1
|
Name of economic zones, industrial zones, hi-tech parks
|
Cha La Industrial Park
|
2
|
Location
|
Binh Linh Hamlet, Cha La Commune, Duong Minh Chau District, Tay Ninh Province.
|
3
|
Description
|
After expanding the scale from an industrial cluster (CCN) to an industrial park (IZ), Tay Ninh province orients to develop Cha La Industrial Park into 2 phases. Phase 1 deploys an area of nearly 60 hectares that was previously planned as a CCN. Phase 2 continues to deploy an area of 140 hectares to further expand into an industrial zone. According to the detailed planning, out of a total area of nearly 60 hectares in phase 1 of Cha La Industrial Park, the industrial development land area accounts for about 32 hectares. The remaining land area is used for construction of transport infrastructure and systems serving activities in the industrial park.
|
4
|
Scale, land area
|
4.1
|
Planning area
|
Planned land area: 200 ha
+ Phrase 1: 42.19 ha, The area with completed infrastructure can be rented: 32.28 ha
|
4.2
|
Actual land area
|
|
+ Leased area
|
20.35 ha
|
|
+ Availble area
|
|
4.3
|
Number of enterprises, projects on operating
|
|
+ Domestic enterprises
|
Number of businesses and projects in operation:
02 investment projects with total registered capital of 23 million USD).
|
|
+ FDI enterprises
|
|
|
+ Career, major active field
|
|
5
|
Geological advantages
|
5.1
|
Traffic connection
|
Provincial road 782, Cha La commune, Duong Minh Chau district, Tay Ninh province.
+ 85 km from HCMC
+ 83 km from Tan Son Nhat Airport
+ 11 km from Tay Ninh City
+ 34 km from Moc Bai International Board Gate
+ 40 km from Xa Mat International Board Gate
|
5.2
|
Infrastructure
|
|
5.3
|
Others
|
|
6
|
Operation term
|
|
7
|
Technical infrastructure
|
7.1
|
Power supply system
|
Using the national grid
|
7.2
|
Water supply and drainage system
|
Built a water supply plant with capacity: 1,000 m3/day and night
|
7.3
|
Wastewater, waste treatment system
|
|
7.4
|
Telecommunication, internet
|
Wired and wireless telephone networks
|
7.5
|
Fire prevention and fighting
|
|
7.6
|
Investment situation, finishing infrastructure
|
Road: The Southwest has road 784; associated with Hoa Thanh town, Tay Ninh city and convenient seaports and airports.
|
8
|
Human resources
|
8.1
|
Laborers in locality
|
|
8.2
|
Laborers from neighboring areas
|
|
8.3
|
Major training fields
|
|
9
|
Social infrastructure
|
Planning to have a residential area - services for industry and resettlement on a scale of 70 hectares
|
10
|
Support service
|
Housing for workers: Planning to have a residential - service area serving industry and resettlement on a scale of 70 hectares.
|
11
|
Investment attracting sectors
|
11.1
|
Preferential sectors
|
Multi-industry, priority given to high technology, precision mechanics, electronics.
|
11.2
|
Other sectors
|
|
12
|
Land rental, workshop and infrastructure use expenses
|
12.1
|
Land rental price
|
|
12.2
|
Factory rental price
|
|
12.3
|
Infrastructure usage fee
|
|
12.4
|
Payment methods
|
|
13
|
Construction price
|
13.1
|
Office
|
|
13.2
|
Standard factory
|
|
13.3
|
Other category
|
|
14
|
Investment cost
|
14.1
|
Electricity price
|
|
14.2
|
Water price
|
|
14.3
|
Gas prices and coal prices
|
|
14.4
|
Rental price of houses and apartments for foreigners
|
|
14.5
|
Labor cost
|
|
+ Labor management and engineering
|
|
|
+ Workers and unskilled workers
|
|
|
+ Insurrance
|
|
14.6
|
Transport costs
|
|
14.7
|
Cost of waste (water) treatment
|
|
14.8
|
Environmental protection fee
|
|
14.9
|
Customs fees
|
|
14.10
|
Other costs and fees
|
|
15
|
Contact
|
National One Stop Services and Investments Organization
Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.
- Ms Hien Do – 0908 069 399 –hien.dt@nso.com.vn
- Mr Cuong Phan – 0913 855 528 –cuong.pd@nso.com.vn
- Ms. Truc Tran – 0396 296 580 –truc.tn@nso.com.vn
|