Da Bac Industrial Park

Oct 29, 2021

DA BAC INDUSTRIAL PARK

1. Information about the developer:

- Investor's name: Dong A Chau Duc Joint Stock Company

– Address: Da Bac Industrial Park, Da Bac commune, Chau Duc district, Ba Ria-Vung Tau

2. Information about the industrial park

– Establishment decision: 2367/QD-UBND dated August 23, 2017 of the People's Committee of BR-VT province on the establishment of Da Bac Industrial Park.

– Decision approving industrial park planning: 1059/QD-UBND of BR-VT province on approval of 1/2000 scale zoning plan of Da Bac Industrial Park, Da Bac commune, Chau Duc district, Ba Ria-Vung province Ship.

USING LAND STRUCTURE

  Type of Land 

Size (ha) 

(%) 

Land for construction industrial enterprises

204,06 

59,17 

Industrial Service Land 

1,71 

0,58 

Land of trees, parks, lakes

36,58 

12,40 

Construction land connecting technical infrastructure

3,73 

1,26 

Other Land 

1,33 

0,45 

Land for transportation 

47,59 

16,13 

TOTAL

295 

100 

 

– Address of the industrial park: Bau Dien village, Da Bac commune, Chau Duc district, BR-VT province

– Operation period of the Industrial Park: 50 years, from May 25, 2015.

– Total investment capital: VND 1,355,000,000,000,000, of which contributed capital to implement the project is VND 271,000,000,000, accounting for 20% of total investment capital.

– Area of ​​industrial land for lease: 204.06 ha.

-       Infrastructure:

  • Traffic:
  • Road N1: is the main axis of the industrial park connecting from DT 765 to the industrial park. Currently, a double road is built with a length of about 1200m, the road surface is paved with stones of 7.5m wide on each side, the median strip is 5m wide and the sidewalk is 7.5m wide
  • Internal roads of industrial cluster N2, N3, D1, D2, D3, D4 have been built with stone pavement with road width from 8 to 15m.
  • Power supply:
  • The industrial park is expected to have a 220KV transmission line managed by Ba Ria - Vung Tau Electricity.
  • Da Bac Industrial Park is located next to DT 765 axis with 22kv transmission line. Currently, the area has only 22kv medium voltage lines and one low voltage station 22/0.4 kv - 25MVA supplying power to the 75ha construction area, no lighting system yet.
  • Service and service works: Executive office building.
  • Land area for sublease:193.41 ha; reach occupancy rate: 94.78%
  • Land rental price: 30$ including industrial park infrastructure, management.

3. Advantages of connecting to the external transport system:

About 12km from National Highway 56; about 30km from Cai Mep port; 54km from Long Thanh - Dau Giay Expressway, 34km from Long Thanh Airport, 87km from Tan Son Nhat Airport.

4. Industries attracting investment:

Da Bac Solar Power Plant Project, Da Bac 2 Solar Power Plant Project, Da Bac 3 Solar Power Plant Project, Da Bac Solar Power Plant Project

5. Contact: 

  1. Ms Hien Do – 0908 069 399 –hien.dt@nso.com.vn
  2. Mr Cuong Phan – 0913 855 528 –cuong.pd@nso.com.vn