Dai Ngai Industrial Park

Aug 02, 2021

Dai Ngai Industrial Park - Soc Trang

• Investor: Soc Trang Industrial Parks Authority

• Address: Long Duc Commune, Long Phu District, Soc Trang Province

• Total area: 200ha

Selecting Industrial park investor

1

Dai Ngai Industrial Park was approved for planning according to Decision 1107/QD-TTg of the Prime Minister with a total area of ​​80 hectares and increased to 200 hectares according to Official Letter No. 1153/TTg-CN of the Prime Minister Government on Adjusting the development planning of industrial zones in Soc Trang province to 2020

 

Dai Ngai Industrial Park is located in Long Duc Commune, Long Phu District; The infrastructure of the industrial park is being continuously invested and completed; The sectors and industries that attract investment in the industrial park are expected to be the food processing industry, the production of building materials, the manufacturing of machinery and equipment for industrial production and manufacturing. , assembly of motorcycles, cars, shipbuilding, industrial sewing, electrical products, industrial electricity, electronic industry, semiconductors, informatics technology, high technology...

2

Location and traffic

 

Dai Ngai Industrial Park is located in a location with a relatively convenient transportation system for the transportation and circulation of goods:

• 231km . from Ho Chi Minh City

• 62km from Can Tho

• 3km . from Dai Ngai Bridge

• Located on National Highway 1A connecting Can Tho, Hau Giang, Bac Lieu, Ca Mau provinces. Highway 60 connects Soc Trang with Tra Vinh, Ben Tre and Tien Giang provinces.

• The East borders on South Song Hau road, length 960m

• The West borders on Ba Sam canal, 900m long;

• The South borders residential land, length 910m;

• The North borders on residential land, the length is 820m;

3

Infrastructure and other facilities

 

The infrastructure system of Dai Ngai industrial park is being invested synchronously and completely, especially with a coal power plant with a capacity of 4400 MW located right in the industrial park.

Besides building synchronous and modern infrastructure, Dai Ngai Industrial Park also provides a series of other convenient services including: 24/7 security service, fire prevention, logistics, maintenance. maintenance, factory construction, waste collection, banking.

 

Time and cost of operation at Dai Ngai industrial park

Project time:

• 50 years from the date of issuance of the investment certificate.

• Investors can rent or transfer, invest

• During the rental process, investors can sublease or transfer to other retail investors

Investment cost in Dai Ngai industrial park:

• Rent with infrastructure: 40-50USD/m2

• Electricity price: peak hour is 0.1USD/kwh; normal hour is 0.05USD/kwh; off-peak hour is 0.03USD/kwh.

• Water price: 0.4USD/m3

• Labor cost: with reference price is 200-500 USD/person/month. Depends on job location

• Management fee: 0.2USD/m2/year

• Waste water treatment fee: $0.28/m3

4

National One Stop Services and Investments Organization

Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.

  1. Ms Hien Do – 0908 069 399 – hien.dt@nso.com.vn
  2. Mr Cuong Phan – 0913 855 528 – cuong.pd@nso.com.vn
  3. Ms. Truc Tran – 0396 296 580 – truc.tn@nso.com.vn

 

Tags