Cai Lan Industrial Park

Oct 29, 2021

CAI LAN INDUSTRIAL PARK

Investor: Quang Ninh Cement and Construction Joint Stock Company

Location: Gieng Day and Bai Chay wards, Ha Long city, Quang Ninh province

Area:  78 hectares

1

General information

 

- Location: Gieng Day and Bai Chay wards, Ha Long city, Quang Ninh province.

- Area: 78 hectares

- Investor: Quang Ninh Cement and Construction Joint Stock Company

 

As a key industrial park of Ha Long city in particular and Quang Ninh province in general with a synchronous technical and social infrastructure system: Standardized centralized wastewater treatment system, negotiate environmental requirements; the electricity and water supply system meets the needs of enterprises in the industrial park; the system of internal roads of the industrial park, the system of architectural landscapes, trees, works and houses for workers are invested in a methodical and quality manner along with professional infrastructure services; create a good, convenient and attractive environment for investors operating in the IZ, ensuring that it is consistent with the guiding ideology, development orientation of the province, orientation in the master plan for socio-economic development Provincial Association, provincial construction planning and planning on development of industrial zones and economic zones.

 

2

Location and Regional Planning

 

. Location and regional relations

- Distance from Hanoi city center: About 150 km

- By road: Located on National Highway 18 from Hanoi to Mong Cai International Border Gate. About 10 km from the intersection of Ha Long - Hai Phong Expressway.

- Seaport: Adjacent to Cai Lan port (Ha Long, Quang Ninh); About 35 km from Dinh Vu port (Hai Phong city)

- Airport: About 140km from Noi Bai airport (Hanoi); About 40 km from Cat Bi airport (Hai Phong); About 50 km from Van Don International Airport (Quang Ninh)

- Railway: There is Cai Lan station and Yen Vien railway line (Hanoi - Pha Lai - Ha Long - Cai Lan)

 

3

- Internal traffic:

 

The traffic system is designed according to a checkerboard-shaped network. Arrange traffic network suitable to the scale of each area to ensure convenient connectivity between zones and between roads and waterways.

 

4

- Power source:

 

High voltage power supply is taken from the existing 110 KV line; From the intermediate substation, electricity is sent to distribution substations to supply electricity to areas in the industrial park. The low-voltage cable system is routed from the substation low-voltage cabinets to the technology trenches to the distribution cabinets in the workshop and to the distribution cabinets in the production areas.

 

5

- Water source:

 

Taken from the water supply for the western area of ​​Ha Long.

 

6

- Drainage system, wastewater and waste treatment system:

 

Planning for a rainwater drainage system independent of the wastewater system; Arrange 02 centralized wastewater treatment stations with a total capacity of 22,000 m3/day to collect and treat wastewater in the whole area. Waste water after being treated meets prescribed standards and standards before being discharged into the environment; Domestic solid waste (CTR) is collected and classified at source into inorganic and organic solid waste, both types are now placed in separate bags. Inorganic solid waste is periodically collected and fully utilized for recycling. Organic solid waste is collected daily and treated at the city's general solid waste treatment area. Industrial solid waste is classified, collected and treated up to standards before being buried according to regulations.

 

7

National One Stop Services and Investments Organization

Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.

Contact:

  1. Ms Hien Do – 0908 069 399 – hien.dt@nso.com.vn
  2. Mr Cuong Phan – 0913 855 528 – cuong.pd@nso.com.vn