DA BAC INDUSTRIAL PARK
1. Information about the developer:
- Investor's name: Dong A Chau Duc Joint Stock Company
– Address: Da Bac Industrial Park, Da Bac commune, Chau Duc district, Ba Ria-Vung Tau
2. Information about the industrial park
– Establishment decision: 2367/QD-UBND dated August 23, 2017 of the People's Committee of BR-VT province on the establishment of Da Bac Industrial Park.
– Decision approving industrial park planning: 1059/QD-UBND of BR-VT province on approval of 1/2000 scale zoning plan of Da Bac Industrial Park, Da Bac commune, Chau Duc district, Ba Ria-Vung province Ship.
USING LAND STRUCTURE
Type of Land
|
Size (ha)
|
(%)
|
Land for construction industrial enterprises
|
204,06
|
59,17
|
Industrial Service Land
|
1,71
|
0,58
|
Land of trees, parks, lakes
|
36,58
|
12,40
|
Construction land connecting technical infrastructure
|
3,73
|
1,26
|
Other Land
|
1,33
|
0,45
|
Land for transportation
|
47,59
|
16,13
|
TOTAL
|
295
|
100
|
– Address of the industrial park: Bau Dien village, Da Bac commune, Chau Duc district, BR-VT province
– Operation period of the Industrial Park: 50 years, from May 25, 2015.
– Total investment capital: VND 1,355,000,000,000,000, of which contributed capital to implement the project is VND 271,000,000,000, accounting for 20% of total investment capital.
– Area of industrial land for lease: 204.06 ha.
- Infrastructure:
- Road N1: is the main axis of the industrial park connecting from DT 765 to the industrial park. Currently, a double road is built with a length of about 1200m, the road surface is paved with stones of 7.5m wide on each side, the median strip is 5m wide and the sidewalk is 7.5m wide
- Internal roads of industrial cluster N2, N3, D1, D2, D3, D4 have been built with stone pavement with road width from 8 to 15m.
- The industrial park is expected to have a 220KV transmission line managed by Ba Ria - Vung Tau Electricity.
- Da Bac Industrial Park is located next to DT 765 axis with 22kv transmission line. Currently, the area has only 22kv medium voltage lines and one low voltage station 22/0.4 kv - 25MVA supplying power to the 75ha construction area, no lighting system yet.
- Service and service works: Executive office building.
- Land area for sublease:193.41 ha; reach occupancy rate: 94.78%
- Land rental price: 30$ including industrial park infrastructure, management.
3. Advantages of connecting to the external transport system:
About 12km from National Highway 56; about 30km from Cai Mep port; 54km from Long Thanh - Dau Giay Expressway, 34km from Long Thanh Airport, 87km from Tan Son Nhat Airport.
4. Industries attracting investment:
Da Bac Solar Power Plant Project, Da Bac 2 Solar Power Plant Project, Da Bac 3 Solar Power Plant Project, Da Bac Solar Power Plant Project
5. Contact:
- Ms Hien Do – 0908 069 399 –hien.dt@nso.com.vn
- Mr Cuong Phan – 0913 855 528 –cuong.pd@nso.com.vn