Power supply system: The power supply to the industrial park is taken from 110/35/22KV substation. High voltage electricity network is provided along the internal traffic in the industrial park.
Water supply system: Clean water is supplied with a capacity of 30,000 m3 per day from the clean water plant. Water is supplied to the factory fence by an international standard water supply pipe system.
Waste water and waste treatment system: Waste water is collected to the wastewater plant of the industrial park to meet water standard A (QCVN 40:2011/BTNMT) before being discharged to the general system of the industrial park. The wastewater plant was built with a treatment capacity of 2,900m3/day – night
Waste is contracted by factories in the industrial park to classify, collect and transport garbage out of the industrial park to avoid environmental pollution.
Exhaust gases of factories are installed with national standard filtration systems before being discharged into the natural environment
Communication system: the industrial park is installed with an underground communication cable system and is provided to the fence of the factory by an international standard cable system.
Through the connection system between the communication center of the industrial park through the post and telecommunications network, all communication needs are guaranteed and are capable of providing all necessary services such as: Private switchboard , international telephone, teleconference, leased line, high speed internet, email, etc.
Fire prevention and fighting system: the industrial park is installed with a warning, prevention and fire fighting system in strict compliance with national regulations.
Fire hydrants are installed at the internal traffic hubs, and at all factories to ensure effective protection of the whole area from fire and explosion incidents.
|