Bim Son B Industrial Park

Oct 02, 2021

Bim Son B Industrial Park - Thanh Hoa

• Investor: HUD4 Investment and Construction Joint Stock Company

• Operating time: 2010

• Address: Km 289 National Highway 1A, Bim Son town- Thanh Hoa province, Vietnam.

• Total area: 258ha

1

BIM SON B INDUSTRIAL PARK

 

           ■ Location: Located in the north of Thanh Hoa province, next to National Highway 1A; 35 km from Thanh Hoa city center, 120 km south of Hanoi capital; 150 km from Hai Phong Port, with North - South railway running through.

 

           ■ Scale: Area of 566 ha, of which:

 

           - Area A: 308 ha, invested by Fuhucorp Joint Stock Company and VID Thanh Hoa Investment and Development Joint Stock Company.

 

           - Area B: 258 ha, invested by HUD 4 Construction and Investment Joint Stock Company as an infrastructure investor.

 

2

Bim Son B Industrial Park was approved by the decision No. 4738/QD-UBND dated December 31, 2009 by the People's Committee of Thanh Hoa Province approving the detailed planning of Bim Son industrial park along with the investment certificate No. 26221000040 issued on 24/24. 09/2008, adjusted on June 25, 2010

 

3

location of Bim Son B industrial park:

Bim Son B Industrial Park is located along National Highway 1A, bordering between Thanh Hoa Province and Ninh Binh Province, convenient for import and export and normal delivery with key economic regions such as Hanoi, Hai Phong, and Quang Ninh. Ning.

-  40km from Thanh Hoa city, 110km from Hanoi

-  40 km from Thanh Hoa airport (planned), 140 km from Noi Bai international airport

-  Near Bim Son station - on the North-South railway axis

-  Hai Phong Port 100 Km

-  95 Km from Nghi Son deep water port

Infrastructure of Bim Son B industrial park:

 

4

 

Technical infrastructure system

- Land conditions:

Ensure to provide enterprises with clean land that has been leveled synchronously with a convenient infrastructure system for enterprises to invest in and build factories. 

- Transportation System

The system of internal roads is designed synchronously and modernly to serve the transportation of vehicles to each land lot easily and conveniently. The central road system is 32.5m wide; The branch road is 26.5m wide. Lighting system installed along the roads.

 

- Electricity

Power is supplied continuously and stably from a 110KV high voltage line passing through the fence of Bim Son Industrial Park. The medium voltage power network is invested in a modern and synchronous manner, running along the traffic routes to supply electricity to the fences of businesses. Enterprises self-invest and build low-voltage stations depending on the consumption capacity.

 

- Water

Water is supplied stably from the water supply plant with a capacity of 7,000 m3/day. The water supply system is connected to the bottom of the fence of each enterprise.

 

- Wastewater treatment

All industrial wastewater and domestic wastewater are treated by the Enterprise to the minimum standard of water level C before being discharged into the common wastewater system of the industrial park. After that, the industrial park will continue to meet the standards prescribed by the Government of Vietnam.

 

- Process rubbish

Solid waste from factories in the IZ will be classified, collected and transported to the centralized treatment yard of Bim Son town.

- System of fire

Thanh Hoa has about 14 colleges and many vocational schools

-Communications

The telecommunications system meets international standards and is always ready to meet the communication needs with the fastest and most effective goals. Underground fiber optic cable system is directly connected to the foot of the fence of each enterprise.

- Other information

+ The office of Thanh Hoa Customs is located in the Industrial Park, the procedures are carried out quickly at the units in the Industrial Park.

+ Fire prevention and fighting: The industrial park is installed with a fire prevention and fighting system in strict compliance with national regulations. Fire-fighting water supply throats are installed at internal roads in the industrial park with a distance of 150m/1 throat to ensure the most effective effect in fire protection for the entire industrial park.

Environment and trees: The system of trees is about 30.5 ha, accounting for 11.8% of the whole IP area, a combination of concentrated green trees and trees along the roads to create the general landscape of the IP. 

 

Investment cost and land sublease price:

-  Price for sub-lease of land with infrastructure: 35-60 USD/1m2/50 years.

-  Industrial park management and service fee: About 0.3 USD/1m2/year 

Land rent: 

- According to regulations of Thanh Hoa Provincial People's Committee.

- Exemption from land rent for 3-4 years of investment project implementation.

- Waste water treatment fee: According to the regulations of the wastewater treatment unit – Pay monthly and at the beginning of each month. The volume of wastewater is determined by 80% of the input water or calculated according to the wastewater meter. 

- Electricity price: According to the unit price of the electricity industry.

- Price of clean water: According to regulations of clean water supplier. Pay monthly and at the beginning of each month.

 

5

For more information, please contact

National One Stop Services and Investments Organization

Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.

Please contact:

  1. Ms Hien Do – 0908 069 399 – hien.dt@nso.com.vn
  2. Mr Cuong Phan – 0913 855 528 – cuong.pd@nso.com.vn
  3. Ms. Truc Tran – 0396 296 580 – truc.tn@nso.com.vn

 

 

 

Tags