Chan May - Lang Co Industrial Park

Oct 29, 2021

Chan May - Lang Co EZ

Investor: Sai Gon – Hue Investment Corporation

Phu Loc District, Thua Thien Hue Province

Area: 27,108ha

 

 

1

Name of economic zones, industrial zones, hi-tech parks

Chan May – Lang Co EZ

2

Location

Phu Loc District, Thua Thien Hue Province

3

Map

upload/7731/20140115/ThuaThienHue.ChanMayLangCo.jpg

4

Scale, land area

4.1

Planned land area

27,108ha

4.2

Actual land area

 

+ Leased area

1,607 ha.

 

+ Availble area

8,373ha.

4.3

Number of enterprises, projects on operating

 

+ Domestic enterprises

Domestic projects: 37, total registered capital: VND 23,778 billion

 

+ FDI enterprises

10, total registered capital: VND 55,378 billion

 

+ Career, major active field

 

5

Geological advantages

5.1

Traffic connection

Chan May - Lang Co economic zone owns a position which considered the most convenient facing the East Sea of ​​the East-West economic corridor. The economic zone is at the heart of two economic centers and two high-quality human resource training centers in Vietnam - Danang city and Hue city. It is also located in the center of two major international airports (Danang Int’l airport and Phu Bai Int’l airport). The transportation system is very convenient and it is very easy to move from here to neighboring countries and all regions of Vietnam.

With the middle position of the country, Chan May - Lang Co economic zone is the intersection of Vietnamese and Champa cultures; Hue ancient capital is the cultural and historical center of Vietnam through the ages. Within a radius of 200 km of "Central Heritage Road", you can experience and fully enjoy the value of 5 world heritages and thousands of historical cultural relics and ancient architectural works. Lang Co beach, Da Nang beach and Hoi An beach are chain of world-recognized beautiful beaches and the truly paradise resorts for domestic and international tourists.

5.2

Infrastructure

 

5.3

Other

 

6

Operation term

Up to 70 years from 2006

7

Technical infrastructure

7.1

Power supply system

Power supply system: The power supply for the economic zone is the grid power system from the 500/220/110KV Da Nang power station. Currently, 03 110/22kV substations have been completed with a total capacity of 75 MVA and a distribution network, which is enough to supply electricity for production and daily life in Chan May and Lang Co areas.

7.2

Water supply and drainage system

8,000m3/day

The next stage is to invest in the construction of Loc Thuy Water Supply Plant with a capacity of 110,000 m3/day.

7.3

Wastewater, waste treatment system

Waste water and waste treatment system: There is a Lang Co wastewater treatment plant with a capacity of 5,000 m3/day and a solid waste treatment plant with an area of 30 hectares in the east of Phuoc Tuong pass.

 

Currently, the Management Board of Economic and Industrial Zones is implementing phase 1 of the project No. 2 Wastewater Treatment Plant in Industrial Park and Non-Tariff Zone with a capacity of 4,900 m3/day for water treatment. waste for projects in industrial zones and non-tariff zones.

7.4

Telecommunication, internet

Switching system: Chan May area is currently using 2 Host-ERICSSON switchboards with 06 satellites. Total installed capacity 9216 Lines; Usage: 6605 Lines. Upgrading 2 switchboards to ALCATEL 1000E10MM with multimedia and multi-service capabilities.

 

About Transmission: The trunk lines between the switchboards are optical cables forming a ring circuit, meeting the expansion of services such as cable television, broadband internet, Videophone...etc.

7.5

Fire prevention and fighting

Before being put into use, the system of ready-built factories of infrastructure investors and construction works of investors must be approved by competent authorities.

7.6

Investment situation, finishing infrastructure

. Internal traffic: The main traffic routes have been completed according to the general planning, detailed planning, more than 100 km of roads have been completed, meeting the traffic demand within the economic zone and the ability to connect with Highway 1A and connecting to the area through Chan May port

- Road and railway: There is National Highway 1A, North-South railway passing through the economic zone

  - Waterway (sea, river): There is Chan May deep-water port.

  - By air: about 45 km from Phu Bai international airport and about 35 km from Da Nang airport.

Technical infrastructure: It is planned and developed completely, synchronously and modernly.

Regarding social infrastructure: Infrastructure works such as hospitals, resettlement areas, tourist areas, hotels, restaurants, banks, post offices, markets and supermarkets have been built to meet the needs of social infrastructure. of workers and investors.

8

Human resources

8.1

Laborers in locality

Local labors: 3,300

+ Post graduate: 80

+ Universities and colleges: 860

+ Intermediate, vocational training: 1,325

+ Technical worker: 207

+ Unskilled labor: 828

+ Rate of trained workers: 75%

8.2

Laborers from neighboring areas

Labors in surrounding areas:

- Phu Loc province: 66,227

- Phu Vang province: 77,497

- Nam Dong province: 13,733

- Huong Thuy town: 46,869

8.3

Major training fields

tourism services

9

Social infrastructure

 

10

Support service

 

11

Investment attracting sectors

11.1

Preferential sectors:

Encouraged sectors:

+ Projects on infrastructure of industrial zone, seaport services, port infrastructure, high-tech industry

11.2

Other sectors:

tourism

12

Land rental, workshop and infrastructure use expenses

12.1

Land rental price

- Land with infrastructure investment: 22-30 USD/43 years. (Applicable at Saigon Chan May Industrial Park).

- Raw land without infrastructure investment: from 0.02-0.2 USD/m2/year.

  (Price depends on function area)

12.2

Workshop rental price

+ Factory rental price: 2.2 -2.5 USD/m2/month.

+ Office rent: 2.8 - 3.2 USD/m2/month.

12.3

Infrastructure use expense

0.4 USD/m2/year.

12.4

Payment method

Cash or bank transfer.

13

Construction price

13.1

Office

 

13.2

Standard workshop

 

13.3

Other

 

14

Investment costs

14.1

Power price

+ For production: VND 914 - 2,908/ kwh

+ For trade- services provision: VND 1,538 - 4,004/ kwh

+ For daily activities: VND 1,678 - 2,927/ kwh

14.2

Water price

+ For production: VND 11,081/ m3

+ For trade- services provision: VND 15,610/ m3

+ For daily activities: VND 9,489 / m3

14.3

Gas and coal price

+ Gas price: VND 300,000 - 450,000 (depending on the time)

+ Coal price: USD 74.1/ ton (depending on the time)

14.4

House, apartment rental price for foreigners

): VND 4 - 8 million

14.5

Labor cost

 

+ Management and Technical workers

+ Technical workers pay rate: VND 6,000,000 - 8,000,000/ month

+ Manager pay rate: VND 8,000,000 - 20,000,000/ month

 

+ Worker and unskilled worker

+ Minimum wage: VND 3,430,000 / month

+ Unskilled labor: VND 4,000,000 - 6,000,000/ month

 

+ Insurance

+ Overtime pay rate: VND 2,000,000 - 5,000,000/ month

+ Social insurance, health insurance: 21.5% of salary (paid by enterprises)

14.6

Transportation cost

 

14.7

(Wastewater) waste treatment expenses

VND 6,257 / m3

14.8

Environmental protection fees

VND 2,000 - 8,000/ m3 / ton

14.9

Customs expense

 

14.10

Other expenses and fees

 

15

Contact

National One Stop Services and Investments Organization

Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.

Contact:

  1. Ms Hien Do – 0908 069 399 – hien.dt@nso.com.vn
  2. Mr Cuong Phan – 0913 855 528 – cuong.pd@nso.com.vn