Dai An Expansion Industrial Park

Jul 01, 2021

DAI AN EXPANSION INDUSTRIAL PARK

Investor: Dai An Industrial Park Infrastructure Development One Member Company Limited (Vietnam)

Location: Tu Minh ward, Hai Duong city and Cam Dong and Cam Doai communes, Lai Cach town, Cam Giang district, Hai Duong province

Area:  416ha

Founded year

2007

Infrastructure investor

Dai An Industrial Park Infrastructure Development One Member Company Limited (Vietnam)

local points

Tu Minh ward, Hai Duong city and Cam Dong and Cam Doai communes, Lai Cach town, Cam Giang district, Hai Duong province

Acreage

- Total planned area: 416.21ha; in which, phase 1 is 189.02

- Natural land area (phase 1): 189.02ha

- Industrial land for lease: 129.85ha

- Industrial land area for rent: 85.78ha

- Fill rate: 66.06%

Industry attracting investment according to the plan

- Group of electronic and telecommunications projects: Manufacturing, processing and assembling electrical, electronic and telecommunications components; Manufacture of generators, transformers and electrical equipment.

- Group of mechanical projects: Production and assembly of aluminum; processing products of plating, coating and polishing metal (plating and metallurgy in small stages for products); Manufacturing and assembling cars, motorbikes and other means of transport, metal structures.

- Projects of wood processing, production of glass, ceramic and porcelain: Processing and producing wood chips, plywood, wood, furniture; Producing and processing glass, ceramic, porcelain; Producing packaging, cardboard, steel pallets, wooden pallets.

- Food and beverage processing project: Production of food and animal feed; Food and beverage production; Processing and drying agricultural products.

- Group of projects on chemicals, pharmaceuticals, cosmetics, household appliances: pharmaceutical chemicals, industrial plastics; Concrete admixtures, environmental chemicals; Production and preparation of chemicals, pharmaceuticals, cosmetics, plastics, plastics; Manufacture of coating materials; Manufacture of household appliances.

- Group of other projects: Nanotechnology new materials manufacturing industries; Mechanical industry, manufacturing industrial machines, agricultural machines; Shipping and manufacturing supporting industries; Textile industry (not dyed), garment; Producing labels printed on all materials; Music box production.

Geographical location

- 80 km from Noi Bai International Airport

- 50 km from Hanoi center

- 50 km from Hai Phong port and Hai Phong airport

- 80 km from Quang Ninh deep-water port

 

INFRASTRUCTURE:

Geological

 

Internal traffic

Main road

Width: 55m & 30m, Number of lanes: 4 lanes

Side branch road

Width: 17.5m, Number of lanes: 4 lanes

Electricity supply

Voltage

110/22KV

Power capacity

30MVA

Clean water

Wattage

20,000m3/day

Highest capacity

 

Waste water treatment system

Wattage

5,000m3/day

Internet and telecommunications

ADSL, Fireber & Telephone line

LEASING PRICE:

Land

Land rents

55 - 68 USD/m2

Lease term

2053

Type/Grade

Level A

Payment methods

12 months

Deposit

0.05

Minimum area

1 ha

Workshop

4 USD

Management fee

Management fee

0.2 USD/m2

Payment methods

3 months/12 months

Electricity price

Peak

0.1 USD

Normal

0.05 USD

Idle

0.03 USD

Payment methods

Monthly

Supplier

EVN

Clean water price nước

Water price

0.56 USD/m3

Payment methods

Monthly

Water supplier

Charged by Gov. suppliers

Wastewater fee

Price

0.3 USD/m3

Payment methods

Monthly

Water quality before treatment

Level B

Water quality after treatment

Level A

 

 

National One Stop Services and Investments Organization

Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.

Contact:

  1. Ms Hien Do – 0908 069 399 – hien.dt@nso.com.vn
  2. Mr Cuong Phan – 0913 855 528 – cuong.pd@nso.com.vn
  3. Ms. Truc Tran – 0396 296 580 – truc.tn@nso.com.vn

 

 

Tags