares

- Properties: As a multi-sector general industrial park with high-tech nature, clean industry, environment-friendly. 

Leasing term: 2058

Rental fee: 82-90USD/m2

2

- List of industries prioritized to attract investment:

 

High-tech applications on the list of high-tech prioritized development; High-tech applications on the list of high-tech products encouraged for development; Producing industrial products to support development priority; High-tech incubation, venture investment for high-tech development, production of biotechnology products; Producing software products, digital information content products, key information technology products; Producing new materials, light building materials, rare and precious materials, energy-saving projects, and environmentally friendly projects; Manufacture of accessories, electronic components, electronic assemblies; Manufacture and assemble automobiles, auto parts, manufacture machine tools, equipment, machines and spare parts for agricultural, forestry and fishery production; Producing materials to replace asbestos materials;

Producing and processing clean, environmentally friendly agricultural products, applying high technology; Producing and refining animal, poultry and aquatic feed; Manufacture of beverage products.

 

3

Location and regional relations

 

- Distance from Hanoi city center: About 120 km.

- Distance from the center of Ha Long city, Quang Ninh province: About 30 km

- By road: Located on National Highway 18 from Hanoi to Mong Cai International Border Gate; Connecting with Hai Phong city (about 40 km from Hai Phong city center) and Northern coastal provinces along National Highway 10. Connecting with Ha Long - Hai Phong highway through Dai Yen intersection about 13 km.

- Seaport: About 20 km from Cai Lan port (Ha Long, Quang Ninh); About 27 km from Dinh Vu port (Hai Phong city).

- Airport: About 120 km from Noi Bai airport (Hanoi); About 32 km from Cat Bi airport (Hai Phong); About 80km from Van Don International Airport (Quang Ninh).

- Railway: Close to Yen Vien railway line (Hanoi - Pha Lai - Ha Long - Cai Lan); About 08 km from Uong Bi station (Uong Bi, Quang Ninh).

 

4

- Internal traffic:

The central trunk road of the industrial park has a width of 57 m. Internal roads in the industrial park include roads with width of 22.5 m and 19.5 m. 

 

 

5

- Power source:

From the 110kV line passing through the Industrial Park to supply power to the 110/22KV-2x16MVA substation of the Industrial Park in the technical infrastructure area. The 22kV power grid for industrial plants is supplied from the substation via overhead lines on the sidewalks of traffic routes.

 

6

- Water source:

From the main water supply pipe on National Highway 18 leading water from Yen Lap Water Plant to the water supply station in the Industrial Park.

 

7

- Drainage system, wastewater and waste treatment system:

 

+ There are ditches surrounding the IZ to collect and drain rain water for the IZ and adjacent areas to drain into the area's common drainage system; round culverts are arranged along the sidewalks of roads to collect and direct all rain water in the industrial zone to the drainage ditches; On the sewer lines, there are manholes to collect water.

+ Waste water from factories is collected to pumping stations to be brought to the centralized wastewater treatment station of the whole industrial park. Wastewater treatment station phase 1 (in the technical infrastructure area north of the industrial zone) has a capacity of 1,100 m3/day, an area of ​​about 01 ha; phase 2 (in the south of the industrial zone) with a capacity of 2,060 m3/day, with an area of ​​about 2.7 ha.

 

8

+ Daily waste is collected and transported to the area's centralized treatment point.

 

9

- Communication system:

Planning 01 telephone switchboard with 2,000 numbers in the operating center to serve the communication needs of the industrial zone; The switchboard is connected to the regional information grid by underground optical cable.

 

10

Contact

National One Stop Services and Investments Organization

Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.

Contact:

  1. Ms Hien Do – 0908 069 399 – hien.dt@nso.com.vn
  2. Mr Cuong Phan – 0913 855 528 – cuong.pd@nso.com.vn