Bau Bang Industrial Park

Oct 27, 2021

BAU BANG INDUSTRIAL PARK

1

Economic zone, Industrial Park, High Tech Park

BAU BANG INDUSTRIAL PARK

 

2

Location

Lai Uyên town, Bến Cát district, Bình Dương province

3

Map

Bau Bang Industrial Park is also located in the southern key economic quadrangle area (Ho Chi Minh City, Binh Duong, Ba Ria-Vung Tau and Dong Nai), 60 Km from Ho Chi Minh City and Thu city. Dau Mot 30 Km to the North.

4

Scale, land area

4.1

Planning area

Industrial land for lease: 699.24 ha.

4.2

Actual area

 

+ Occupied

Land area for sublease: 12

 

+ Available

 

4.3

Number of businesses and projects in operation

 

+ Domestic business

 

 

+ FDI business

Currently, Bau Bang Industrial Park has 100% tenants, mainly from the US, Japan, Taiwan, Italy and China. Among them, there are prestigious international enterprises such as Kisswire, Hotta VN, Sun Wood Vina, Suk Mono...

 

+ Main operating industries

Electrical industry, industrial electricity and household appliances;

- Electronic industry, informatics, information communication and telecommunications;

- Food processing industry, food and agro-forestry products;

 - Manufacturing industry of machines, automobiles, equipment and spare parts;

 - Mechanical and precision mechanics with plating;

 - Industry of ceramics, glass, crystal;

- Industrial production of industrial gases;

- Steel manufacturing industry of all kinds;

- Manufacture of medical and optical instruments; - Manufacture of sports equipment and children's toys; - Fiber, textile and garment industry;

 - Industry of imitation leather, leather shoes (not tanning fresh leather);

- Manufacturing industry of pharmaceuticals, cosmetics, agro-pharmaceuticals, veterinary drugs; - Plastic, tire and rubber industry (not processing fresh rubber latex);    

- Industry of wood production, interior decoration, building materials; - Packaging processing, printing, paper industry (not producing pulp from bamboo pictures, cork leaves, planted forests);

5

Advantage of location

5.1

Transpotation connection

  • Bau Bang Industrial Park is also connected with Ho Chi Minh Road, Ring Road 4, My Phuoc Tan Van Expressway, DC Road connecting Minh Hung Chon Thanh Industrial Park.
  • Currently, the extended My Phuoc - Tan Van route (My Phuoc - Bau Bang) shortens the time to Ho Chi Minh City and Long Thanh and Binh Duong International Airports, investing in urban railways and promising fast bus routes. will be the highlight to promote Bau Bang further development.
  • Expected METRO RANGE running overhead from Thu Dau Mot New City - My Phuoc - Bau Bang - Long Nguyen. Connecting the new urban center with the center of South Ben Cat far from Long Thanh International Airport (35 km), far from the center of Ho Chi Minh City (90 minutes by car), 60km from Tan Cang, Saigon port cluster, VICT, ICD Phuoc Long. 62 km from Tan San Nhat International Airport.

5.2

Infrastructure

Internal roads: the entire internal road system is 25m wide (15m wide asphalt surface and 5m wide on each side of the corridor) with load-bearing capacity up to 40-60 tons/1 truck.

5.3

Others

 

6

Land use term

2057

7

Technical infrastructure

7.1

Electricial System

 

7.2

Water supply and drainage system

 

7.3

Wastewater and waste treatment system

Wastewater treatment plant (treatment from type B to A) with a large capacity, ensuring receipt and treatment up to the prescribed standards before being discharged into the environment. Centralized wastewater treatment plant: Capacity 4,000 m3/day.

7.4

Telecommunications system, internet

 

7.5

Fire protection and fighting system

 

7.6

Status of investment, completion of infrastructure

 

8

Human Resources

8.1

Local labor

 

8.2

Labor in the vicinity

 

8.3

Training for main occupations

 

9

Social Infrastructure

 

10

Additional Services

  •  Center for support and advice on labor: located in the industrial park to assist investors in recruiting and consulting on labor policies; promote labor recruitment programs, introduce jobs and create favorable conditions to support workers in industrial parks.
  • Commercial and Service Area: providing support services such as housing for experts, banks, delivery services, canteens for workers, medical care services, amusement parks mind,….
  • Services to support investment project implementation procedures free of charge: consulting and supporting investors in preparing procedures and applying for investment certificates and procedures after investment certificate

 

11

Attracted investment fields

11.1

Priority areas

Electrical industry, industrial electricity and household appliances;

- Electronic industry, informatics, information communication and telecommunications;

- Food processing industry, food and agro-forestry products;

- Manufacturing industry of machines, automobiles, equipment and spare parts;

- Mechanical and precision mechanics with plating;

- Industry of ceramics, glass, crystal;

- Industrial production of industrial gases;

- Steel manufacturing industry of all kinds;

- Manufacture of medical and optical instruments;

- Manufacture of sports equipment and children's toys;

- Fiber, textile and garment industry;

- Industry of imitation leather, leather shoes (not tanning fresh leather);

- Manufacturing industry of pharmaceuticals, cosmetics, agro-pharmaceuticals, veterinary drugs;

- Plastic, tire and rubber industry (not processing fresh rubber latex);

- Industry of wood production, interior decoration, building materials;

- Packaging processing, printing, paper industry (not producing pulp from bamboo pictures, cork leaves, planted forests);

11.2

Other fields

 

12

Land for lease, factory and infrastructure use fee

12.1

Rental of land for lease

 

12.2

Rental of factory for lease

 

12.3

Infrastructure usage fee

 

12.4

Payment methods

 

13

Construction price

13.1

Office

 

13.2

Standard factory

 

13.3

Other items

 

14

Investment Expeneses

14.1

Electricity price

 

14.2

Water price

 

14.3

Gas and coal price

 

14.4

Apartment and department rental price for foreigners

 

14.5

Labor cost:

 

+ Labor management and engineering

 

 

+ Workers and unskilled workers

 

 

+ Insurance

 

14.6

Transportation costs

 

14.7

Cost of waste (water) treatment

 

14.8

Environmental protection fee

 

14.9

customs fees

 

14.10

Other costs and fees

 

15

Contact point

  1. Ms Hien Do – 0908 069 399 –hien.dt@nso.com.vn
  2. Mr Cuong Phan – 0913 855 528 –cuong.pd@nso.com.vn