LOCATION & DISTANCE:
|
Road
|
To Hanoi City: 50km, To Vinh Yen city: 10km, To Noibai - Lao Cao High Express: 6km
|
Air
|
To Noi Bai International airport: 30km
|
Train
|
Yes (8km)
|
Seaport
|
To Hai Phong port: 120km
|
INFRASTRUCTURE:
|
Geological
|
Hard soil: 1.5-2.5kg/cm2
|
Internal traffic
|
Main road
|
Width: 39m, Number of lanes: 4-6 lanes
|
Side branch road
|
Width: 19.5m, Number of lanes: 2 lanes
|
Electricity supply
|
Voltage
|
Power line: 110/22KV
|
Power capacity
|
126MW
|
Clean water
|
Wattage
|
3,000 m3/day
|
Highest capacity
|
10,000 m3/day
|
Waste water treatment system
|
Wattage
|
10,000m3/day
|
Internet and telecommunications
|
ADSL, Fireber & Telephone line
|
LEASING PRICE:
|
Land
|
Land rents
|
120 -130USD
|
Lease term
|
50 years
|
Type/Grade
|
Level A
|
Payment methods
|
12 months
|
Deposit
|
5%
|
Minimum area
|
1 ha
|
Workshop
|
$3-4
|
Management fee
|
Management fee
|
0.35 USD/m2
|
Payment methods
|
yearly
|
Electricity price
|
Peak
|
0.1 USD
|
Normal
|
0.05 USD
|
Idle
|
0.03 USD
|
Payment methods
|
Monthly
|
Supplier
|
EVN
|
Clean water price nước
|
Water price
|
0.4 USD/m3
|
Payment methods
|
Monthly
|
Water supplier
|
Charged by Gov. suppliers
|
Wastewater fee
|
Price
|
$0.28/m3
|
Payment methods
|
Monthly
|
Water quality before treatment
|
Level B
|
Water quality after treatment
|
Level A (QCVN 40:2011/BTNMT)
|
Investment fields
|
High-tech industry, Telecommunications industry, electronic components, Assembly, manufacture of auto and motorcycle spare parts, Logistics and other supporting industries, Industrial equipment manufacturing
|
Contact:
|
National One Stop Services and Investments Organization
Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.
- Ms Hien Do – 0908 069 399 – hien.dt@nso.com.vn
- Mr Cuong Phan – 0913 855 528 – cuong.pd@nso.com.vn
- Ms. Truc Tran – 0396 296 580 – truc.tn@nso.com.vn
|