1
|
Name of economic zones, industrial zones, hi-tech parks
|
Bac Thuong Tin Industrial Zone (HSDC)
|
2
|
Location
|
- Ha Hoi Commune, Thuong Tin District, Hanoi
|
3
|
Map
|
|
4
|
Scale, land area
|
4.1
|
Planned land area
|
430ha
|
4.2
|
Actual land area
|
|
+ Leased area
|
|
|
+ Availble area
|
|
4.3
|
Number of enterprises, projects on operating
|
|
+ Domestic enterprises
|
|
|
+ FDI enterprises
|
1 projects with total registered capital 90 billion USD, 100% foreign capital (Korea) by Vietnam HS Building and Developing Vietnam HS Co., Ltd
|
|
+ Career, major active field
|
|
5
|
Geological advantages
|
5.1
|
Traffic connection
|
- 16km from the Center of Hanoi City in the South, was built according to an including international standards industrial park, but not limited to secondary investors from South Korea, the US, Japan ... There are convenient traffic conditions in both road and rail to create advantages for economic development – social
- Located at the intersection of highway junction 1A and provincial road 71.
- 125km from Hai Phong habor, 135km from Cai Lan habor
- 50km from Noi Bai Airport
1km from Thuong Tin Station, 25km from Hanoi station
|
5.2
|
Infrastructure
|
Transportation: 30m wide main road system, 2 lanes; Transportation system internal shaft 15m wide, 1 lane
|
5.3
|
Other
|
|
6
|
Operation term
|
2007-2057
|
7
|
Technical infrastructure
|
7.1
|
Power supply system
|
110kV National electricity network electricity -
|
7.2
|
Water supply and drainage system
|
The water supply system a capacity of 5,000 m3 / day
|
7.3
|
Wastewater, waste treatment system
|
Waste management: Waste is collected, assembled and transported to the processing site as prescribed
Wastewater treatment: Wastewater is collected and processed according to standards before being discharged into the environment
|
7.4
|
Telecommunication, internet
|
The system ensures communication contacts domestically and internationally easily include telephone, mobile phone, fax, Internet ...
|
7.5
|
Fire prevention and fighting
|
|
7.6
|
Investment situation, finishing infrastructure
|
25% occupancy rate
|
8
|
Human resources
|
8.1
|
Laborers in locality
|
|
8.2
|
Laborers from neighboring areas
|
|
8.3
|
Major training fields
|
|
9
|
Social infrastructure
|
Finance: There are many bank branches near the industrial park.
Training School: Hanoi Focus a lot Universities and Colleges as well as Vocational Training multidisciplinary, multisectoral.
Housing for workers, experts and managers
|
10
|
Support service
|
|
11
|
Investment attracting sectors
|
11.1
|
Preferential sectors:
|
Mechanical industry, electronic industry, precision Industry, Light Industry, Information Technology
|
11.2
|
Other sectors:
|
|
12
|
Land rental, workshop and infrastructure use expenses
|
12.1
|
Land rental price
|
150 USD / m2
|
12.2
|
Workshop rental price
|
4USD/m2/month
|
12.3
|
Infrastructure use expense
|
0,2 USD/m2/year
|
12.4
|
Payment method
|
|
13
|
Construction price
|
13.1
|
Office
|
|
13.2
|
Standard workshop
|
|
13.3
|
Other
|
|
14
|
Investment costs
|
14.1
|
Power price
|
According to the price of the EVN
|
14.2
|
Water price
|
|
14.3
|
Gas and coal price
|
|
14.4
|
House, apartment rental price for foreigners
|
|
14.5
|
Labor cost
|
|
+ Management and Technical workers
|
100-450 USD / person / month
|
|
+ Worker and unskilled worker
|
|
|
+ Insurance
|
|
14.6
|
Transportation cost
|
|
14.7
|
(Wastewater) waste treatment expenses
|
Under the provisions of the PPC and the Management Board of Industrial Zones
|
14.8
|
Environmental protection fees
|
|
14.9
|
Customs expense
|
|
14.10
|
Other expenses and fees
|
|
15
|
Contact
|
National One Stop Services and Investments Organization
Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.
- Ms Hien Do – 0908 069 399 – hien.dt@nso.com.vn
- Mr Cuong Phan – 0913 855 528 – cuong.pd@nso.com.vn
- Ms. Truc Tran – 0396 296 580 – truc.tn@nso.com.vn
|