Binh Minh Industrial Park

Jul 22, 2021

Binh Minh Industrial Park

Investor: HOANG QUAN MEKONG REAL ESTATE TV-TM-DV JSC 

Location: My Hoa commune, Binh Minh town, Vinh Long province.

Area: 134.82 ha

1

2. Information about Binh Minh Industrial Park:

2.1. Location:

- Location in the province: My Hoa commune, Binh Minh town, Vinh Long province.

- Location in the region/area: far from the city. Can Tho 05km, far from city. Vinh Long 30km, far from city. Ho Chi Minh City 160km.

- Adjacent to National Highway 1A, Hau River, Can Tho Bridge and the road leading to Can Tho Bridge.

- Distance to the airport: 15 km from Can Tho Airport.

- Distance from Vinh Long Customs: 30 km.

- Distance to the nearest harbour:

+ Binh Minh port within Binh Minh industrial zone: receive ships with a tonnage of up to 10,000 tons.

+ Vinh Long port: 30 km, receiving ships with a tonnage of up to 5,000 tons.

+ Can Tho port: 16 km, receiving ships with a tonnage of up to 20,000 tons.

- Distance from highway: about 80 km.

 

2

2.2. Industry attracting investment:  Processing agricultural products, aquatic products; manufacturing consumer goods textiles, wood, handicrafts, electricity, packaging; production of building materials, ceramic tiles, roofing sheets; cosmetic chemical production; manufacture and install machinery and equipment for industrial and agricultural production,...

 

3

2.3. Industrial land area:  134.82 ha, of which industrial land can be leased is 92.9 ha.

2.3. Lease period:  up to 50 years (coming from 2006 to 2056)

 

4

2.4. Land rents:

* Land rent:  80-100USD/m 2 (depending on location) including VAT.

* Factory rental price:  2.2 – 2.3 USD/m 2 /month.

 * Other costs:

            - Maintenance fee for industrial park infrastructure: 0.2 USD/m 2 /year.

            - Management fee: 0.1 USD/m 2 /year.

            - Waste water treatment fee: 0.3 USD/m 3 .

 

5

2.5. Power supply:  supplied from the national grid system, directly supplied by Vinh Long Power Company.

2.6 Water supply:  provided by water supply factory in Binh Minh Industrial Park.

2.7 Wastewater treatment plant:  capacity of 5,000 m3/day, of which: phase 1 is in operation with a capacity of 2,200 m3/day.

2.8. Housing for workers, experts:  under construction.

 

6

National One Stop Services and Investments Organization

Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.

  1. Ms Hien Do – 0908 069 399 – hien.dt@nso.com.vn
  2. Mr Cuong Phan – 0913 855 528 – cuong.pd@nso.com.vn
  3. Ms. Truc Tran – 0396 296 580 – truc.tn@nso.com.vn

 

Tags