Chau Duc Industrial Park

Oct 29, 2021

Location: Suoi Nghe and Nghia Thanh Ward, Chau Duc District; Song Xoai and Chau Pha Ward, Phu My Town, Ba Ria Vung Tau Province 

Total area: 1156.14 ha

Duration: until 2058

CHAU DUC INDUSTRIAL PARK

1. Information about the developer:

• Investor's name: Sonadezi Chau Duc Joint Stock Company.

• Address: 9th floor, Sonadezi Building, No. 1, Street 1, Bien Hoa 1 Industrial Park, An Binh Ward, City. Bien Hoa, Dong Nai Province.

2. Information about the industrial park:

• Decision on establishment: Decision No. 3600/QD-UBND dated October 16, 2008 of the People's Committee of Ba Ria - Vung Tau province on the establishment of Chau Duc Urban - Industrial Park.

• Decision approving industrial zone planning: Decision 2532/QD-UB dated September 30, 2019 of People's Committee of Ba Ria Vung Tau Province;

USING LAND STRUCTURE

No. 

Type of land

Size (ha) 

(%) 

I 

Industrial Land 

1.108,9 

71,26 

Land for construction of high-quality industrial and supporting industries

194,04 

  

Land for construction of factories is less polluted and clean

140,03 

  

Land for construction of multi-industry factories

774,83 

  

II 

Land for warehousing and ICD 

36,28 

2,33 

III 

Land for service Management 

1,95 

0,13 

IV 

Additional resettlement land

2,83 

0,18 

V 

Land for technical infrastructure works

16,62 

1,07 

VI 

Green building land – water surface

169,12 

10,87 

VII 

Land for transportation 

220,44 

14,17 

  

Total

1.556,14 

100 

• Address of the Industrial Park: Suoi Nghe Commune and Nghia Thanh Commune, Chau Duc District, Song Xoai Commune and Chau Pha Commune, Phu My Town, Ba Ria - Vung Tau Province.

• Operation time of the Industrial Park: 50 (fifty) years from the date the People's Committee of Ba Ria - Vung Tau province issued the Decision on establishment.

• Total investment capital: 4,890,520,000,000 VND (In words: Four thousand, eight hundred and ninety billion, five hundred and twenty million dong).

• Industrial land for lease: 1,145.18 ha.

• Infrastructure :

  • Internal road system:
  • Hot concrete road, load H30.
  • The North-South central trunk road of the area consists of 06 lanes, the width of the road surface is 2x12m, the median strip is 06m, and the road width is 54m.
  • The branch roads have 02 lanes, the width of the road is 9m-12m, the width is from 29 to 32m.

• Average load of the ground:

  • Soil layer with depth from 1 to 3.5m: 9.31 tons/m²²
  • Soil layer with depth from 3.5 to 6.5m : 16.33 tons/m²²
  • Soil layer with depth from 6.5 to 12m : 31.68 tons/m²

• Power supply system:

  • 02 110/22KV transformer stations with capacity of 2 x 63 MVA each for power supply.
  • The 22kV medium voltage line goes on 18m reinforced concrete poles along the power supply routes to the investor's fence.
  • Communication system: Due to the investment by specialized units going underground along the roads of the Industrial Park, ensuring to provide all telecommunications services as required by the Investor.

• Water supply system:

  • Chau Duc clean water supply plant has a capacity of 75,000 m³/day in phase I (in operation) and is being upgraded to 150,000 m³/day (expected to be completed in April 2020).
  • The distribution water supply pipeline goes along the roads of the Industrial Park, supplying water to the Investor's Factory as required.

• Centralized wastewater treatment plant:

According to the approved planning and EIA, Chau Duc Industrial Park has 03 wastewater treatment stations with a total capacity of 45,000 m3/day and night.

• Centralized wastewater treatment station No. 1: Capacity 7,000 m3/day.night

• Centralized wastewater treatment station No. 2: Capacity 19,000 m3/day.night

• Centralized wastewater treatment station No. 3: Capacity 19,000 m3/day.night

• Quality of treated water: Column A QCVN 40:2011/BTNMT.

The company has completed the construction of Phase 1 - Module 1 - Concentrated wastewater treatment station No. 2 with a capacity of 500 m3/day and night, which was issued by the People's Committee of Ba Ria Vung Tau province with discharge license No. 20/GP.UBND on August 11th. 2016.

Currently, the Company has completed the construction of Module 2 - Concentrated wastewater treatment station No. 2, with a capacity of 4,000 m3/day and night and is carrying out procedures for trial operation, application for discharge permits, and confirmation of completion of the work in accordance with regulations environment determination.

• Service facilities: Planned for 3 locations with a total area of ​​1.95 hectares, it is expected that the Company will deploy 01 central location in the area that has already been leased by investors during 2020.

2021 along with the deployment of Chau Duc Urban Area to provide convenient services for investors.

• Land area for sublease: 376.24ha, the occupancy rate is 34%.

• Land rental price: 1,292,500 VND/m²/until 2058, equivalent to 55 USD/m2/ to 2058 (VAT excluded and valid until March 31, 2020).

• Industrial park management fee: 11,750 VND/m²/year, equivalent to 0.5 USD/m²/year.

• Waste water treatment fee: 7,200VND/m3 (VAT not included)

• Electricity price: according to the electricity price regulations of the State of Vietnam for voltage levels from 22KV to 110KV.

• Price of water supply: according to regulations on water price announced by the People's Committee of Ba Ria - Vung Tau province.

3. Advantages of connecting to the external transport system:

Chau Duc Industrial Park has a relatively convenient location with Hoi Bai - Chau Pha - Da Bac - Phuoc Tan road connecting directly from Cai Mep deep-water port cluster to the Project and the main road of the Industrial Park connecting to the main road Highway 56 in the South.

• Road distance:

• National Highway 56 : 06 km

• National Highway 51 : 13 km

• Administrative Center : 14 km

Ba Ria Vung Tau Province

• Vung Tau City : 44 km

• Ho Chi Minh City : 75 km

Distance to the port :

• Thi Vai Port : 16 km

• Cai Mep Port : 19 km

• Go Dau Port : 21 km

Distance to the airport :

• Long Thanh International Airport : 54 km

• Tan Son Nhat International Airport : 81km

4. Main industries attracting investment:

• Assembling and manufacturing electronic components, computers and semiconductors;

• Telecommunications cables and materials;

• Pharmaceuticals, medical equipment;

• Precision mechanics, manufacturing air conditioners, washing machines;

• Electrical equipment;

• Automotive accessories, automobile manufacturing and assembly;

• New materials and nanotechnology manufacturing industries;

• Processing and processing industries of gold, silver, precious stones, diamonds and precious metals...

• Mechanical processing, steel structures;

• Assembling bicycles, motorbikes, cars, specialized means of transport;

• Processing agricultural products, agro-pharmaceuticals, food and beverages;

• Producing building materials and components for the construction industry;

• High fashion apparel, leather shoes, textiles.

• Manufacture of safety protection equipment;

• Pharmaceuticals, medical equipment;

• Producing plastic products, accessories, household appliances;

• Wood processing and high-class furniture.

• Cosmetic production

• Producing solar batteries, electric energy                 

• Logistics services, warehousing, bonded warehouse, cold storage, bulk cargo collection, containers inside and outside the ICD.