Binh Xuyen 2 Industrial Park

Jul 14, 2021

Binh Xuyen 2 Industrial Park

Investor:

• Phase 1: Fu Chuan Co., Ltd

• Phase 2:

Location: Belonging to Binh Xuyen district, Vinh Phuc province

Area:

• Phase 1: 42.21ha

• Phase 2: 137.79ha

1

 

 Binh Xuyen 2 Industrial Park – (phase 1)

– Scale: 42.21 hectares

+ Area of ​​industrial land as planned: 31.65 hectares

+ Area of ​​industrial land according to the plan cleared: 31.65 ha

+ The occupancy rate on the planned land area: 72%

+ The rate of occupancy on the planned land area cleared: 72%

– Location of industrial park: Belonging to Binh Xuyen district, 2km from Noi Bai-Lao Cai highway, 20km from Noi Bai International Airport, 50km from Hanoi Capital Center, 165km from Cai Lan port (Quang Ninh) kilometer; 4 km from Railway Station

– Technical infrastructure of the industrial zone (electricity, water, traffic, wastewater, …): 110/35/22 kV power station with a capacity of 126 MVA, with convenient roads, Song Lo clean water plant with a capacity of 100,000 m3 day and night, separate rainwater drainage and wastewater treatment system

– Support services (financial, banking, customs, transportation, …): convenient financial, banking, and customs services

- Investment cost:

+ Land rental price: 90-100 USD/m 2

+ Industrial park management fee: 0.4 USD/m 2 /year

+ Waste water treatment fee: 0.5 USD/m³

+ Factory rental price: 5 USD/m/month

+ Workshops for rent with modules: 1000 m² to 5000 m²

– Number of projects registered for investment: 02 projects

– Registered capital: 218 million USD

– Project group/field calling for investment: Manufacture of electronic components, office equipment, mobile phones, software, training…

 

 

2

 

Binh Xuyen 2 Industrial Park – (Phase 2)

– Scale: 137.79 ha

+ Area of ​​industrial land as planned: 82.67 ha

– Location of industrial park: Belonging to Binh Xuyen district, 2km from Noi Bai-Lao Cai highway, 20km from Noi Bai International Airport, 50km from Hanoi Capital Center, 165km from Cai Lan port (Quang Ninh) kilometer; 4 km from Railway Station

– Technical infrastructure of the industrial zone (electricity, water, traffic, wastewater, …): 110/35/22 kV power station with a capacity of 126 MVA, with convenient roads, Song Lo clean water plant with a capacity of 100,000 m3 day and night, separate rainwater drainage and wastewater treatment system

– Support services (financial, banking, customs, transportation, …): convenient financial, banking, and customs services

 

3

 

National One Stop Services and Investments Organization

Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.

  1. Ms Hien Do – 0908 069 399 – hien.dt@nso.com.vn
  2. Mr Cuong Phan – 0913 855 528 – cuong.pd@nso.com.vn
  3. Ms. Truc Tran – 0396 296 580 – truc.tn@nso.com.vn

 